The following on-line index to the Willow Grove Naval Air Station Administrative Record contains on-line links to individual documents. These documents are in .PDF format. To open and view them, you will need to have a copy of Adobe Acrobat Reader installed on your computer. To download a free copy of Adobe Acrobat Reader, click here:

CD I.D. NO. Link to document EPA AR CATEGORY AND DOCUMENT TRACKING NUMBER DATE NO. OF PAGES DESCRIPTION OF DOCUMENT/ CORRESPONDENCE AUTHOR AND AUTHOR'S AFFILIATION RECIPIENT AND RECIPIENT'S AFFILIATION
Finding of Suitability for Transfer (FOST)
93   ShenandoahWoods_FOST_Sept2015.pdf   September 2015 5,532 pages Finding of Suitability to Transfer Naval Air Station Joint Reserve Base - Willow Grove Shenandoah Woods Housing Complex Warminster, Pennsylvania. Dept. of the Navy
Base Realignment & Closure
Program Mgmt. Office East
Philadelphia, PA.
 
56   FinalFOSTIvyland.pdf   January 26, 2012 52 pages Finding of Suitability to Transfer Naval Air Station Joint Reserve Base - Willow Grove Jacksonville Road Housing Ivyland Borouygh, Warminster, PA. Dept. of the Navy
Base Realignment & Closure
Program Mgmt. Office Northeast
Philadelphia, PA.
 
59   Shenandoah_Woods_FOST_July1312.pdf
Shenandoah Woods FOST July1312 errata sheet
  July 2012 67 pages FINDING OF SUITABILITY TO TRANSFER
NAVAL AIR STATION JOINT RESERVE BASE – WILLOW GROVE
SHENANDOAH WOODS HOUSING COMPLEX
WARMINSTER, PENNSYLVANIA
(Approx. 55.12 acres)
Dept. of the Navy
Base Realignment & Closure
Program Mgmt. Office Northeast
Philadelphia, PA.
 
57   Shenandoah_Woods_FOST FINAL.pdf   March 2012 66 pages FINDING OF SUITABILITY TO TRANSFER
NAVAL AIR STATION JOINT RESERVE BASE – WILLOW GROVE
SHENANDOAH WOODS HOUSING COMPLEX
WARMINSTER, PENNSYLVANIA
Dept. of the Navy
Base Realignment & Closure
Program Mgmt. Office Northeast
Philadelphia, PA.
 
53   DraftFOSTHorsham.pdf   August 2011 313 pages Finding of Suitability to Transfer Horsham Memorial U.S. Army Reserve Center (PA046). (7 acres to Hatboro Horsham School District for proposed reuse as vehicle and parts storage, vehicle maintenance, and recreational playfield facilities.) Jeffrey M. Hrzic, Chief, Environmental Div., Dept. of the Army, 99th Regional Support Command, Fort Dix.  
53   ECP2007.pdf   April 2007 1,198 pages Environmental Condition of Property Final Report
HORSHAM MEMORIAL U.S. ARMY RESERVE CENTER (PA046)
CH2M HILL U.S. Army Corps of Engineers - Louisville District
53   ECPUPDATEPA046.pdf   June 2011 134 pages Environmental Condition of Property Update Report. Horsham Memorial USAR Center (PA046) XCEL Engineering, Inc. U.S. Army Corps of Engineers - Louisville District
CD# 64   HorshamUSARC_Final_SEAandDRAFTFNSI-SIGNED.pdf
HorshamUSARC_FINALSEAandFINALNSI_2013_06_05.pdf
  March 2013
June 5, 2013 (FINAL Finding NSI)
399 pages
13 pages (FINAL Finding NSI)
Final Supplemental Environmental Assessment for BRAC 2005 Closure, Disposal, and Reuse of the Horsham Memorial United States Army Reserve Center, Horsham, PA
DRAFT FINDING OF NO SIGNIFICANT IMPACT
FINAL FINDING OF NO SIGNIFICANT IMPACT (filed behind second tab in the same loose-leaf binder)
U.S. Army Corps of Engineers, Mobile District U.S. Army Reserve 99th Regional Support Command
00.01 Restoration Advisory Board Meetings
49   Minutes_1.pdf
(this PDF contains bookmarks by the year & date of each meeting)
  May 24, 2011 313 Compendium of Restoration Advisory Board Meeting Minutes, 2004-2011 Russell E. Turner, Project Mgr. Naval Facilities Engineering Command &
Restoration Advisory Board
49   www.bracpmo.navy.mil
This website archives minutes of the meetings of the Willow Grove Naval Air Station Joint Reserve Base Restoration Advisory Board.
      Restoration Advisory Board Meeting Minutes for the years 2012 and part of 2013 were not received by the Horsham Township Library. RAB minutes are available from the federal website at the URL http://www.bracpmo.navy.mil    
  RAB Meeting minutes - 2012 RAB Meeting # 48 Minutes
RAB Meeting # 49 Minutes
RAB Meeting # 50 Minutes
RAB Meeting # 51 Minutes
  March 7, 2012
June 6, 2012
Sept. 5, 2012
Dec. 5, 2012
42 pages
25 pages
41 pages
36 pages
Restoration Advisory Board Meeting Minutes for 2012    
  RAB Meeting minutes - 2013 RAB Meeting # 52 Minutes
RAB Meeting # 53 Minutes
RAB Meeting # 54 Minutes
  April 24, 2013
Sept. 4, 2013
December 4, 2013
27 pages
18 pages
21 pages
Restoration Advisory Board Meeting Minutes for 2013    
  RAB Meeting minutes - 2014 RAB Meeting # 55 Minutes
RAB Meeting # 56 Minutes
  March 5, 2014
June 4, 2014
14 pages
13 pages
Restoration Advisory Board Meeting Minutes for 2014    
  RAB Meeting minutes - 2015 RAB Meeting # 57 Minutes
RAB Meeting # 58 Minutes
RAB Meeting # 59 Minutes
  June 10, 2015
September 16, 2015
December 9, 2015
24 pages
25 pages
15 pages
Restoration Advisory Board Meeting Minutes for 2015    
01.01 Pre-Remedial Investigation Correspondence - Basewide
3 333 333.pdf 01.01.00.0001 2/22/1986 1 Transmittal Letter: Initial Assessment Study (IAS) B.R. Carter/NAS Willow Grove Francis Mulhern/EPA III
2 275 275.pdf 01.01.00.0002 11/14/1989 19 Letter: EPA review of TRe Initial Assessment Study (Rodgers and Halpren, February 1996; and Plan of Action for Site Inspection (EA Engineering, February 1988) James Harper/EPA III NAS Willow Grove
2 276 276.pdf 01.01.00.0003 12/20/1989 2 Letter: Request for extension to prepare additional information needed for TRe Hazard Ranking System (HRS) Tom Sheckels/NORTRDIV James Harper/EPA III
2 277 277.pdf 01.01.00.0004 2/28/1990 4 Letter: responding to EPA's request for additional HRS information; and additional HRS information for review Tom Sheckels/NORTRDIV NAS Willow Grove
2 278 278.pdf 01.01.00.0005 3/8/1990 1 Letter: NAS Willow Grove comments on TRe additional information for TRe Hazard Ranking System (HRS) M.J. Zook/NAS Willow Grove NORTRDIV
2 279 279.pdf 01.01.00.0006 10/2/1990 1 Letter: EPA III's potential National Priority List Sites for 1991 and 1992 David Olson/CNO, Navy NAVFAC, Navy
2 280 280.pdf 01.01.00.0007 5/17/1991 9 Letter: HRS scoring checklist indication deficiencies TRat need to be addressed Henry Sokolowski/EPA III Stephen KeiTR/Willow Grove
2 281 281.pdf 01.01.00.0008 12/4/1991 1 Letter: PPA to Navy regarding compliance wiTR CERCLA Tom Voltaggio/EPA III Nancy Stehle/Navy, Washington
2 282 282.pdf 01.01.00.0009 1/2/1992 3 Letter: Navy response to EPA III letter dated December 4, 1991 RE: Insufficient data to complete HRS P.A. Rakowski/ATLANDIV Tom Voltaggio/EPA III
2 283 283.pdf 01.01.00.0010 1/16/1992 2 Letter: NAS Willow Grove compliance wiTR CERCLA section 120; forwarding additional information Frank Klanchar/NORTRDIV Henry Sokolowski/EPA III
2 286 286.pdf 01.01.00.0011 2/24/1992 3 Letter: Request identification of compounds Brad Helland/PRC Environmental Paul Greco/NAS Willow Grove
2 284 284.pdf 01.01.00.0012 2/28/1992 2 Letter: Follow-up of January 15 and 16, 1992 Meeting discussing EPA III requirements to complete TRe HRS Jacqueline Shafer/Navy, Washington Edwin Erickson/EPA III
2 285 285.pdf 01.01.00.0013 7/7/1992 1 Letter: Request for information on NAS Willow Grove Brad Helland/PRC Environmental Frank Klanchar/NORTRDIV
2 288 288.pdf 01.01.00.0014 12/7/1992 1 Transmittal Letter: Prescore Report for Sites 1,2,3, and 5 Don Blackert/Halliburton NUS Frank Klanchar/NORTRDIV
1 139 139.pdf 01.01.00.0015 10/5/1994 1 Letter: Discussion of proposed NPL listing and source of contamination of Air Force Reserve (AFR) Robert Lewandowski/Navy Tim Wise/Air Force, CEVR
1 142 142.pdf 01.01.00.0016 10/18/1994 4 Letter: Air Force response to proposed NPL listing of Willow Grove Air Reserve Station Richard Moss/Air Force Administrator/EPA III
1 143 143.pdf 01.01.00.0017 9/29/1995 1 E-mail: Notification of NAS Willow Grove officially being listed on NPL Jim Colter/NORTRDIV Robert Lewandowski/Navy
1 113 113.pdf 01.01.00.0018 8/29/1996 3 Letter: Discussion of groundwater users in TRe vicinity of ARS and NASJRB Willow Grove Drew Lausch/EPA III Hal Dusen/Willow Grove - Air Force, Jim Colter/NORTRDIV
1 14 14.pdf 01.01.00.0019 9/12/1997 1 Transmittal Letter: Borehole geophysical logs, summaries of TRe heat-pulse-flowmeter measurements, and digital log data for review Dennis Risser/USGS Jim Colter/NORTRDIV
1 16 16.pdf 01.01.00.0020 2/16/1998 1 Transmittal Letter: Evaluation of Geophysical Logs, Phase I Dennis Risser/USGS Jim Colter/NORTRDIV
1 17 17.pdf 01.01.00.0021 10/29/1998 1 Transmittal Letter: Borehole geophysical logs, summaries of TRe heat-pulse-flowmeter measurements, and digital log data for review Dennis Risser/USGS Jim Colter/NORTRDIV
1 13 13.pdf 01.01.00.0022 3/19/2001 1 Transmittal Letter: Draft copy of TRe USGS Open-File Report "Altitude and Configuration of TRe Regional Potentiometric Surface, Willow Grove Naval Air Station/Joint Reserve Base and Vicinity, Horsham Township, Montgomery County, October 7-8, 1999 for review Ron Sloto/USGS Jim Colter/NORTRDIV
2 268 268.pdf 01.01.00.0023 5/14/2001 4 Transmittal Letter: Draft USGS Water Resources Investigations Report - Hydrogeological Investigation at Site 5 Ron Sloto/USGS Jeff Dale/NORTRDIV, Jim Colter/NORTRDIV, Russ Turner/Tetra Tech NUS, Lisa Bradford/EPA III
2 266 266.pdf 01.01.00.0024 7/5/2001 1 Transmittal Letter: Draft USGS Water Resources Investigations Report - Evaluation of Borehole Geophysical Logs and Hydraulic Tests conducted in Supply Wells 1 and 2 for review Ron Sloto/USGS Jim Colter/NORTRDIV
    5090BPMO.pdf 5090 BPMO NE/RL Ser 09-077 January 16, 2009 1 page Letter concerns Site Screening Area (SSA) 12…to be referred to Site 12, South Landfill Robert F. Lewandowski, P.E., BRAC Environmental Coordinator, Dept. of the Navy Lisa M. Cunningham, Remedial Project Manager, US EPA Region III
Charles Clark, Project Officer, PA Dept. of Environmental Protection, SE Regional Office
01.02 Preliminary Assessment Documents - Basewide
3 340 340.pdf 01.02.00.0001 2/1/1986 170 Report: Initial Assessment Study of NAS Willow Grove (NEESA 13-101) NEESA Navy
27   WGARS_ROW20080410.pdf   April 2008 184 Draft Right-of-Way Follow-On Investigation Report, Willow Grove ARS, POL Site (ST-01) Tetra Tech, Inc. U.S. Air Force Reserve Command HQ AFRC/A70A
CD # 76   Final_Radiological_Mgmt_Plan.pdf   March 2014 645 pages Final Basewide Radiological Management Plan Tetra Tech, Inc. Dept. of the Navy, Base Realignment & Closure Program Mgmt. Office Northeast, Philadelphia
CD # 65   65_DraftHRA_NASJRBWillowGrove11-30-12.pdf
65_HRA_ReferenceDocuments.pdf
65_WGHistoricalPhotographsandMaps.pdf
65_ResponsesToComments__2013_05_10.pdf
  Nov. 2012
May 10, 2013
Historical Radiological Assessment: 232 pages
Reference Documents: 7,911 pages
Photos & Maps: 38 pages
Responses to Comments: 20 pages
Draft Historical Radiological Assessment: History of the Use of General Radioactive Mateials 1942 - 2011
HRA Reference Documents
Willow Grove Historical Photographs and Maps
Responses to Comments regarding the Draft Historical Radiologic Assessment
Willington Lin, P.E., BRAC Environmental Coordinator Lisa Cunningham, Remedial Project Manager, U.S. EPA, Region III, Philadelphia and
Margaret Pollich, Project Officer, Environmental Cleanup Program, PA Dept. of Environmental Protection
01.03 Site Investigation Documents - Basewide
3 306 306.pdf 01.03.00.0001 4/1/1989 315 Report: Final Report Environmental Test Boring Investigation at TRe Air National Guard Facility EA Engineering Navy
01.04 Expanded Site Investigation Documents - Basewide
2 267 267.pdf 01.04.00.0001 3/6/2002 74 Report: Final Interpretation of Borehole Geophysical Logs Aquifer-Isolation Tests, and Water Quality in Supply Wells 1 and 2 USGS Navy
2 269 269.pdf 01.04.00.0002 3/6/2002 45 Report: Final Hydrogeological Investigation at Site 5 USGS Navy
    TechMemo_Site5Groundwater_OU2.pdf   February 2007 145 pages Technical Memorandum of Risk Assessment Evaluation for Site 5 - Fire Training Area Groundwater (OU 2) Russell E. Turner, Project Mgr.
Tetra Tech NUS
King of Prussia, PA
Naval Facilities Engineering Command Mid-Atlantic
9742 Maryland Ave.
Norfolk, VA 23511-3095
CD # 68   68_Final-HRA-NASJRB-WillowGrove.pdf
68_ReferenceDocuments.pdf
68_WGHistoricalPhotosandMaps.pdf
  July 2013 Historical Radiological Assessment: 244 pages
Reference Documents: 7,923 pages (137 documents)
Photos & Maps: 38 pages
Final Historical Radiological Assessment: History of the Use of General Radioactive Materials 1942 to 2011
Reference Documents
Willow Grove Historical Photographs and Maps 6-1-12
Willington Lin, P.E., BRAC Environmental Coordinator by direction of BRAC PMO Lisa Cunningham, Remedial Project Mgr.
U.S. Environmental Protection Agency, Region III, 1650 Arch St., Philadelphia, PA
Margaret Pollich, Project Officer, Environmental Cleanup Program
PA Dept. of Environmental Protection, 2 East Main St., Norristown, PA
CD # 77   TSP-IR-3-SCOPING-SURVEY.pdf Contract #: N62470-08-D-1001 | Task order WE42 April 2014 23 pages Draft Task Specific Plan IR (Installation Restoration) Site 3, Ninth Street Landfill Scoping Survey (as recommended in the Historical Radiological Assessment) Lawson Bailey, Project Mgr., Tetra Tech, Inc. Lawson Bailey, Project Mgr., Tetra Tech, Inc.
CD # 78   Site-12-Draft-Scoping-Survey-TSP.pdf Contract #: N62470-08-D-1001 | Task order WE42 April 2014 22 pages Draft Task Specific Plan IR (Installation Restoration) Site 12, South Landfill Scoping Survey (as recommended in the Historical Radiological Assessment) Lawson Bailey, Project Mgr., Tetra Tech, Inc. Lawson Bailey, Project Mgr., Tetra Tech, Inc.
01.05 Hazard Ranking System (HRS) Documents - Basewide
3 301 301.pdf 01.05.00.0001 12/1/1992 59 Report: Prescore Report for Sites 1, 2, 3, and 5, CTO 0011 Halliburton NUS Navy
03.01 Remedial Investigation (RI) Correspondence - Basewide
3 299 299.pdf 03.01.00.0001 4/1/1987 5 Transmittal of March 10, 1987 Kick off meeting minutes EA Engineering Ken Petrone/NORTRDIV
3 328 328.pdf 03.01.00.0002 2/26/1988 1 Transmittal Letter: Draft Plan of Action for TRe Site Inspection Tom Sheckels/NORTRDIV Karen Wolper/EPA III
3 331 331.pdf 03.01.00.0003 4/7/1988 3 Letter: Agency Review Meeting minutes on TRe Site Inspection Workplan Ken Petrone/NORTRDIV File
3 339 339.pdf 03.01.00.0004 8/29/1990 25 Transmittal Letter and Report: No furTRer Action Documents for Remedial Investigation. Bobby Clary/Air Force NORTRDIV
3 325 325.pdf 03.01.00.0005 1/27/1992 1 Transmittal Letter: Tabulated Analytical Data, CTO 0011 Don Blackert/Halliburton NUS Frank Klanchar/NORTRDIV
2 262 262.pdf 03.01.00.0006 3/3/1993 2 Transmittal Letter: Final Remedial Investigation (RI) Report for Sites 1, 2, 3, and 5 Tom Sheckels/NORTRDIV TRC
1 85 85.pdf 03.01.00.0007 8/3/1994 1 Letter: Request for information on TRe 9TR Street Landfill and, specifically, TRe CommonwealTR Corporate Center; also requesting to inspect TRe 9TR Street Landfill site Stephen McNelis/Pennoni Associates Jim Colter/NORTRDIV
1 86 86.pdf 03.01.00.0008 8/8/1994 2 Letter: Response to Pennoni Associates letter dated August 3, 1994 RE: request for information on 9TR Street Landfill, Site 3 Jim Colter/NORTRDIV Stephen McNelis/Pennoni Associates
1 87 87.pdf 03.01.00.0009 8/8/1994 2 Letter: Informing Matrix Realty of response to Pennoni Associates letter dated August 3, 1994 RE: request for information on 9TR Street Landfill, Site 3 Jim Colter/NORTRDIV Richard Johnson/Matrix Realty
1 140 140.pdf 03.01.00.0010 10/17/1994 2 Letter: Proposal of a TRree-party Federal Facilities Agreement (FFA) between Navy, CommonwealTR of Pennsylvania, EPA Henry Sokolowski/EPA III Eric Milner/Willow Grove - Navy
1 141 141.pdf 03.01.00.0011 11/1/1994 1 Letter: Response to Henry Sokolowski's (EPA III) letter dated October 17, 1994 RE: TRree-party Federal Facilities Agreement (FFA) Jim Colter/NORTRDIV Lorie Baker/EPA III
1 144 144.pdf 03.01.00.0012 3/6/1996 1 Letter: Request to handle Site 10 - Fuel Farm under PADEPs Waste Management Regulations in lieu of TRe CERCLA Hazardous Substance Response Jim Colter/NORTRDIV Drew Lausch/EPA III
1 146 146.pdf 03.01.00.0013 3/14/1996 2 Letter: Response to Jim Colter's (NORTRDIV) letter dated March 6, 1996 RE: Request to handle Site 10 -Fuel Farm under PADEPs Waste Management Regulations in lieu of TRe CERCLA Hazardous Substance Response Drew Lausch/EPA III Jim Colter/NORTRDIV
1 147 147.pdf 03.01.00.0014 6/19/1996 2 Letter: Site Visit and Public HealTR Assessment Drew Lausch/EPA III Tom Hartman/Pennsylvania Department of HealTR
1 152 152.pdf 03.01.00.0015 7/2/1996 2 Letter: Trip Report: ATSDR site visit; June 26 - 27, 1996 Wendy Bridges N/A
1 151 151.pdf 03.01.00.0016 7/18/1996 2 Letter: ATSDR site ranking based on June 1997 visit Sandra Isaacs/ATSDR Commanding Officer/NASJRB Willow Grove
1 148 148.pdf 03.01.00.0017 8/27/1996 3 Letter: Installation Visit/Meeting August 27 - 28, 1996 Drew Lausch/EPA III Hal Dusen/Willow Grove - Air Force
1 149 149.pdf 03.01.00.0018 8/28/1996 3 Letter: Installation Visit/Meeting August 27 - 28, 1996 Drew Lausch/EPA III Jim Colter/NORTRDIV
1 101 101.pdf 03.01.00.0019 8/29/1996 3 Transmittal: Oversight Assignment/Risk Assessment Support; background information and guidance on No FurTRer Action sites Drew Lausch/EPA III Emily Olds/Gannett Fleming
1 102 102.pdf 03.01.00.0020 8/29/1996 2 Request for information to facilitate evaluation of No FurTRer Action Sites Drew Lausch/EPA III David Kennedy/PADEP
1 103 103.pdf 03.01.00.0021 9/10/1996 1 Transmittal: Analytical results from Site 6 -Abandoned Rifle Range Jim Colter/NORTRDIV Drew Lausch/EPA III
1 104 104.pdf 03.01.00.0022 9/16/1996 1 Transmittal: Analytical results from Site 6 -Abandoned Rifle Range Drew Lausch/EPA III Emily Olds/Gannett Fleming
1 114 114.pdf 03.01.00.0023 10/31/1996 5 Comments: by EPA on TRe Draft Off-site Well Sampling Plan Drew Lausch/EPA III Hal Dusen/Willow Grove - Air Force, Jim Edmond/Willow Grove - Navy
1 115 115.pdf 03.01.00.0024 11/5/1996 2 Comments: by ATSDR on TRe Draft Sampling Plan David Fowler/ATSDR Jim Edmond/Willow Grove
1 116 116.pdf 03.01.00.0025 12/20/1996 1 Transmittal: Analytical Results from Residential well sampling Jim Colter/NORTRDIV Steve Hirsh/EPA III
1 118 118.pdf 03.01.00.0026 12/23/1996 1 Notification of distribution of Residential Well Sampling Results Russ Turner/BRE Jim Colter/NORTRDIV
1 77 77.pdf 03.01.00.0027 1/6/1997 2 Letter: Change in EPA III Remedial Project Manager (RPM) for Willow Grove Drew Lausch/EPA III Hal Dusen/Willow Grove - Air Force, Jim Edmond/Willow Grove - Navy
1 24 24.pdf 03.01.00.0028 3/14/1997 3 Meeting Minutes: from March 11, 1997 discussing TRe scope of Delivery Order 74 (Soil Contamination Delineation at TRe Navy Fuel Farm) Scott Dobson/EA Attendees
1 78 78.pdf 03.01.00.0029 5/6/1997 3 Meeting minutes for May 5, 1997 Phase II RI meeting Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 80 80.pdf 03.01.00.0030 5/27/1997 8 Transmittal ; and report of Proposed Monitoring Well Placement at Site 5, CTO 277 Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 60 60.pdf 03.01.00.0031 6/20/1997 1 Transmittal Letter: Distribution of Section 4 Figures for TRe Phase II RI Workplan, CTO 277 Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 61 61.pdf 03.01.00.0032 7/16/1997 1 Transmittal Letter: Phase II RI Field Notes and Logs, CTO 277 Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 132 132.pdf 03.01.00.0033 9/4/1997 1 Transmittal: Draft Phase II RI Addendum Report (Tinius Olsen Vicinity) for review Russ Turner/BRE Jim Colter/NORTRDIV
1 131 131.pdf 03.01.00.0034 9/11/1997 2 Tinius Olsen comments on Draft Phase II RI Addendum (Tinius Olsen Vicinity); and requests David Fennimore/EarTR Data Jim Colter/NORTRDIV
1 130 130.pdf 03.01.00.0035 9/17/1997 1 Transmittal: Final Phase II RI Addendum Report -Tinius Olsen Vicinity, CTO 277 Russ Turner/BRE Jim Colter/NORTRDIV
1 108 108.pdf 03.01.00.0036 9/19/1997 2 Letter: Request for preliminary RI groundwater data for TRe Privet Road Compound Julie Widman/Montgomery Watson Jim Colter/NORTRDIV
1 107 107.pdf 03.01.00.0037 10/2/1997 1 Transmittal: Privet Road Compound Area preliminary RI groundwater data. Russ Turner/BRE Jim Colter/NORTRDIV
1 106 106.pdf 03.01.00.0038 10/22/1997 6 Letter: Water analysis of Strawbridge Property adjacent to Air Force Fuel Farm site Michael McGee/Horsham Township Jim Edmond/Willow Grove
1 1 1.pdf 03.01.00.0039 3/13/1998 2 Transmittal Letter: Site Management Plan, Willow Grove, CTO 278 Jim Colter/NORTRDIV Darius Ostrauskas/EPA III
1 64 64.pdf 03.01.00.0040 4/20/1998 3 Transmittal Letter: and distribution list - Draft Phase II RI Report and Summary Document, CTO 277 Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 76 76.pdf 03.01.00.0041 5/20/1998 1 Letter: Summary of Survey services to be conducted at Site 1 (Privet Road Compound) and Site 5 (Fire Training Area) Russ Turner/Tetra Tech NUS Wayne Himes/GTS Technologies
1 65 65.pdf 03.01.00.0042 6/4/1998 1 E-mail: Notification: of submission of Draft Phase II Report to Gannett Fleming Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
Transmittal Letter: Notification of distribution of Draft
1 66 66.pdf 03.01.00.0043 12/22/1998 1 Phase II RI Report and RAB Member application to Virginia Cunningham, CTO 277 Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 105 105.pdf 03.01.00.0044 3/5/1999 1 Letter: Notification of change in EPA III Project Manager Darius Ostrauskas/EPA III Jim Colter/NORTRDIV
1 84 84.pdf 03.01.00.0045 3/10/1999 14 Letter: wiTR EVS presentation, CTO 277 Tara Beckman/Tetra Tech NUS Jim Colter/NORTRDIV
1 83 83.pdf 03.01.00.0046 3/12/1999 1 Transmittal: Hydrogeological Discussion Documents from RI results, Site 5 - Fire Training Area Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
Transmittal Letter: wiTR Comments from TRe EPA
3 343 343.pdf 03.01.00.0047 4/4/1999 17 Toxicologist for Human HealTR and Ecological Risk Assessments in TRe Draft Phase II RI Report for NASJRB Willow Grove Lori Baker/EPA Jim Colter/NORTRDIV
1 68 68.pdf 03.01.00.0048 4/9/1999 22 Comments: EPA comments on TRe Phase II RI Lorie Baker/EPA III Jim Colter/NORTRDIV
2 270 270.pdf 03.01.00.0049 4/23/1999 1 Transmittal: Evaluation of Geophysical Logs, Phase II Dennis Risser/USGS Jim Colter/NORTRDIV
1 55 55.pdf 03.01.00.0050 7/14/1999 2 Letter: Request for identification of substantive chemical- and location- specific requirements of environmental laws TRat are potential applicable or relevant and appropriate requirements (ARARs) for TRe Willow Grove Site, Horsham Township, PA Jim Colter/NORTRDIV Lorie Baker/EPA III
1 69 69.pdf 03.01.00.0051 9/24/1999 3 Letter: Response to July 14, 1999 request for substantive location- and chemical-specific requirements of Federal environmental laws TRat are Applicable or Relevant and appropriate requirements (ARARs) for Willow Grove Lorie Baker/EPA III Jim Colter/NORTRDIV
1 82 82.pdf 03.01.00.0052 10/13/1999 11 Response to comments: Status of Navy action items from April 14, 1999 Technical Meeting Tetra Tech NUS Navy
1 98 98.pdf 03.01.00.0053 3/1/2000 1 Transmittal: HealTR and Safety Plan - 1997 Russ Turner/Tetra Tech NUS Pete Schultes (A.C. Schultes)
1 99 92.pdf 03.01.00.0054 3/31/2000 2 Letter: Well Pump replacement project; decision to not extend stilling tube passed TRe pump Russ Turner/Tetra Tech NUS Pete Schultes (A.C. Schultes)
1 12 12.pdf 03.01.00.0055 5/23/2000 8 Memorandum: Project Review Comments for Military Working Dog Facility wiTR Willow Grove Request for Project Site Approval, Schematic Drawing, Site Plan, and Vicinity Map Jim Colter/NORTRDIV George Wiese/NORTRDIV
1 81 81.pdf 03.01.00.0056 5/24/2000 1 Transmittal: Draft Workplan for Site 5 Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 129 129.pdf 03.01.00.0057 11/1/2000 3 EPA Hazardous Site Clean up summary of PCB contaminated soil removal at Site 1 - Privet Road Compound Area. EPA Region 3 Jim Colter/NORTRDIV
3 342 342.pdf 03.01.00.0058 1/9/2001 68 Letter: and attachments of Navy's Response to USEPA Region III Comments on Draft Phase II Remedial Investigation (RI) Report Dated April 1998; Naval Air Station Joint Reserve Base (NASJRB) Willow Grove, PA Jim Colter/ NORTRDIV Lisa Bradford/EPA Region III
1 79 79.pdf 03.01.00.0059 3/1/2001 2 Transmittal of Draft Figure of Proposed Site 5 Soil Sample Locations Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 70 70.pdf 03.01.00.0060 4/2/2001 6 Response to comments: Tetra Tech NUS (TtNUS) response to comments, Phase II RI Report Tetra Tech NUS Navy
1 89 89.pdf 03.01.00.0061 5/16/2001 2 Transmittal Letter: PADEP caseworkers file on Kellett Aircraft located east of Willow Grove Air Station; including February 26, 1998 letter RE: investigation of sources of potential migration of contamination at Kellett Aircraft Site Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 154 154.pdf 03.01.00.0062 8/20/2001 1 Letter: Transmittal: Draft Public HealTR Assessment for review Jeff Kellam/ATSDR Initial Draft Reviewers
1 155 155.pdf 03.01.00.0063 9/10/2001 6 Letter: EFANE and NASJRB comments on TRe Draft Public HealTR Assessment N/A N/A
1 150 150.pdf 03.01.00.0064 9/17/2001 2 Letter: Site Visit and Public HealTR Assessment Victoria SmiTR/ATSDR Commanding Officer/NASJRB Willow Grove
1 90 90.pdf 03.01.00.0065 unknown 4 Report of PCE Contamination of Water Well Nos. 1 and 2 investigation Lt. Cmdr. David C. Keturakis/NR EEU LANT Navy
35   CD35.pdf Contract Task Order 003 Nov. 2008 213 Feasibility Study for Site 5 - Fire Training Area Groundwater (OU 2) TETRA TECH NUS, INC. Naval Facilities Engineering Command Mid-Atlantic
03.03 Site Management Plans - Basewide
100   WillowGrove_SMPFY2016.pdf   February 2017 83 pages Site Management Plan Fiscal Year 2016 Former Naval Air Station Joint Reserve Base (NAS JRB) Willow Grove, Pennsylvania Willington Lin. P.E.
BRAC Environmental Coordinator
U.S. Environmental Protection Agencybr>Region III (3HS11)
Philadelphia, PA
91   WillowGrove_SMPFY2015.pdf   October 1, 2015 81 pages Site Management Plan
Fiscal Year 2015
Former Naval Air Station Joint Reserve Base (NAS JRB)
Willow Grove, Pennsylvania
Willington Lin. P.E.
BRAC Environmental Coordinator
U.S. Environmental Protection Agencybr>Region III (3HS11)
Philadelphia, PA
87   WillowGroveSMP-FY2014.pdf   December 2014 77 pages Site Management Plan
Fiscal Year 2014
Former Naval Air Station Joint Reserve Base (NAS JRB)
Willow Grove, Pennsylvania
Willington Lin. P.E.
BRAC Environmental Coordinator
U.S. Environmental Protection Agencybr>Region III (3HS11)
Philadelphia, PA
61   SMP_FY2012_24808.pdf PHIL-24808 October 2012 73 pages Site Management Plan
Fiscal Year 2012
Naval Air Station Joint Reserve Base (NAS JRB)
Willow Grove, Pennsylvania
Tetra Tech
Andrew Frebowitz,
Project Manager
U.S. Environmental Protection Agencybr>Region III (3HS11)
Philadelphia, PA
55   SMP_FY2011_Willow Grove_123011_24263.pdf PHIL-24611
Project # 02014
Dec. 30, 2011 71 pages Final Site Management Plan (SMP) for Fiscal Year 2011 (FY 2011) Naval Air Station Joint Reserve Base (NAS JRB) - Willow Grove Tetra Tech NUS, Inc.
Andrew Frebowitz,
Project Manager
Brian Helland
Base Realignment and Closure
Program Management Office, Northeast
Philadelphia
3 293 293.pdf 03.03.00.0001 2/1/1988 190 Report: Plan of Action for Site Inspection EA Engineering Navy
1 157 157.pdf 03.03.00.0002 12/1/1996 150 Report: Rough Draft Site Management Plan, CTO 278 (accepted as final document) Brown & Root Environmental Navy
1 3 3.pdf 03.03.00.0003 12/26/1996 1 Transmittal Letter: Rough Draft Site Management Plan submitted for Navy review Russ Turner/BRE Jim Colter/NORTRDIV
3 12 312.pdf 03.03.00.0004 1/1/1998 216 Report: Management Action Plan, Willow Grove Air Reserve Station, DO 5023 Montgomery Watson Air Force Reserve
1 2 2.pdf 03.03.00.0005 3/8/1999 1 Transmittal Letter: Rough Draft Site Management Plan copy submitted to April Flipse (PADEP), CTO 278 Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
4   18547 SMP Oct 2005.pdf PHIL-18547 October 2005 146 Site Management Plan for Naval Air Station Joint Reserve Base (NAS JRB) Willow Grove Pennsylvania Russ Turner/Tetra Tech NUS Engineering Field Activity Northeast
13 PHIL-21014 18547-Final.pdf   April 2007 59 Site Management Plan Fiscal Year 2006 Naval Air Station Joint Reserve Base (NAS JRB) Willow Grove Pennsylvania Russell E. Turner, Project Mgr./Tetra Tech NUS, Inc. Naval Facilities Enginerring Command Mid-Atlantic
18   21153-SMP.pdf   Sept 2007 55 Site Management Plan Fiscal Year 2007 Russell E. Turner, Project Mgr./Tetra Tech NUS, Inc. Naval Facilities Enginerring Command Mid-Atlantic
33   CD33.pdf PHIL-22203 Sept. 2008 60 Site Management Plan Fiscal Year 2008 TETRA TECH NUS, INC.
Russell E. Turner
Naval Facilities Engineering Command Mid-Atlantic
48 PHIL-23699 23699.pdf PHIL-22203 October 2010 68 Site Management Plan Fiscal Year 2010 TETRA TECH NUS, INC.
Russell E. Turner
Naval Facilities Engineering Command Mid-Atlantic
73 PHIL-25164 Willow GroveSMP-FY2013.pdf Contract No. N62470-08-D-1001
Contract Task Order WE05
November 2013 77 pages Site Management Plan Fiscal Year 2013 Andrew Frebowitz, Project Mgr., Tetra Tech Naval Facilities Engineering Command Mid-Atlantic
03.04 Remedial Investigation Work Plans, Progress Reports - Basewide
3 294 294.pdf 03.04.00.0001 4/1/1988 157 Report: Quality Assurance/Quality Control Project Plan for Installation Restoration Program Studies EA Engineering Navy
3 295 295.pdf 03.04.00.0002 4/1/1988 44 Report: Corporate Safety and HealTR Plan for Installation Restoration Program Studies EA Engineering Navy
3 291 291.pdf 03.04.00.0003 12/1/1988 465 Report: Final Analytical Data Report, Soil Vapor Contaminant Assessment, Vol. 1 EA Engineering Navy
3 292 292.pdf 03.04.00.0004 12/1/1988 292 Report: Final Analytical Data Report, Soil Vapor Contaminant Assessment, Vol. 2 EA Engineering Navy
3 290 290.pdf 03.04.00.0005 3/1/1989 125 Report: Interim Report Electromagnetic Survey, Soil Vapor Contaminant Assessment, and Revised Field Sampling Plan for Site Inspection Studies EA Engineering Navy
3 320 320.pdf 03.04.00.0006 9/1/1989 49 Report: Interim Report Site Inspection Studies EA Engineering Navy
1 159 159.pdf 03.04.00.0007 5/1/1990 240 Report: Final Site Inspection Studies, Vol. 1, Site Inspection EA Engineering Navy
3 289 289.pdf 03.04.00.0008 5/1/1990 101 Report: Final Site Inspection Studies, Vol. 2, Appendices EA Engineering Navy
3 315 315.pdf 03.04.00.0009 11/1/1990 299 Report: Master Plan for NAS Willow Grove N/A N/A
3 305 305.pdf 03.04.00.0010 8/1/1991 133 Report: Plan of Action for Extended Site Inspections EA Engineering Navy
3 311 311.pdf 03.04.00.0011 8/1/1991 87 Report: HealTR and Safety Plan, CTO 0011 Halliburton NUS Navy
3 316 316.pdf 03.04.00.0012 11/1/1991 88 Report: Final Interim Report on Investigations at TRe Navy Fuel Farm - November 1990 - July 1991 EA Engineering Navy
3 309 309.pdf 03.04.00.0013 11/8/1991 58 Report: Survey Report for Wells, Borings, and Test Pits Boucher & James Halliburton NUS
3 303 303.pdf 03.04.00.0014 1/1/1992 110 Report: Final Extended Site Inspections EA Engineering Navy
3 324 324.pdf 03.04.00.0015 1/1/1992 216 Report: Sample Analysis Data for Antenna Field Landfill, Fire Training Area, 9TR Street Landfill, and Privet Road, CTO 0011 Halliburton NUS Navy
3 302 302.pdf 03.04.00.0016 10/1/1992 110 Report: Final Treatment, Consolidation, Sampling, and Analysis of Investigation Derived Wastes (IDW) EA Engineering Navy
3 308 308.pdf 03.04.00.0017 12/22/1992 73 Report: Waste Handling Activities, CTO 0011 Don Blackert/Halliburton NUS Jim Colter/NORTRDIV
3 317 317.pdf 03.04.00.0018 9/1/1993 64 Report: Final Report of Interim Site Investigations Navy Fuel Farm EA Engineering Navy
3 322 322.pdf 03.04.00.0019 11/1/1993 170 Report: Final Workplan for Pilot-scale Testing of Free-Product Recovery and Aquifer Air Sparging at Navy Fuel Farm, CTO 0009 EA Engineering Navy
3 318 318.pdf 03.04.00.0020 2/24/1994 43 Report: Evaluation of Remedial Alternatives for Soil Piles, Navy Fuel Farm, CTO 0011 EA Engineering Navy
1 156 156.pdf 03.04.00.0021 4/1/1996 107 Report: HealTR and Safety Plan for Phase II Remedial Investigation, CTO 227 Brown & Root Environmental Navy
3 321 321.pdf 03.04.00.0022 11/1/1996 316 Report: Final Pilot Study Report - Product Recovery Pilot System, Navy Fuel Farm, CTO 0009 EA Engineering Navy
2 271 271.pdf 03.04.00.0023 1997 55 Report: Evaluation of Geophysical Logs, Phase I USGS Navy
1 158 158.pdf 03.04.00.0024 5/1/1997 300 Report: Phase II Remedial Investigation Work Plan, CTO 227 Brown & Root Environmental Navy
1 137 137.pdf 03.04.00.0025 7/1/1997 5 Transmittal Letter: of Work Plan Addendum for Site Investigation near Tinius Olsen Property, Phase II RI Jim Colter/NORTRDIV David Fennimore/EarTR Data
2 272 272.pdf 03.04.00.0026 1999 18 Report: Evaluation of Geophysical Logs, Phase II USGS Navy
2 274 274.pdf 03.04.00.0027 5/27/1999 50 Report: Workplan for Remediation of TRe Privet Road Site Foster Wheeler Navy
1 21 21.pdf 03.04.00.0028 8/2/2001 15 Report: Letter Report on Soil Sampling Program Results, former Sludge Drying Beds, Building 16 Robert Severance/Woodward & Curran Tim Bramhall/NORTRDIV
1 20 20.pdf 03.04.00.0029 10/12/2001 18 Report: Draft Letter Sampling and Analysis Plan and Site Safety, HealTR and Emergency Response Plan (SHERP) Addendum, CTO 0074 KaTRerine Sheedy/EA, Maria Magilton/EA Jim Colter/NORTRDIV
5 19419 19419 Site 1 PID SOIL WP.pdf 19419 September 2005 146 Work Plans for Soil Investigation, Summer 2005 VOC Soil to GW Impact, Site 1 - Privet Road Compound Soil (OU1) Russ Turner/Tetra Tech NUS Engineering Field Activity Northeast
5 19418 19418 Site 5 PID SOIL WP.pdf 19418 September 2005 160 Work Plans for Soil Investigation, Summer 2005 VOC Soil to GW Impact, Site 1 - Privet Road Compound Soil (OU1) Russ Turner/Tetra Tech NUS Engineering Field Activity Northeast
6 19444 19444 Site 1-GW-WP.pdf 19444 December 2005 183 Work Plan for Groundwater Investigation Summer 2005 Continued Groundwater Source Investigation Site 1 - Groundwater (OU 3) Russ Turner/Tetra Tech NUS Engineering Field Activity Northeast
7 19459 19459 FINAL.pdf 19459 December 2005 250 Work Plan for Groundwater Investigation Summer 2005 Continued Groundwater Source Investigation Site 3 - Ninth Street Landfill Soil and Groundwater Russ Turner/Tetra Tech NUS Engineering Field Activity Northeast
8 PHIL19692 Phil19692.pdf 19692 March 2006 46 Soil Investigation for Volatile Organic Compound Soil to Groundwater Impact Site 5 - Fire Training Area Russell E. Turner/Tetra Tech NUS Engineering Field Activity Northeast
8 PHIL19695 Phil19695.pdf 19695 March 2006 34 Soil Investigation for Volatile Organic Compound Soil to Groundwater Impact Site 1 - Privet Road Compound Russell E. Turner/Tetra Tech NUS Engineering Field Activity Northeast
10 PHIL19542 Phil19542.pdf 19542 July 2006 144 Technical Memorandum of Risk Assessment Evaluation for Site 2 - Antenna Field Landfill Soil and Groundwater (OU 5 and OU 9) Russell E. Turner/Tetra Tech NUS Naval Facilities Engineering Command Mid-Atlantic
11 PHIL19543 Phil19543.pdf 19543 July 2006 118 Technical Memorandum of Risk Assessment Evaluation for Site 5 - Fire Training Area Soil (OU4) Russell E. Turner/Tetra Tech NUS Naval Facilities Engineering Command Mid-Atlantic
14 PHIL20969 PHIL20969.pdf PHIL20969 April 2007 987 Work Plan for Test Pit Investigation Site 3 - Ninth Street Landfill Russell E. Turner/Tetra Tech NUS Naval Facilities Engineering Command Mid-Atlantic
20   21073-SSA12.pdf   Nov 2007 211 Work Plan for Soil Investigation at Site Screening Area 12 Between Site 2 and Site 5 Russell E. Turner/Tetra Tech NUS Naval Facilities Engineering Command Mid-Atlantic
24   Final21345.pdf
Final21345_appendA.pdf
Final21345_appendB.pdf
Final21345_appendC.pdf
  March 2008 Plan: 75p.
Append A: 141p.
Append B: 325p.
Append C: 3p. (maps)
Sampling and Analysis Plan for Interim Groundwater Monitoring Site 3 - Ninth Street Landfill. Russell Turner, Project Mgr., Tecta Tech NUS, Inc. Naval Facilities Engineering Command Mid-Atlantic
CD34   CD34.pdf
CD34_Figures_Tables.pdf
CD34_appendix_A_B_C.pdf
Contract Task Order 412 Nov. 2008 CD34.pdf: 108p.
CD34_Figures: 18p.
CD34_appendices: 650p.
Sampling and Analysis Plan for Landfill Delineation Site 3 - Ninth Street Landfill TETRA TECH NUS, INC. Tom Johnston Naval Facilities Engineering Command Mid-Atlantic
CD# 66   WG Site 5 FFTA Bioremediation Status Report 120412 - 25037.PDF Contract Task Order: WE05 Dec. 4, 2012 11 pages Bioremediation Status Report Site – 5 Former Fire Training Area Andrew Frebowitz, Project Manager, Tetra Tech Brian Helland, Base Realignment & Closure Program Mgmt. Office, NE, Philadelphia
CD# 72   Final Status Report for Site 5 - Fire Training Area Groundwater Contract No. N62470-08-D-1001
Contract Task Order: WE05
October 2013 19 pages [Final] Status Report for the Bioremediation of Site 5 (Former Fire Training Area) Andrew Frebowitz, Project Manager, Tetra Tech Brian Helland, Base Realignment & Closure Program Mgmt. Office, NE, Philadelphia
CD # 70
Comments
  Draft-Willow_Grove_Basewide_Rad_MgtPln.pdf
Responses to Comments re Draft
Contract # N62470-08-D-1001, Contract Task Order WE42 August 2013
February 4, 2014
549 pages
9 pages
Draft Basewide Radiological Management Plan, Naval Air Station Joint Reserve Base Willow Grove
Responses to Comments regarding the Draft Basewide Radiologic Management Plan
Lawson Bailey, Project Mgr. Tetra Tech, Inc., Pittsburgh, PA
Willington Lin, BRAC Environmental Coordinator
Dept. of the Navy, Base Realignment & Closure Program Mgmt. Office Northeast, Phila., PA
CD # 75   Willow Grove Phase II RI Site 12 021814 - 24951.pdf Contract # N62470-08-D-1001, Contract Task Order WE05 February 2014 7,244 pages Phase II Remedial Investigation Report for Site 12 - South Landfill Andrew Frebowitz, Project Mgr. Tetra Tech, Inc., King of Prussia, PA Naval Facilities Engineering Command Mid-Atlantic, Norfolk, VA 23511-3095
03.07 Remedial Investigation (RI) Reports Basewide
3 307 307.pdf 03.07.00.0001 2/1/1993 520 Report: Remedial Investigation Report for Sites 1, 2, 3, and 5, Vol. 2, CTO 0011 Halliburton NUS Navy
3 347 347.pdf 03.07.00.0002 9/1/1997 57 Report: Addendum Remedial Investigation Report for Site investigation Near TRe Tinius Olsen Property Brown & Root Environmental Navy NORTRDIV
1 160 160.pdf 03.07.00.0003 4/1/1998 600 Report: Draft Phase II Remedial Investigation, Vol. 1 -Text, CTO 277 Brown & Root Environmental Navy
1 161 161.pdf 03.07.00.0004 4/1/1998 700 Report: Phase II Remedial Investigation, Vol. 2 -Appendices, CTO 277 Brown & Root Environmental Navy
1 162 162.pdf 03.07.00.0005 4/1/1998 30 Report: Draft Phase II Remedial Investigation Report, Summary Document, CTO 277 Brown & Root Environmental Navy
3 350 350.pdf 03.07.00.0006 2/22/2002 591 Report: Remedial Investigation Report for Site 5 -Fire Training Area Tetra Tech NUS Navy EFANE
4 19419 19419 Site 1 PID SOIL WP.pdf   Sept. 2005 19419 Work Plans for Soil Investigation, Summer 2005 VOC Soil to GW Impact, Site 1 - Privet Road Compoind Soil (OU1) Tetra Tech NUS Navy EFANE
4 19418 19418 Site 5 PID SOIL WP.pdf   Sept. 2005 19419 Work Plans for Soil Investigation, Summer 2005 VOC Soil to GW Impact, Site 5 - Fire Training Area Soil (OU4) Tetra Tech NUS Navy EFANE
17   PHIL20936.pdf   June 2007 334 Remedial Investigation Report Adendum Six for Site 5 - Fire Training Area Soil (OU 4) Russell E. Turner, Tetra Tech NUS, Inc. Naval Facilities Engineering Command Mid-Atlantic
22   21228.pdf   January 2008 71 Site 1 Privet Road Compound Remedial Investigation Addendum 5 Groundwater (OU 3) Russell E. Turner, Tetra Tech NUS, Inc. Naval Facilities Engineering Command Mid-Atlantic
26   CD26.pdf Contract Task Order 0060, Modification # 002 April 2008 184 Draft Right-of-Way Investigation Follow-on Report Petroleum, Oil, and Lubricants Site (ST-01) TETRA TECH, INC.
Andrew F. Johnson
U.S. Air Forse Reserve Command HQ AFRC/A70A
28   CD28.pdf Contract Task Order No. 412 August 2008 165 Interim Groundwater Monitoring Report Round 1 Site 3 - Ninth Street Landfill TETRA TECH, INC.
Russell E. Turner
Base Realignment and Closure Program Management Office
36   CD36.pdf Contract Task Order No. 412 Dec. 2008 125 Interim Groundwater Monitoring Report - Round 2 Site 3 - Ninth Street Landfill TETRA TECH NUS, INC. Naval Facilities Engineering Command Mid-Atlantic
37   CD37.pdf Contract Task Order No. 412 January 2009 24 Test Pit Investigation Report Site Screening Area (SSA) 4 TETRA TECH NUS, INC. Naval Facilities Engineerinf Command Mid-Atlantic
54   CD54rev.pdf (revised Oct. 2012)
CD54.pdf (superceded)
Contract Task Order No. WE05 October 2011 2 vols. | 1,876 pages Remedial Investigation Report for Site 3 - Ninth Street Landfill
(Revised report contains updated Appendix J)
TETRA TECH NUS, INC. Naval Facilities Engineerinf Command Mid-Atlantic
    NASJRB20120417.pdf Project No. 02014 April 11, 2012 44 pages Final Groundwater Monitoring Report, Site 1 - Privet Road Compound TETRA TECH NUS, INC. Base Realignment and Closure Program Management office, Northeast
filed in report folder with the above document: Final Groundwater Monitoring Report...April 11, 2012   NASJRB20120918.pdf   September 18, 2012 15 pages Institutional Control Inspection Report for Site 1 - Privet Road Compound Groundwater (OU-3) Willington Lin, P.E.
BRAC Environmental Coord.
Ms. Lisa Cunningham
Remedial Project Mgr.
US EPA, Region III
Philadelphia
filed in report folder with the above document: Final Groundwater Monitoring Report...April 11, 2012   AGS-ICIC_LUCsite1__20130927.pdf   November 21, 2013 52 pages Institutional Control Inspection Report for Site 1 - Privet Road Compound Groundwater (OU-3)
(inspection performed September 27, 2013)
Gregory K. Willis
Restoration Branch, National Guard Bureau, Joint Base Andrews, MD 20762-5157
Ms. Lisa Cunningham
Remedial Project Mgr.
US EPA, Region III
Philadelphia
Ms. Margaret Pollich
Project Officer
PA Dept. of Environmental Protection
Norristown, PA
CD 58 PHIL-24624 CD58.pdf Contract No. N62470-08-D-1001
Contract Task Order WE05
April 2012 191 pages | 11.4 MB Building 21 Lead Investigation Report Andrew Frebowitz,
Project Mgr.
TETRA TECH
Naval Facilities Engineering Command Mid-Atlantic
03.08 Remedial Investigation ATSDR HealTR Assessments - Basewide
1 153 153.pdf 03.08.00.0001 10/15/1996 29 Report: Transmittal of ATSDR Site Summary for June 1997 Site visit Sandra Isaacs/ATSDR Commanding Officer/NASJRB Willow Grove
07.01 Remedial Action (RA) Correspondence - Basewide
1 34 34.pdf 07.01.00.0001 8/22/1997 1 Transmittal Letter: Final Remedial Decision Document for Remedial Action at TRe Navy Fuel Farm, CTO 0074 Carl Reitenbach/EA Jim Colter/NORTRDIV
1 54 54.pdf 07.01.00.0002 2/25/1998 29 Report:Draft Sampling and Analysis Report for Remedial Action at TRe Navy Fuel Farm for review, CTO 0074 Carl Reitenbach/EA Jim Colter/NORTRDIV
1 97 97.pdf 07.01.00.0003 10/6/1998 2 Responses to Comments: By TRe Navy on TRe Letter Workplan for Site 1 - Privet Road Foster Wheeler Navy
1 96 96.pdf 07.01.00.0004 12/9/1998 2 Transmittal: Draft Letter Report Workplan for PCB removal action at Site 1 - Privet Road Jim Colter/NORTRDIV Darius Ostrauskas/EPA III
1 95 95.pdf 07.01.00.0005 3/10/1999 1 Transmittal: Action Memorandum for Removal of PCB-contaminated soils for review Jim Colter/NORTRDIV Ed Kashdan/Gannett Fleming
1 40 40.pdf 07.01.00.0006 4/30/1999 1 Transmittal Letter: Draft Final Report on System Performance of TRe Vacuum Enhanced LNAPL and Groundwater Recovery and Treatment System, January 1998 to January 1999, Site 10, Navy Fuel Farm for review, CTO 0074 Carl Reitenbach/EA Jim Briggs/NORTRDIV
1 94 94.pdf 07.01.00.0007 6/3/1999 1 Transmittal: Final Workplan for PCB Removal Action at Site 1 - Privet Road Jim Colter/NORTRDIV Lorie Baker/EPA III
1 4 4.pdf 07.01.00.0008 6/30/1999 1 Telephone Conversation Record: between Nancy Kuntzleman (NORTRDIV) and Ed Bonner (COE) RE: Army Corps permitting requirements to dredge TRe stormwater detention pond Nancy Kuntzleman/NORTRDIV N/A
07.04 Remedial Action Work Plans and Progress Reports - Basewide
51   51.pdf PHIL-24330 June 2011 23 p. Proposed Remedial Action Plan for Site 5 Groundwater (OU 2) Russell E. Turner, P.E., Project Manager Base Realignment and Closure Program Management Office, Northeast
63   CD63.pdf PHIL-24991 May 2013 18 p. Remedial Design for Installation of Additional Injection Wells at the Source Area Bioremediation for Site 5 Groundwater (OU 2) Andrew Frebowitz, Project Manager Naval Facilities Engineering Command Mid-Atlantic
1 50 50.pdf 07.04.00.0001 4/18/1997 1 Transmittal Letter: Draft Sampling and Analysis Plan for Remedial Action at TRe Navy Fuel Farm for review, CTO 0074 Carl Reitenbach/EA Jim Colter/NORTRDIV
2 216 216.pdf 07.04.00.0002 4/20/1997 148 Report: Sampling and Analysis Plan for Remedial Action at TRe Navy Fuel Farm, CTO 0074 EA Engineering Navy
1 213 213.pdf 07.04.00.0003 4/29/1997 156 Report: Remedial Action Engineering Workplan for Installation of Remedial Action System, CTO 0074 EA Engineering Navy
2 217 217.pdf 07.04.00.0004 6/11/1998 465 Report: Sampling and Analysis Report for Remedial Action at TRe Navy Fuel Farm, CTO 0074 EA Engineering Navy
1 46 46.pdf 07.04.00.0005 8/20/1998 15 Report: Final Summary Report of Tower 108 Soil Removal and Disposal, CTO 0074 Carl Reitenbach/EA Paul Briegel/NORTRDIV
1 92 92.pdf 07.04.00.0006 5/1/1999 23 Report: Action Memorandum; Removal of Soils Contaminated wiTR polychlorinated Biphenyls (PCBs), Site 1 - Privet Road Compound Navy NASJRB Willow Grove
3 314 314.pdf 07.04.00.0007 9/1/2000 90 Report: Remedial Action Completion Report for F14 Crash Site Remediation, CTO 0018 Foster Wheeler Navy
16   21133 Final PRAP OU 4.pdf   June 2007 22 Proposed Remedial Action Plan for Site 5 Soil (OU 4) U.S. Dept. of the Navy and U.S. Environmental Protection Agency  
25   PRAPSite1.pdf   April 2008 22 Proposed Remedial Action Plan for Site 1 Groundwater (OU 3) Tetra Tech NUS Naval Facilities Engineering Command Mid-Atlantic
25   CD25.pdf Contract Task Order 003 April 2008 22 Proposed Remedial Action Plan for Site 1 Groundwater (OU 3) TETRA TECH, INC. Naval Facilities Engineerinf Command Mid-Atlantic
52   CD52.pdf Contract Task Order 412 July 2011 221 Sampling and Analysis Plan for Site 1 Groundwater Monitoring TETRA TECH, INC. Naval Facilities Engineerinf Command Mid-Atlantic
30   CD30.pdf Contract Task Order 411 Sept. 2008 809 Sampling and Analysis Plan for the Bioremediation Pilot Test Site 5 TETRA TECH NUS, INC.
Megan Ritchie
Naval Facilities Engineerinf Command Mid-Atlantic
32   CD32.pdf Contract Task Order 003 Sept. 2008 71 Confirmation Soil Investigation Report Site Screening Area (SSA) 12 TETRA TECH, INC. Naval Facilities Engineerinf Command Mid-Atlantic
39   CD39.pdf Contract Task Order 003 July 2009 40 Interim Groundwater Monitoring Report Round 3 Site 3 - Ninth Street Landfill TETRA TECH, INC. Naval Facilities Engineerinf Command Mid-Atlantic
40   CD40.pdf Contract Task Order 411 August 2009 54 Interim Groundwater Monitoring Report Round 3 Site 3 - Ninth Street Landfill TETRA TECH, INC. Naval Facilities Engineerinf Command Mid-Atlantic
41   CD41.pdf Contract Task Order WE05 July 2009 65 Site Management Plan Fiscal Year 2009 TETRA TECH, INC. Naval Facilities Engineerinf Command Mid-Atlantic
42   CD42.pdf Contract Task Order WE05 Nov. 2009 180 Work Plan for CERFA (Community Environmental Response Facilitation Act) Category 3 Site Investigations TETRA TECH NUS, INC. Russell E. Turner Naval Facilities Engineerinf Command Mid-Atlantic
43   CD43.pdf Contract Task Order WE05 Dec. 2009 312 Sampling and Analysis Plan Phase 1 Remedial Investigation Site 12 - South Landfill TETRA TECH NUS, INC. Russell E. Turner Naval Facilities Engineerinf Command Mid-Atlantic
CD 79   Site 5 FFTA LUC 04242014.pdf   April 24, 2014 6 pages (including one blueprint 36" x 24 1/4") Survey & Description of the Site 5 – Fire Fighting Training Area (FFTA) (OU-2) Land Use Controls (LUC) at former Naval Air Station Joint Reserve Base (NASJRB) Willow Grove, PA Richard F. Kline, Land Surveyor
Howell Kline Surveying, LLC
1250 Wrights Lane, West Chester, PA 19380
Willington Lin, P.E., BRAC Environmental Coordinator
CD 80   Site1DraftTSP.pdf   May 2014 21 pages Draft Task Specific Plan IR Site 1, Privet Road Compound Scoping Survey (Radiological Scoping Survey as recommended in the Historical Radiological Assessment) Tetra Tech, Inc., Pittsburgh, PA Dept. of the Navy, BRAC Program Mgmt. Office Northeast, Philadelphia, PA
CD 81   Bldg4DraftScopingSurveyTSP.pdf   May 2014 17 pages Draft Task Specific Plan Building 4 Footprint Scoping Survey (Radiological Scoping Survey as recommended in the Historical Radiological Assessment) Lawson Bailey, Project Mgr., Tetra Tech, Inc., Pittsburgh, PA Dept. of the Navy BRAC Program Mgmt. Office Northeast, Philadelphia, PA
CD 82   Bldg23DraftTSP.pdf   May 2014 21 pages Draft Task Specific Plan Building 23 Footprint Scoping Survey (Radiological Scoping Survey as recommended in the Historical Radiological Assessment) Tetra Tech, Inc., Pittsburgh, PA Dept. of the Navy, BRAC Program Mgmt. Office Northeast, Philadelphia, PA
CD 83   CD83_TSP_BUILDING_18.pdf   May 2014 21 pages Task Specific Plan Building 18 Footprint Scoping Survey (Radiological Scoping Survey as recommended in the Historical Radiological Assessment) Tetra Tech, Inc., Pittsburgh, PA Dept. of the Navy, BRAC Program Mgmt. Office Northeast, Philadelphia, PA
CD 84   CD84_Bldg_77_Draft_TSP.pdf   May 2014 21 pages Draft Task Specific Plan Building 77 Footprint Scoping Survey (Radiological Scoping Survey as recommended in the Historical Radiological Assessment) Tetra Tech, Inc., Pittsburgh, PA Dept. of the Navy, BRAC Program Mgmt. Office Northeast, Philadelphia, PA
CD#91 PHIL-25656 WillowGrove_Site5_OM&M_Plan_050615.pdf   May 2015 96 pages In-Situ Bioremediation Operation, Maintenance & Monitoring Plan for Site 5 - Fire Training Area
Groundwater (OU 2)
Andrew Frebowitz, Project Mgr.
Tetra Tech
Naval Facilities Engineering Command Mid-Atlantic
9742 Maryland Avenue
Norfolk, VA 23511-3095
CD# 92   CTO_WE35_Bldg21Final_RACR_TO.pdf Contract # N62470-08-D-1007, Task Order @ WE35 April 2013 448 of pages
includes color maps & photographs
Remedial Action Completion Report. Soil Removal at Building 21. Naval Air Station Joint Reserve Base. Willow Grove. Horsham, Pennsylvania Shaw Environmental and Infrastructure, Inc.
500 East Main St., Suite 1630
Norfolk, VA 23510
Naval Facilities Engineering Command Mid-Atlantic
BRAC Program Management Office East
4911 South Broad St.
Philadelphia, PA 19112
CD# 98 PHIL-26385 Site5_SAP_In-SituBioremediation.pdf   July 2016 421 pages In-Situ Bioremediation Operation, Long Term Monitoring Plan (LTM) for Site 5 - Fire Training Area
Groundwater (OU 2)
Andrew Frebowitz, Project Mgr.
Tetra Tech
Brian Helland
Base Realignment and Closure Program Management Office,
Northeast Philadelphia
07.08 Remedial Action Documents - Basewide
CD#97B   Tech Memo Perfluorinated Compounds 3/19/2015-5/31/2015.pdf   June 29, 2016 39 pages Technical Memorandum Perfluorinated Compounds Soil and Groundwater Investigation Shenandoah Woods Housing Complex, Naval Air Warfare Center, Warminster, PA 19 March 2015 through 31 May 2015 Resolution Consultants, 510 Carnegie Center, Princeton, NJ 08540 U.S. Environmental Protection Agency, Region 3
1650 Arch St.
Philadelphia, PA 19103
PA Dept. of Environmental Protection
2 East Main St.
Norristown, PA 19401
CD#97A   Tech Memo Perfluorinated Compounds 6/4/2015-7/1/2015.pdf   June 29, 2016 42 of pages Technical Memorandum Perfluorinated Compounds Groundwater Investigation Shenandoah Woods Housing Complex Naval Air Warfare Center, Warminster, PA 4 June 2015 through 1 July 2015. Resolution Consultants, 510 Carnegie Center, Princeton, NJ 08540 U.S. Environmental Protection Agency, Region 3
1650 Arch St.
Philadelphia, PA 19103
PA Dept. of Environmental Protection
2 East Main St.
Norristown, PA 19401
CD#96   WE28_SAP_QAPP_TierI_FINAL.pdf Contract # N62470-11-D-8013
CTO WE28
April 25, 2016 388 pages Sampling and Analysis Plan
Perfluorinated Compound Investigation Activities
Final Version: 1
Resolution Consultants
1500 Wells Fargo Bldg.
440 Monticello Ave.
Norfolk, VA 23510
Naval Facilities Engineering Command, Mid-Atlantic
CD 95   Evaluation of Potential Sources of Perfluorinated Compounds at the Former Naval Air Station Joint Reserve Base Willow Grove, Pennsylvania. FINAL.
Cover Letter
Response to Comments on the Draft Evaluation of Potential Sources of Perfluorinated Compounds
Contract # N62470-11-D-8013, Contract Task Order WE28 March 2016 529 pages Evaluation of Potential Sources of Perfluorinated Compounds at the Former Naval Air Station Joint Reserve Base, Willow Grove, Pennsylvania. (FINAL report.) Base Realignment and Closure Program Management Office East, 4911 S. Broad St., Philadelphia, PA 19112 Resolution Consultants, 510 Carnegie Center, Princeton, NJ 08540
    TimeCriticalRemovalAction-Willow GrovePFC_092915.pdf Ser BPMOE/16-003 October 5, 2015 12 pages CERCLA Time-Critical Action Memorandum for Naval Air Station Joint Reserve Base (NASJRB) Willow Grove pertaining to mitigation of potential public exposure to perfluorinated compounds in drinking water at & surrounding NAS JRB Willow Grove. Lisa Cunningham, Remedial Project Mgr., U.S. Environmental Protection Agency, Region III, Philadelphia, PA 19103-2029
Colin Wade, Project Officer, PA Dept. of Environmental Protection, Norristown, PA 19401-4915
Willington Lin, BRAC Environmental Coord., U.S. Dept. of the Navy, Base Realignment & Closure, Program Mgmt. Office East, Philadelphia, PA 19112-1303
62   NASWG_FFA.PDF Administrative Docket number: CERC-03-2005-0038FF 5/24/2005 76 pages Federal Facility Agreement under the Comprehensive Environmental Response, Compensation & Liability Act (CERCLA), as amended by the Superfund Amendments & Reauthorization Act of 1986. agreement among the following parties:
U.S. Environmental Protection Agendy, Region III
Penna. Dept. of Environmental Protection
U.S. Dept. of the Navy
 
1 212 212.pdf 07.08.00.0001 8/20/1997 35 Report: Remedial Decision Document for Remedial Action at TRe Navy Fuel Farm, CTO 0074 EA Engineering Navy
1 214 214.pdf 07.08.00.0002 6/14/1999 146 Report: Final Report on System Performance of TRe Vacuum Enhanced LNAPL and Groundwater Recovery and Treatment System - January 1998 to January 1999, Site 10 - Navy Fuel Farm, CTO 0074 EA Engineering Navy
2 215 215.pdf 07.08.00.0003 6/21/2000 470 Report: Final Report on System Performance of TRe Vacuum Enhanced LNAPL and Groundwater Recovery and Treatment System - January 1999 to December 1999, Site 10 - Navy Fuel Farm, CTO 0074 EA Engineering Navy
2 218 218.pdf 07.08.00.0004 6/27/2001 348 Report: System Performance Report Vacuum Enhanced LNAPL and Groundwater Recovery and Treatment System - January 2000 to December 2000, Site 10 - Navy Fuel Farm, CTO 0074 EA Engineering Navy
12 18619ROD 18619ROD.pdf   September 2006 30 Record of Decision Site 1 Soil Operable Unit 1 (OU1) Tetra Tech NUS, Inc.
Russell E. Turner, Project Mgr.
Curtis Frye, BRAC, Program Mgmt. Ofc., Northeast
46   CD46.pdf 23496 February 2010 52 Record of Decision Site 2 - Antenna Field Landfill Operable Unit 5, Soil and Operable Unit 9, Groundwater Tetra Tech NUS, Inc.
Russell E. Turner, Project Mgr.
U.S. Navy & U.S. Environmental Protection Agency
47   CD47.pdf PHIL-22429 August 2010 52 Remedial Design for Land Use Controls Site 1 - Privet Road Compound Groundwater Operable Unit 3 (OU 3) Tetra Tech NUS, Inc.
Russell E. Turner, Project Mgr.
Naval Facilities Engineering Command Mid-Atlantic
    PN02014LR20110908.pdf

This letter report is filed at the back of the looseleaf notebook for Remedial Design for Land Use Controls Site 1 - Privet Road Compound Groundwater Operable Unit 3 (OU 3)(above)

PHIL-24455 Sept. 8, 2011 12 Site 1 Land Use Controls - 2011 Annual Inspection Report Tetra Tech NUS, Inc.
Andrew Frebowitz, Project Mgr.
Jeff Dale, Base Realignment and Closure
Program Mgmt. Ofc., Northeast
none   PHIL23979.pdf PHIL-23979 November 9, 2010 9 2010 Letter Report documenting status of compliance with land use controls - Site 1 Groundwater Tetra Tech NUS, Inc.
Russell E. Turner, Project Mgr.
Jeff Dale, Base Realignment and Closure Program Management Office, Northeast
CD# 67   Willow Grove Site 5 LUC RD 052913 - 25012.pdf
Land Use Control Inspection Report for Site 5 - Former Fire Fighting Training Area (Groundwater)
Contract Task Order: WE05 May 29, 2013
July 23, 2015
19 pages
3 pages
(Final) Land Use Control Remedial Design for Site 5 – Former Fire Training Area
Annual Land Use Control Inspection Report for Site 5 - Former Fire Fighting Training Area (Groundwater) Annual report filed at back of binder
Andrew Frebowitz, Project Manager, Tetra Tech
Brian Helland, Navy Remedial Project Manager & Willington Lin, BRAC Environmental Coordinator
Naval Facilities Engineering Command Mid-Atlantic, Norfold, VA
Lisa Cunningham, US Enfironmental Protection Agency, Region III, Philadelphia &
Colin Wade, PA Dept. of Environmental Protection, Norristown, PA
none   16-276_LUC Inspection Report for Site 5.pdf 5090 Ser BPMOE/16-276 July 7,2016 3 pages Land Use Controls (LUCs) Inspection Checklist Sie 5 - Former Fire Training Area (Groundwater) Former NAS JRB Willow Grove Tetra Tech NUS, Inc. Andrew Frebowitz, Project Mgr. Ms. Lisa Cunningham Remedial Project Manager U.S. Environmental Protection Ageny Region III (3HS11)
08.01 Site Closeout (BRAC) Correspondence - Basewide
1 6 6.pdf 08.01.00.0001 2/23/1994 2 Memorandum: Trip Report - Siting of a BRAC project for TRe Marines near TRe existing Marine Reserve Compound; Sampling of area Jim Colter/NORTRDIV N/A
1 23 23.pdf 08.01.00.0002 8/19/1998 1 Letter: Revised schedule for submittal of TRe Operation and Maintenance Manual Stephen Tyahla/EA Dave Rule/NORTRDIV
1 91 91.pdf 08.01.00.0003 12/5/2000 1 Transmittal: Final Contractor's Close-out Report for PCB Removal Action at Site 1 - Privet Road Compound Jim Colter/NORTRDIV Lisa Bradford/EPA III
08.04 Site Closeout Contractor Work Plans and Progress Reports - Basewide
2 273 273.pdf 08.04.00.0001 11/15/1999 141 Report: Final Contractor's Close-out Report for Removal of PCB-contaminated Soil - Pivet Road Site w/transmittal Foster Wheeler Navy
09.01 State Coordination Correspondence - Basewide
3 326 326.pdf 09.01.00.0001 2/21/1986 1 Transmittal Letter: Initial Assessment Study (IAS) B.R. Carter/NAS Willow Grove Wayne Lynn/PADER
3 329 329.pdf 09.01.00.0002 2/26/1988 1 Transmittal Letter: Draft Plan of Action for TRe Site Inspection Tom Sheckels/NORTRDIV Wayne Lynn/PADER
3 327 327.pdf 09.01.00.0003 4/11/1988 2 Letter: PADER comments on TRe Draft Plan of Action for Site Inspection Marilyn Shup/PADER Tom Sheckels/NORTRDIV
3 333 333.pdf 09.01.00.0004 5/8/1990 1 Transmittal Letter: Interim Report, Site Inspection Studies at TRe Navy Fuel Farm G.W. Wiese/NORTRDIV CynTRia Steel/PADER
3 334 334.pdf 09.01.00.0005 6/22/1990 1 Telephone Record: between Richard Dudjinski (PADER) and Jim Shafer (NORTRDIV) RE: PADER comments of TRe Final Site Inspection Report Jim Shafer/NORTRDIV N/A
1 100 100.pdf 09.01.00.0006 6/20/1991 24 Transmittal letter and Report -Decision Document after Site Inspection for No-FurTRer Action Sites 4, 6, 8, and 9 Tom Sheckels/NORTRDIV Bruce Bitler/PADER
1 8 8.pdf 09.01.00.0007 5/25/1994 1 Telephone Conversation Record: between Jim Colter (NORTRDIV) and Marcy Goldberg (PADER) RE: Air Force Engine Inspection Project and Navy's recommended plan of action regarding potentially contaminated soils Jim Colter/NORTRDIV N/A
1 145 145.pdf 09.01.00.0008 3/6/1996 1 LetterRequest to handle Site 10 - Fuel Farm under PADEPs Waste Management Regulations in lieu of TRe CERCLA Hazardous Substance Response Jim Colter/NORTRDIV David Kennedy/PADEP
1 117 117.pdf 09.01.00.0009 12/20/1996 1 Transmittal: Analytical Results from Residential well sampling Jim Colter/NORTRDIV David Kennedy/PADEP
1 27 27.pdf 09.01.00.0010 5/20/1997 1 Transmittal Letter: Draft Remedial Decision Document for Installation Restoration Site 10 - Navy Fuel Farm for review Jim Colter/NORTRDIV Christy Hughes/PADEP
1 33 33.pdf 09.01.00.0011 7/31/1997 2 Letter: Comments by PADEP on TRe Remedial Decision Document for Installation Restoration Site 10 dated May 21, 1997 Christy Hughes/PADEP Jim Colter/NORTRDIV
1 25 25.pdf 09.01.00.0012 8/22/1997 1 Transmittal Letter: Final Remedial Decision Document for Installation Restoration Site 10 - Navy Fuel Farm Jim Colter/NORTRDIV Christy Hughes/PADEP
1 42 42.pdf 09.01.00.0013 6/23/1999 2 Transmittal Letter: and distribution list for Final Report of System Performance of TRe Vacuum Enhanced LNAPL and Groundwater Recovery and Treatment System, January 1998 to January 1999, Site 10, Navy Fuel Farm Jim Colter/NORTRDIV Pam Reigh/PADEP
1 56 56.pdf 09.01.00.0014 7/14/1999 2 Letter: Request for identification of substantive chemical- and location- specific requirements of CommonwealTR environmental laws TRat are potential applicable or relevant and appropriate requirements (ARARs) for TRe Willow Grove Site, Horsham Township, PA Jim Colter/NORTRDIV Pam Reigh/PADEP
13.01 Community Relations Correspondence - Basewide
2 233 233.pdf 13.01.00.0001 1/24/1989 1 Transmittal Letter: December 15, 1988 TRC Meeting Minutes Tom Sheckels/NORTRDIV TRC
2 235 235.pdf 13.01.00.0002 3/20/1989 1 Transmittal Letter: March 10, 1989 TRC Meeting Minutes Tom Sheckels/NORTRDIV TRC
2 237 237.pdf 13.01.00.0003 6/21/1989 1 Transmittal Letter: May 25, 1989 TRC Meeting Minutes Tom Sheckels/NORTRDIV TRC
2 239 239.pdf 13.01.00.0004 9/1/1989 1 Transmittal Letter: August 10, 1989 TRC Meeting Minutes Tom Sheckels/NORTRDIV TRC
2 241 241.pdf 13.01.00.0005 12/1/1989 1 Transmittal Letter: October 12, 1989 TRC Meeting Minutes Tom Sheckels/NORTRDIV TRC
2 243 243.pdf 13.01.00.0006 3/7/1990 1 Transmittal Letter: January 18, 1990 TRC Meeting Minutes Tom Sheckels/NORTRDIV TRC
2 245 245.pdf 13.01.00.0007 6/19/1990 1 Transmittal Letter: May 18, 1990 TRC Meeting Minutes Tom Sheckels/NORTRDIV TRC
2 246 246.pdf 13.01.00.0008 8/8/1990 1 Letter: Cancellation of August 16, 1990 TRC Meeting Adrienne Townsel/NORTRDIV TRC
2 247 247.pdf 13.01.00.0009 12/6/1990 1 Letter: Reschedule January 10, 1991 TRC Meeting to January 8, 1991 Adrienne Townsel/NORTRDIV TRC
2 255 255.pdf 13.01.00.0010 1/16/1991 1 Transmittal Letter: January 16, 1991 TRC Meeting Minutes Frank Klanchar/NORTRDIV TRC
2 249 249.pdf 13.01.00.0011 3/27/1991 1 Transmittal Letter: January 8, 1991 TRC Meeting Minutes Tom Sheckels/NORTRDIV TRC
Transmittal Letter: and distribution list for TRe
3 335 335.pdf 13.01.00.0012 5/30/1991 2 Extended Site Inspections and Remedial Investigations Tom Sheckels/NORTRDIV TRC
2 251 251.pdf 13.01.00.0013 6/17/1991 1 Transmittal Letter: May 16, 1991 TRC Meeting Minutes Tom Sheckels/NORTRDIV TRC
2 253 253.pdf 13.01.00.0014 8/27/1991 1 Transmittal Letter: July 25, 1991 TRC Meeting Minutes Frank Klanchar/NORTRDIV TRC
Transmittal Letter: and distribution list and schedule
3 336 336.pdf 13.01.00.0015 9/17/1991 3 for Final Plan of Action for TRe Extended Site Inspections and Remedial Investigations Frank Klanchar/NORTRDIV TRC
2 256 256.pdf 13.01.00.0016 11/6/1991 1 Letter: Reschedule November 14, 1991 TRC Meeting to January 16, 1992 Frank Klanchar/NORTRDIV TRC
3 338 338.pdf 13.01.00.0017 1/9/1992 2 Transmittal Letter: Final Interim Report at TRe Navy Fuel Farm, November 1990 - July 1991 Frank Klanchar/NORTRDIV TRC
3 337 337.pdf 13.01.00.0018 1/24/1992 2 Transmittal Letter: and distribution list for Final Draft Extended Site Inspections (ESI) Frank Klanchar/NORTRDIV TRC
2 257 257.pdf 13.01.00.0019 4/16/1992 1 Letter: Reschedule April 13, 1992 TRC Meeting to June 18, 1992 Frank Klanchar/NORTRDIV TRC
2 258 258.pdf 13.01.00.0020 7/9/1992 2 Notice: TRC Meeting notification; July 30, 1992 Frank Klanchar/NORTRDIV TRC
2 260 260.pdf 13.01.00.0021 10/8/1992 1 Transmittal Letter: July 30, 1992 TRC Meeting Minutes Frank Klanchar/NORTRDIV TRC
2 261 261.pdf 13.01.00.0022 11/12/1992 1 Letter: Cancellation of November 19, 1992 TRC Meeting Frank Klanchar/NORTRDIV TRC
2 263 263.pdf 13.01.00.0023 3/16/1993 1 Letter: Reschedule March 30, 1993 TRC Meeting to April 1, 1993 Tom Sheckels/NORTRDIV TRC
2 265 265.pdf 13.01.00.0024 5/4/1993 1 Transmittal Letter: April 1, 1993 TRC Meeting Minutes Tom Sheckels/NORTRDIV TRC
1 88 88.pdf 13.01.00.0025 8/11/1994 2 Trip Report: Site Visit to Willow Grove regarding proposed sale of private property adjacent to NAS Willow Grove. Jim Colter/NORTRDIV Navy
1 165 165.pdf 13.01.00.0026 10/2/1996 2 Notice: RAB Meeting notification; October 2, 1996 N/A N/A
1 164 164.pdf 13.01.00.0027 11/1/1996 1 Transmittal Letter: October 2, 1996 RAB Meeting Minutes Russ Turner/BRE Jim Colter/NORTRDIV
1 167 167.pdf 13.01.00.0028 12/20/1996 3 Transmittal Letter: of Meeting Notice (attached); letter from Jim Edmond (Willow Grove) submitting Glossary of Terms to RAB Members Russ Turner/BRE Jim Colter/NORTRDIV
1 123 123.pdf 13.01.00.0029 1/30/1997 1 Notification of next RAB meeting and tour of air station Paul Greco/Willow Grove RAB
1 170 170.pdf 13.01.00.0030 4/9/1997 1 Notice: RAB Meeting notification; April 9, 1997 N/A N/A
1 172 172.pdf 13.01.00.0031 4/23/1997 1 Transmittal: April 9, 1997 RAB Meeting Minutes Russ Turner/BRE Jim Colter/NORTRDIV
1 28 28.pdf 13.01.00.0032 5/20/1997 2 Transmittal Letter: and distribution list for Draft Remedial Decision Document for Installation Restoration Site 10 - Navy Fuel Farm for review Jim Colter/NORTRDIV RAB
1 47 47.pdf 13.01.00.0033 5/20/1997 2 Transmittal Letter: and distribution list Draft Sampling and Analysis Report for Site 10 at TRe Navy Fuel Farm for review Jim Colter/NORTRDIV RAB
1 135 135.pdf 13.01.00.0034 7/30/1997 2 Tinius Olsen manufacturing facility requests for information on any releases/spills of MTBE at Willow Grove David Fennimore/EarTR Data Jim Colter/NORTRDIV
1 32 32.pdf 13.01.00.0035 8/15/1997 19 Letter: Responses to comments from Alix Rauschman (former RAB Member) and Eric Lindhult (RAB Member) (attached) to TRe Draft Remedial Design Document for TRe Navy Fuel Farm, CTO 0074 Carl Reitenbach/EA Jim Colter/NORTRDIV
1 136 136.pdf 13.01.00.0036 8/15/1997 1 Letter: Response to EarTR Data request dated July 30, 1997 RE: Information on releases/spills of MTBE at Willow Grove Jim Colter/NORTRDIV David Fennimore/EarTR Data
1 26 26.pdf 13.01.00.0037 8/22/1997 2 Transmittal Letter: Final Remedial Decision Document for Installation Restoration Site 10 - Navy Fuel Farm Jim Colter/NORTRDIV RAB
1 48 48.pdf 13.01.00.0038 8/22/1997 2 Transmittal Letter: and distribution list Final Sampling and Analysis Report for Site 10 at TRe Navy Fuel Farm Jim Colter/NORTRDIV RAB
1 133 133.pdf 13.01.00.0039 9/10/1997 2 Transmittal: and distribution list of Final document reporting TRe results of TRe site investigation near TRe Tinius Olsen facility Jim Colter/NORTRDIV RAB
1 174 174.pdf 13.01.00.0040 10/2/1997 1 Transmittal Letter: September 10, 1997 RAB Meeting Minutes Mark Leemaster/NASJRB Willow Grove RAB
1 175 175.pdf 13.01.00.0041 1/14/1998 1 Notice: RAB Meeting notification; January 14, 1998 Russ Turner/Tetra Tech NUS RAB
1 177 177.pdf 13.01.00.0042 2/6/1998 1 Transmittal Letter: January 14, 1998 RAB Meeting Minutes Russ Turner/BRE RAB
1 37 37.pdf 13.01.00.0043 2/25/1998 2 Transmittal Letter : and distribution list for Draft Sampling and Analysis Report for Remedial Action at TRe Navy Fuel Farm for review Jim Colter/NORTRDIV RAB
1 178 178.pdf 13.01.00.0044 3/4/1998 2 Notice: RAB Meeting notification; March 4, 1998 Russ Turner/Tetra Tech NUS RAB
1 58 58.pdf 13.01.00.0045 4/20/1998 3 Transmittal Letter: and distribution lists for TRe Draft Phase II Remedial Investigation (RI) for Sites 1, 2, 3, and 5 for review Jim Colter/NORTRDIV RAB
1 124 124.pdf 13.01.00.0046 5/5/1998 1 Cancellation of May 13, 1998 TRC Meeting and schedule for next RAB meeting Jim Edmond/Willow Grove RAB
1 39 39.pdf 13.01.00.0047 6/11/1998 2 Transmittal Letter: and distribution list for Final Sampling and Analysis Report for Remedial Action at TRe Navy Fuel Farm Jim Colter/NORTRDIV RAB
1 180 180.pdf 13.01.00.0048 9/16/1998 2 Notice: RAB Meeting notification; September 16, 1998 Russ Turner/Tetra Tech NUS RAB
1 182 182.pdf 13.01.00.0049 10/1/1998 1 Transmittal Letter: September 16, 1998 RAB Meeting Minutes Russ Turner/Tetra Tech NUS RAB
3 346 346.pdf 13.01.00.0050 10/11/1998 1 Letter: Comments to Draft Phase II RI Report for NASJRB Willow Grove Eric Linhult. P.E./local resident (RAB member) Jim Colter/NORTRDIV
3 345 345.pdf 13.01.00.0051 10/15/1998 1 Letter: Comment - Phase II RI Report for NASJRB Willow Grove Kaye Maxwell-Martin/General Instrument Corporation (RAB member) Jim Colter/NORTRDIV
1 183 183.pdf 13.01.00.0052 3/17/1999 2 Notice: RAB Meeting notification; April 7, 1999 Jim Colter/NORTRDIV RAB
1 185 185.pdf 13.01.00.0053 4/30/1999 1 Transmittal Letter: April 7, 1999 RAB Meeting Minutes Russ Turner/Tetra Tech NUS RAB
1 186 186.pdf 13.01.00.0054 6/30/1999 2 Notice: RAB Meeting notification; July 14, 1999 Russ Turner/Tetra Tech NUS RAB
1 188 188.pdf 13.01.00.0055 7/29/1999 1 Transmittal: July 14, 1999 RAB Meeting Minutes Russ Turner/Tetra Tech NUS RAB
1 189 189.pdf 13.01.00.0056 10/8/1999 1 Letter: RAB Meeting rescheduled from October 13, 1999 to December 8, 1999 Gilbert Viera/NASJRB Willow Grove, Liz Gemmill/RAB Co-chairperson RAB
1 190 190.pdf 13.01.00.0057 11/17/1999 2 RAB Meeting notification; December 8, 1999 Russ Turner/Tetra Tech NUS N/A
1 192 192.pdf 13.01.00.0058 1/6/2000 2 Transmittal Letter: December 8, 1999 RAB Meeting Minutes Russ Turner/Tetra Tech NUS RAB
1 193 193.pdf 13.01.00.0059 2/23/2000 2 Notice: RAB Meeting notification; March 15, 2000 Russ Turner/Tetra Tech NUS RAB
1 195 195.pdf 13.01.00.0060 4/17/2000 2 Transmittal Letter: March 15, 2000 RAB Meeting Minutes Russ Turner/Tetra Tech NUS RAB
1 196 196.pdf 13.01.00.0061 5/19/2000 2 Notice: RAB Meeting notification; June 7, 2000 Russ Turner/Tetra Tech NUS RAB
1 198 198.pdf 13.01.00.0062 7/7/2000 2 Transmittal Letter: June 7, 2000 RAB Meeting Minutes Russ Turner/Tetra Tech NUS RAB
1 199 199.pdf 13.01.00.0063 8/30/2000 2 Notice: RAB Meeting notification; September 13, 2000 Russ Turner/Tetra Tech NUS RAB
1 201 201.pdf 13.01.00.0064 10/19/2000 2 Transmittal Letter: September 13, 2000 RAB Meeting Minutes Russ Turner/Tetra Tech NUS RAB
1 202 202.pdf 13.01.00.0065 11/20/2000 2 Notice: RAB Meeting notification; December 6, 2000 Russ Turner/Tetra Tech NUS RAB
1 204 204.pdf 13.01.00.0066 1/4/2001 2 Transmittal Letter: December 6, 2000 RAB Meeting Minutes Russ Turner/Tetra Tech NUS RAB
1 205 205.pdf 13.01.00.0067 2/23/2001 2 Notice: RAB Meeting notification; March 7, 2001 Russ Turner/Tetra Tech NUS RAB
1 207 207.pdf 13.01.00.0068 4/30/2001 2 Transmittal Letter: March 7, 2001 RAB Meeting Minutes Russ Turner/Tetra Tech NUS RAB
1 208 208.pdf 13.01.00.0069 5/20/2001 2 Notice: RAB Meeting notification; June 6, 2001 Russ Turner/Tetra Tech NUS RAB
1 210 210.pdf 13.01.00.0070 7/3/2001 2 Transmittal Letter: June 6, 2001 RAB Meeting Minutes Russ Turner/Tetra Tech NUS RAB
1 211 211.pdf 13.01.00.0071 10/30/2001 1 Letter: of cancellation of November 7, 2001 RAB Meeting W.R. Schoen/NASJRB Willow Grove RAB
3 344 344.pdf 13.01.00.0072 undated 3 Letter: Document Review - Phase II RI Report for NASJRB Willow Grove Jack Dunleavy/local resident (RAB member) Jim Colter/NORTRDIV
1 169 169.pdf 13.01.00.0073 unknown 7 BRE responses to comments from Alix Rauschman (RAB) and Eric Lindhult (RAB) on TRe Phase II RI/FS Work Plan Brown & Root Environmental N/A
3 348 348.pdf 13.01.00.0074 3/27/2002 32 Letter: and attachments of RAB meeting stenographers transcript Russ Turner - Tetra Tech NUS Jim Colter/NORTRDIV
3 349 349.pdf 13.01.00.0075 4/2/2002 4 Meeting Minutes: RAB meeting Minutes Russ Turner - Tetra Tech NUS Jim Colter/NORTRDIV
13.03 Community Relations Technical Review Committee (TRC) Meeting Minutes - Basewide
2 232 232.pdf 13.03.00.0001 12/15/1988 6 Meeting Minutes: from December 15, 1988 Technical Review Committee (TRC) Meeting Jim Colter/NORTRDIV Meeting Attendees
2 234 234.pdf 13.03.00.0002 3/13/1989 6 Meeting Minutes: (draft) from March 10, 1989 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
2 236 236.pdf 13.03.00.0003 5/25/1989 4 Meeting Minutes: from May 25, 1989 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
2 238 238.pdf 13.03.00.0004 8/10/1989 4 Meeting Minutes: from August 10, 1989 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
2 240 240.pdf 13.03.00.0005 10/12/1989 57 Meeting Minutes: from October 12, 1989 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
2 242 242.pdf 13.03.00.0006 1/18/1990 5 Meeting Minutes: from January 18, 1990 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
2 244 244.pdf 13.03.00.0007 5/18/1990 6 Meeting Minutes: from May 18, 1990 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
2 248 248.pdf 13.03.00.0008 1/8/1991 3 Meeting Minutes: from January 8, 1991 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
2 254 254.pdf 13.03.00.0009 1/16/1991 9 Meeting Minutes: from January 16, 1991 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
2 250 250.pdf 13.03.00.0010 5/16/1991 13 Meeting Minutes: from May 16, 1991 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
2 252 252.pdf 13.03.00.0011 7/25/1991 10 Meeting Minutes: from July 25, 1991 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
2 259 259.pdf 13.03.00.0012 7/30/1992 7 Meeting Minutes: from July 30, 1992 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
2 264 264.pdf 13.03.00.0013 4/1/1993 7 Meeting Minutes: from April 1, 1993 TRC Meeting Jim Colter/NORTRDIV Meeting Attendees
3 319 319.pdf 13.03.00.0014 9/24/1994 13 Approval of Plan for Final Disposition of Soil Piles at TRe Navy Fuel Farm NORTRDIV TRC
13.04 Community Relations Plan - Basewide
1 163 163.pdf 13.04.00.0001 12/1/1997 80 Report: Community Relations Plan, CTO 277 Brown & Root Environmental Navy
13.05 Community Relations Public Meeting Minutes - Basewide
1 166 166.pdf 13.05.00.0001 10/2/1996 21 Meeting Minutes: from October 2, 1996 RAB Meeting N/A N/A
1 168 168.pdf 13.05.00.0002 1/15/1997 24 Meeting Minutes from January 15, 1997 RAB Meeting N/A N/A
1 171 171.pdf 13.05.00.0003 4/9/1997 11 Meeting Minutes: from April 9, 1997 RAB Meeting N/A N/A
1 173 173.pdf 13.05.00.0004 9/10/1997 29 Meeting Minutes: from September 10, 1997 RAB Meeting N/A N/A
2 219 219.pdf 13.05.00.0005 9/25/1997 50 Transcript of RAB Meeting; September 10, 1997 w/ transmittal Russ Turner/BRE Jim Colter/NORTRDIV
1 176 176.pdf 13.05.00.0006 1/14/1998 38 Meeting Minutes: from TRe January 14, 1998 RAB Meeting N/A N/A
2 220 220.pdf 13.05.00.0007 2/6/1998 91 Transcript of RAB Meeting; January, 14, 1998 w/ transmittal Russ Turner/BRE Jim Colter/NORTRDIV
1 179 179.pdf 13.05.00.0008 3/4/1998 13 Meeting Minutes: from March 4, 1998 RAB Meeting N/A N/A
2 221 221.pdf 13.05.00.0009 4/15/1998 70 Transcript of RAB Meeting; March 4, 1998 w/ transmittal Russ Turner/BRE Jim Colter/NORTRDIV
1 181 181.pdf 13.05.00.0010 9/16/1998 23 Meeting Minutes: from September 16, 1998 RAB Meeting N/A N/A
2 222 222.pdf 13.05.00.0011 12/24/1998 62 Transcript of RAB Meeting; December 9, 1998 w/ transmittal Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 184 184.pdf 13.05.00.0012 4/7/1999 29 Meeting Minutes: from TRe April 7, 1999 RAB Meeting Russ Turner/Tetra Tech NUS RAB
2 223 223.pdf 13.05.00.0013 4/20/1999 89 Transcript of RAB Meeting; April 7, 1999 w/ transmittal Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 187 187.pdf 13.05.00.0014 7/14/1999 5 Meeting Minutes from TRe July 14, 1999 RAB Meeting Russ Turner/Tetra Tech NUS RAB
2 224 224.pdf 13.05.00.0015 7/22/1999 60 Transcript of RAB Meeting; July 14, 1999 w/ transmittal Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 191 191.pdf 13.05.00.0016 12/8/1999 19 Meeting Minutes: from December 8, 1999 RAB Meeting Russ Turner/Tetra Tech NUS RAB
2 225 225.pdf 13.05.00.0017 1/7/2000 84 Transcript of RAB Meeting; December 8, 1999 w/ transmittal Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 194 194.pdf 13.05.00.0018 3/15/2000 6 Meeting Minutes from March 15, 2000 RAB Meeting Russ Turner/Tetra Tech NUS RAB
2 226 226.pdf 13.05.00.0019 4/3/2000 67 Transcript of RAB Meeting; March 15, 2000 w/ transmittal Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 197 197.pdf 13.05.00.0020 6/7/2000 21 Meeting Minutes: from June 7, 2000 RAB Meeting Russ Turner/Tetra Tech NUS RAB
2 227 227.pdf 13.05.00.0021 7/3/2000 113 Transcript of RAB Meeting; June 7, 2000 w/ transmittal Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
2 228 228.pdf 13.05.00.0022 10/6/2000 47 Transcript of RAB Meeting; September 13, 2000 w/ transmittal Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 200 200.pdf 13.05.00.0023 10/17/2000 5 Meeting Minutes: from September 13, 2000 RAB Meeting Russ Turner/Tetra Tech NUS RAB
1 203 203.pdf 13.05.00.0024 12/6/2000 4 Meeting Minutes: from December 6, 2000 RAB Meeting Russ Turner/Tetra Tech NUS RAB
2 229 229.pdf 13.05.00.0025 12/22/2000 31 Transcript of RAB Meeting; December 6, 2000 w/ transmittal Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 206 206.pdf 13.05.00.0026 3/7/2001 34 Meeting Minutes: from March 7, 2001 RAB Meeting Russ Turner/Tetra Tech NUS RAB
2 230 230.pdf 13.05.00.0027 3/26/2001 64 Transcript of RAB Meeting; March 7, 2001 w/ transmittal Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
1 209 209.pdf 13.05.00.0028 6/6/2001 15 Meeting Minutes: from June 6, 2001 RAB Meeting Russ Turner/Tetra Tech NUS N/A
2 231 231.pdf 13.05.00.0029 6/25/2001 55 Transcript of RAB Meeting; June 6, 2001 wiTR transmittal Russ Turner/Tetra Tech NUS Jim Colter/NORTRDIV
13.06 Community Relations Fact Sheets - Basewide
1 120 120.pdf 13.06.00.0001 2/27/1995 3 Draft Restoration Advisory Board (RAB) Fact Sheet (fax) Jack Dunleavy/NORTRDIV Jim Colter/NORTRDIV
1 125 125.pdf 13.06.00.0002 7/23/1996 6 Fact Sheet: Undated (fax) Navy N/A
1 126 126.pdf 13.06.00.0003 8/1/1996 8 Fact Sheet: No. 2, August 1996 Navy N/A
1 127 127.pdf 13.06.00.0004 12/1/1997 5 Fact Sheet: No. 3, December 1997 Navy N/A
1 128 128.pdf 13.06.00.0005 9/1/2000 8 Fact Sheet: No. 4, September 2000 Navy N/A
13.08 Press Releases/Public Notices/News Clippings - Basewide
1 138 138.pdf 13.08.00.0001 8/22/1994 2 News Release: Announcing EPA proposal of NASJRB Willow Grove for National Priorities List (fax) EPA Region III N/A
1 121 121.pdf 13.08.00.0002 7/21/1995 1 Public Notice: Invitation to join RAB (fax) Paul Greco/Willow Grove Jack Dunleavy/NORTRDIV
1 122 122.pdf 13.08.00.0003 9/7/1996 2 Notice of Formation Meeting of TRe Restoration Advisory Board (RAB) (fax) Dan McCaffrey/Horsham Township Chamber of Commerce Jim Colter/NORTRDIV
Public Notice: Action Memorandum for
1 93 93.pdf 13.08.00.0004 10/7/1998 1 recommended removal action at Site 1 - Privet Road Compound Navy N/A
    PHIL-24605_20120117.pdf PHIL-24605
Project # 02014
Dec. 23, 2011 10 pages Final Interim Remedial Action Completion Report (IRACR)
Site 1 - Privet Road Compound
Naval Air Station Joint Reserve Base (NAS JRB) - Willow Grove
Andrew Frebowitz
Project Manager
Tetra Tech NUS, Inc.
Lisa Cunningham (3HS11)
U.S. Environmental Protection Agency
Philadelphia
16.01 Natural Resource Trustees Correspondence - Basewide
1 71 71.pdf 16.01.00.0001 9/25/1998 2 Comments: NOAA comments on TRe Phase II RI Simeon Hahn/NOAA Barbara Okorn/EPA III
17.01 Final Report Documents
9   Final NAS Willow Grove 06-22-06 revised 05-24-2007.pdf   6/13/2006 125 pages Final Environmental Condition of Property Report for the Naval Air Station Joint Reserve Base Willow Grove, Pennsylvania (note: this document contains revised pages at the end, correcting errors in maps originally issued in Appendix C) Dept. of the Navy/BRAC For Public Review
    Distribution of Final CERFA Report Willow Grove   June 7, 2007 2 pages Distribution of Final CERFA Report for Naval Air Station Joint Reserve Base Willow Grove, PA Robert Lewandowski, P.E. BRAC PMO Northeast Lisa Cunningham, Remedial Project Manager, U.S. EPA Region 3, Philadelphia, PA
15   FinalCERFA Report Willow Grove.pdf   April 2007 1,773 pages CERFA Identification of Uncontaminated Property at the Naval Air Station Joint Reserve Base Willow Grove, Pennsylvania Steven P. Giannino, P.E.
TETRA TECH NUS, Inc.
BRAC PMO Northeast
note: The above file containing the full report "Final CERFA Identification of Uncontaminated Property at the Naval Air Station Joint Reserve Base Willow Grove, Pennsylvania" may be too large for downloading or emailing. To remedy this problem, Horsham Township Library has divided the report into seven parts listed below. These sections should be small enough for most Internet service providers to download.
CD15_part1
CD15_part2
CD15_part3
CD15_part4
CD15_part5
CD15_part6
CD15_part7
  FinalCERFA Report Willow Grove - Part 1: Title - Statutory Authority
FinalCERFA Report Willow Grove - Part 2: Appendix A Government File Review Documentation
FinalCERFA Report Willow Grove - Part 3: Appendix B Property Records
FinalCERFA Report Willow Grove - Part 4: Appendix C Aerial Photographs
FinalCERFA Report Willow Grove - Part 5: Appendix D Visual Site Inspection
FinalCERFA Report Willow Grove - Part 6: Appendix E Photographs of Adjacent Property
FinalCERFA Report Willow Grove - Part 7: Appendix F Interviews & Appendix G Sampling Data & Appendix H Regulator Comments
  April 2007 Part1: 36 pages
Part 2: 803 pages
Part 3: 29 pages
Part 4: 45 pages
Part 5: 796 pages
Part 6: 50 pages
Part 7: 9 pages
CERFA Identification of Uncontaminated Property Steven P. Giannino, P.E.
TETRA TECH NUS, Inc.
BRAC PMO Northeast
19   21273Final.pdf   Sept 2007 35 Record of Decision Site 5 Soil Operable Unit 4 (OU 4) Russell E. Turner, Tetra Tech NUS, Inc. Environmental Protection Agency Region 3
CD #60 PHIL-24964
Project # 02014
Final_WG_Site_5_ROD_093012.pdf
Non-Significant Post Record of Decision Change for Site 5 (revised figure 2-5)
Contract # N62470-08-D-1001
Contract Task Order (CTO) No. WE05
Sept. 2012 61 pages Record of Decision
Site 5 Groundwater
Operable Unit 2 (OU2)
for Site 5 - Former Fire Training Area
Andrew Frebowitz, Project Manager
Tetra Tech, Inc.
Brian Helland
Base Realignment and Closure
Program Management Office, Northeast
4911 South Broad St.
Philadelphia, PA 19112-1303
 PHIL-24598PHIL-24598.pdf  Dec. 16, 2011 4 pagesReport of Results
Site 5 - Fire Training Area
Groundwater sampling for perfluorooctanoic acid (PFOA), perfluorooctane sulfate (PFOS), and 1.4-dioxane in selected Site 5 monitoring wells
Andrew Frebowitz, Project Mgr.
TETRA TECH NUS, Inc.
Brian Helland
Base Realignment & Closure
Program Management Office, NE
4911 S. Broad St.
Philadelphia, PA 19112-1303
21   20080109.pdf   10/25/2007 38 Record of Consensus Agreement
No Action Decision
Rifle Range No. 1 Site 6
Russell E. Turner, Tetra Tech NUS, Inc. Environmental Protection Agency Region 3 and Navy BRAC Environmental Coordinator
22   PHIL-21434.pdf   January 2008 79 Focused Feasibility Study for Site 1 - Privet Road Compound Groundwater (OU 3) Russell E. Turner, Tetra Tech NUS, Inc. Naval Facilities Engineering Command Mid-Atlantic
29   CD29.pdf Contract Task Order 003 Sept. 2008 47 Record of Decision Site 1 Groundwater Operable Unit 3 (OU 3) TETRA TECH, INC. Naval Facilities Engineering Command Mid-Atlantic
31   CD31.pdf Contract Task Order 412 Sept. 2008 56 Record of Consensus Agreement No Action Decision for Site 7 - Abandoned Rifle Range No. 2   Naval Facilities Engineerinf Command Mid-Atlantic
38   CD38.pdf Contract Task Order 412 Jan. 2009 45 Record of Consensus Agreement No Action Decision Site 4 - North End Landfill TETRA TECH, INC. Naval Facilities Engineerinf Command Mid-Atlantic
44 PHIL-22992 CD44.pdf Contract Task Order No. 003 June 2009 180 Remedial Investigation Report Addendum for Site 2 - Antenna Field Landfill TETRA TECH NUS, INC. Russell E. Turner Naval Facilities Engineering Command Mid-Atlantic
50 PHIL-24094 CD50.pdf Contract Task Order WE05 January 28, 2011 767 pages Phase I Remedial Investigation Data Report for Site 12 - South Landfill TETRA TECH NUS, INC.
Russell E. Turner, Project Mgr.
Base Realignment and Closure
Program Management Office, Northeast
CD # 69   NAWC-Warminster-Well-Decommissioning-Report_July 2012.pdf   July 2, 2012 30 pages Naval Air Warfare Center Warminster Summary Report for Well Decommissioning Activities, May 2012 Jennifer Good, P.G. H & S Environmental, Inc.Westborough, MA 01581 Jeffrey Dale, Remedial Project Mgr., BRAC Program Mgmt. Office Northeast, Phila., PA
CD # 71   Willow-Grove-5-Yr-Report-Final-092513-25129.pdf PHIL-25381 Project # 02014 Contract # N62470-08-D-1001, Contract Task Order # WE05 September 2013 132 pages Final Five-Year Review for Former NAS JRB Willow Grove. This is the first five-year review for the former NAS JRB Willow Grove Superfund Site to determine whether the remedy for Operable Unit 3 – Site 1 Groundwater remains protective of human health & the environment. Andrew Frebowitz, Project Manager Tetra Tech, Inc., King of Prussia, PA Naval Facilities Engineering Command, BRAC Program Magmt. Office East, Phila., PA
CD# 85 I.D. #PHIL-25817 Willow-Grove-Final-Site-5-RACR-093014.pdf Contract N62470-08-D-1001
Contract Task Order WE05
September 2014 147 pages FINAL Remedial Action Completion Report Site 5 -- Fire Training Area Groundwater (OU 2)
This RACR is a key site closeout document to help streamline site closeout and deletion process under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The purpose of this RACR is to document that the construction of the groundwater bioremediation component of the remedy selected for Site 5 groundwater (OU 2) in the Final Record of Decision (ROD) has been completed and Land Use Controls have been implemented.
Andrew Frebowitz, Project Mgr.
Tetra Tech, Inc.
King of Prussia, PA 19406-2954
Naval Facilities Engineering Command Mid-Atlantic
9742 Maryland Ave., Norfolk, VA 23511-3095
The following 17 files included in two loose-leaf notebooks comprise the Final Task Specific Plans for 14 buildings and 3 land sites:
CD#86 I.D. # AIK-14-0220
FinalTSPBldg4.pdf
FinalTSPBldg18.pdf
FinalTSPBldg20.pdf
FinalTSPBldg22.pdf
FinalTSPBldg23.pdf
FinalTSPBldg29.pdf
FinalTSPBldg77.pdf
FinalTSPBldg80.pdf
FinalTSPBldg118.pdf
FinalTSPBldg140.pdf

FinalTSPBldg175.pdf
FinalTSPBldg180.pdf
FinalTSPBldg601.pdf
FinalTSPBldg680.pdf
FinalTSPSite1.pdf
FinalTSPSite3.pdf
FinalTSPSite12.pdf
Contract # N62470-08-D-001
Task Order: WE42
October 2014 FINAL Task Specific Plans, Volume 1:
FINAL Task Specific Plan Building 4 Footprint Scoping Survey (17 pages)
FINAL Task Specific Plan Building 18 Footprint Scoping Survey (21 p.)
FINAL Task Specific Plan Building 20 Footprint Scoping Survey (35 p.)
FINAL Task Specific Plan Building 22 Footprint Scoping Survey (36 p.)
FINAL Task Specific Plan Building 23 Footprint Scoping Survey (21 p.)
FINAL Task Specific Plan Building 29 Footprint Scoping Survey (36 p.)
FINAL Task Specific Plan Building 77 Footprint Scoping Survey (21 p.)
FINAL Task Specific Plan Building 80 Footprint Scoping Survey (45 p.)
FINAL Task Specific Plan Building 118 Footprint Scoping Survey (35 p.)
FINAL Task Specific Plan Building 140 Footprint Scoping Survey (34 p.)
FINAL Task Specific Plans, Volume 2:
FINAL Task Specific Plan Building 175 Footprint Scoping Survey (36 p.)
FINAL Task Specific Plan Building 180 Footprint Scoping Survey (39 p.)
FINAL Task Specific Plan Building 601 Footprint Scoping Survey (26 p.)
FINAL Task Specific Plan Building 680 Footprint Scoping Survey (40 p.)
FINAL Task Specific Plan IR Site 1, Privet Road Compound Scoping Survey (21 p.)
FINAL Task Specific Plan IR Site 3, Ninth Street Landfill Scoping Survey (23 p.)
FINAL Task Specific Plan IR Site 12, South Landfill Scoping Survey (22 p.)
Tetra Tech, Inc.
661 Anderson Dr., Suite 5
Pittsburgh, PA
Dept. of the Navy
Base Realignment & Closure
Program Mgmt. Office NE
Philadelphia, PA
CD#89 PHIL-26008 FinalStatusBioremediationSite5.pdf   April 2015 18 pages
filed at back of notebook containing Final Remedial Action Completion Report Site 5 - Fire Training Area Groundwater (OU 2), Sept. 2014
Final Status Report for the Bioremediation at Site 5 - Fire Training Area, Former Naval Air Station Joint Reserve Base - Willow Grove Andrew Frebowitz, Project Mgr.
Tetra Tech, Inc.
Brian Helland
Base Realignment and Closure
Program Mgmt. Office, Northeast
4911 South Broad St.
Philadelphia, PA 19112-1303
CD#90 PHIL-25763 WillowGrove_OPS_Eval_Rpt_050715.pdf   May 2015 1,617 pages
Report: 42 pages, Lab Reports: pages 43 - 1,617
Operating Properly and Successfully Evaluation Report
Site 5 Fire Training Area
Groundwater (OU2)
Andrew Frebowitz, Project Mgr.
Tecta Tech
Naval Facilities Engineering Command Mid-Atlantic
9742 Maryland Avenue
Norfolk, VA 23511-3095
Google WWW Horsham Township Library website
Horsham Township Library
435 Babylon Road
Horsham, Pennsylvania 19044-1224
Tel: (215) 443-2609
Fax: (215) 443-2697
  About us | Disclaimer | Site Map
© 2004
Horsham Township Library.
All rights reserved.

  Click here
to contact the library