These documents are in .PDF format.
CD | I.D. NO. | Link to document | EPA AR CATEGORY AND DOCUMENT TRACKING NUMBER | DATE | NO. OF PAGES | DESCRIPTION OF DOCUMENT/ CORRESPONDENCE | AUTHOR AND AUTHOR'S AFFILIATION | RECIPIENT AND RECIPIENT'S AFFILIATION |
NEWEST FILES- 2018 | ||||||||
N/A | Time Critical Removal Action Work Plan Excavation and Disposal of PFAS-Contaminated Soil Former Naval Air Station Joint Reserve Base Willow Grove Horsham, Pennsylvania | 658 pages | ||||||
N/A | Letter from Karen Melvin, Director of Hazardous Site Cleanup Division at EPA Region III to Mr. Lin and Mr. Mattoch | 2 pages | ||||||
N/A | RI Data Report for Agency Review DRAFT 11112016 and Cover Letter | 824 pages | ||||||
N/A | 2015 and 2016 Annual Summary Report Willow Grove Drinking Water Well Assessment | EP-S3-10-05 & EP-S3-15-02 | January 2018 | 69 pages | 2015 & 2016 Annual Summary Report, Willow Grove NAS Site Drinking Water Well Assessment | WESTON SOLUTIONS, INC. Matthew Ewald; Project Task Lead | U.S. Environmental Protection Agency Region III Attn: Mr. Eduardo Rovira On-Scene Coordinator 1650 Arch Street Philadelphia, Pennsylvania 19103 | |
FILES- 2017 | ||||||||
CD 101 | WG Final Site 5 Annual Report 122617 - 26437.zip | Contract No. N62467-04-D-0055; Contract Task Order (CTO) No. 412 | December 2017 | Multiple files (.zip) | Annual Remedial Action Operations and Long-Term Monitoring Report Year 1 for Site 5 - Fire Training Area Groundwater (OU 2) | Tetra Tech 234 Mall Boulevard, Suite 260 King of Prussia, PA 19406 | Naval Facilities Engineering Command Mid-Atlantic 9324 Virginia Avenue Norfolk, VA 23511-3095 | |
CD 100 |   | Compiled 18-002b WG_Final TCRA AM Willow Grove_PFC_MunicipalWells_29Sep2017 | Ser BPMOE/18-002b | October 5, 2017 | 13 pages | Time-Critical Removal Action, Municipal Drinking Water Well Filtration for PFOA and PFOS exceeding Lifetime Health Advisories, Naval Air Station Joint Reserve Base, Willow Grove, PA. NPL Site ID #PAD987277837 | Lisa Cunningham, Remedial Project Mgr., U.S. Environmental Protection Agency, Region III, Philadelphia, PA 19103-2029 Colin Wade, Project Officer, PA Dept. of Environmental Protection, Norristown, PA 19401-4915 | Willington Lin, BRAC Environmental Coordinator, Naval Facilities Engineering Command, BRAC Program Management Office, East |
CD 100 |   | Compiled 18-003b WG_Final TCRA AM Willow Grove_PFC_PrivateWells_27Sep2017 | Ser BPMOE/18-003 | October 5, 2017 | 15 pages | Time-Critical Removal Action, Municipal Connections for Private Drinking Water Wells Exceeding PFOA and PFOS Lifetime Health Advisories, Naval Air Station Joint Reserve Base, Willow Grove, PA. NPL Site ID #PAD987277837 | Lisa Cunningham, Remedial Project Mgr., U.S. Environmental Protection Agency, Region III, Philadelphia, PA 19103-2029 Colin Wade, Project Officer, PA Dept. of Environmental Protection, Norristown, PA 19401-4915 | Willington Lin, BRAC Environmental Coordinator, Naval Facilities Engineering Command, BRAC Program Management Office, East |
N/A | September 2017 RAB Minutes & Slides Final | September 13, 2017 | 27 pages | Restoration Advisory Board (RAB) Meeting Minutes & Slides | ||||
N/A | May 2017 RAB Minutes & Slides Final | May 10, 2017 | 54 pages | Restoration Advisory Board (RAB) Meeting Minutes & Slides | ||||
N/A | 17-040 Final 2014 Annual Summary Report Drinking Water 25 Oct 2016 | EP-S3-15-02 | October 25, 2016 | 23 pages | 2014 Annual Summary Report, Willow Grove NAS Site Drinking Water Well Assessment | WESTON SOLUTIONS, INC. Sandra Richards Project Task Lead | U.S. Environmental Protection Agency Region III Attn: Mr. Eduardo Rovira On-Scene Coordinator 1650 Arch Street Philadelphia, Pennsylvania 19103 | |
N/A | 17-245 Willow Grove Site 5 LUC inspection_25May2017 | May 25, 2017 | 3 pages | 2017 Land Use Control Inspection Report for Site 5 | Colin Wade, Project Officer, PA Dept. of Environmental Protection, Norristown, PA 19401-4915 | Lisa Cunningham, Remedial Project Mgr. U.S. Environmental Protection Agency, Region III, 1650 Arch St., Philadelphia, PA | ||
N/A | WG_20170215_presentation | February 15, 2017 | 15 pages | NAS JRB WILLOW GROVE RESTORATION ADVISORY BOARD (RAB) Presentation | ||||
N/A | Final ANG RAB Brief 15Feb2017.pdf | February 15, 2017 | 16 pages | Restoration Advisory BoardHorsham Air Guard Station Presentation | Dennis Pinigis Senior Program Manager Air National Guard Readiness Center Joint Base Andrews, MD dennis.j.pinigis.civ@mail.mil | |||
N/A | Feb 2017 RAB minutes_final | February 15, 2017 | 9 pages | Restoration Advisory Board (RAB) Meeting Minutes | ||||
Finding of Suitability for Transfer (FOST) | ||||||||
93 |   | ShenandoahWoods_FOST_Sept2015.pdf |   | September 2015 | 5,532 pages | Finding of Suitability to Transfer Naval Air Station Joint Reserve Base - Willow Grove Shenandoah Woods Housing Complex Warminster, Pennsylvania. | Dept. of the Navy Base Realignment & Closure Program Mgmt. Office East Philadelphia, PA. |   |
56 |   | FinalFOSTIvyland.pdf |   | January 26, 2012 | 52 pages | Finding of Suitability to Transfer Naval Air Station Joint Reserve Base - Willow Grove Jacksonville Road Housing Ivyland Borouygh, Warminster, PA. | Dept. of the Navy Base Realignment & Closure Program Mgmt. Office Northeast Philadelphia, PA. |   |
59 |   | Shenandoah_Woods_FOST_July1312.pdf Shenandoah Woods FOST July1312 errata sheet |   | July 2012 | 67 pages | FINDING OF SUITABILITY TO TRANSFER NAVAL AIR STATION JOINT RESERVE BASE WILLOW GROVE SHENANDOAH WOODS HOUSING COMPLEX WARMINSTER, PENNSYLVANIA (Approx. 55.12 acres) | Dept. of the Navy Base Realignment & Closure Program Mgmt. Office Northeast Philadelphia, PA. |   |
57 |   | Shenandoah_Woods_FOST FINAL.pdf |   | March 2012 | 66 pages | FINDING OF SUITABILITY TO TRANSFER NAVAL AIR STATION JOINT RESERVE BASE WILLOW GROVE SHENANDOAH WOODS HOUSING COMPLEX WARMINSTER, PENNSYLVANIA | Dept. of the Navy Base Realignment & Closure Program Mgmt. Office Northeast Philadelphia, PA. |   |
53 |   | DraftFOSTHorsham.pdf |   | August 2011 | 313 pages | Finding of Suitability to Transfer Horsham Memorial U.S. Army Reserve Center (PA046). (7 acres to Hatboro Horsham School District for proposed reuse as vehicle and parts storage, vehicle maintenance, and recreational playfield facilities.) | Jeffrey M. Hrzic, Chief, Environmental Div., Dept. of the Army, 99th Regional Support Command, Fort Dix. |   |
53 |   | ECP2007.pdf |   | April 2007 | 1,198 pages | Environmental Condition of Property Final Report HORSHAM MEMORIAL U.S. ARMY RESERVE CENTER (PA046) | CH2M HILL | U.S. Army Corps of Engineers - Louisville District |
53 |   | ECPUPDATEPA046.pdf |   | June 2011 | 134 pages | Environmental Condition of Property Update Report. Horsham Memorial USAR Center (PA046) | XCEL Engineering, Inc. | U.S. Army Corps of Engineers - Louisville District |
CD# 64 |   | HorshamUSARC_Final_SEAandDRAFTFNSI-SIGNED.pdf HorshamUSARC_FINALSEAandFINALNSI_2013_06_05.pdf |   | March 2013 June 5, 2013 (FINAL Finding NSI) | 399 pages 13 pages (FINAL Finding NSI) | Final Supplemental Environmental Assessment for BRAC 2005 Closure, Disposal, and Reuse of the Horsham Memorial United States Army Reserve Center, Horsham, PA DRAFT FINDING OF NO SIGNIFICANT IMPACT FINAL FINDING OF NO SIGNIFICANT IMPACT (filed behind second tab in the same loose-leaf binder) | U.S. Army Corps of Engineers, Mobile District | U.S. Army Reserve 99th Regional Support Command |
00.01 Restoration Advisory Board Meetings | ||||||||
49 |   | Minutes_1.pdf (this PDF contains bookmarks by the year & date of each meeting) |   | May 24, 2011 | 313 | Compendium of Restoration Advisory Board Meeting Minutes, 2004-2011 | Russell E. Turner, Project Mgr. | Naval Facilities Engineering Command & Restoration Advisory Board |
49 |   | www.bracpmo.navy.mil This website archives minutes of the meetings of the Willow Grove Naval Air Station Joint Reserve Base Restoration Advisory Board. |   |   |   | Restoration Advisory Board Meeting Minutes for the years 2012 and part of 2013 were not received by the Horsham Township Library. RAB minutes are available from the federal website at the URL http://www.bracpmo.navy.mil |   |   |
  | RAB Meeting minutes - 2012 | RAB Meeting # 48 Minutes RAB Meeting # 49 Minutes RAB Meeting # 50 Minutes RAB Meeting # 51 Minutes |   | March 7, 2012 June 6, 2012 Sept. 5, 2012 Dec. 5, 2012 | 42 pages 25 pages 41 pages 36 pages | Restoration Advisory Board Meeting Minutes for 2012 |   |   |
  | RAB Meeting minutes - 2013 | RAB Meeting # 52 Minutes RAB Meeting # 53 Minutes RAB Meeting # 54 Minutes |   | April 24, 2013 Sept. 4, 2013 December 4, 2013 | 27 pages 18 pages 21 pages | Restoration Advisory Board Meeting Minutes for 2013 |   |   |
  | RAB Meeting minutes - 2014 | RAB Meeting # 55 Minutes RAB Meeting # 56 Minutes |   | March 5, 2014 June 4, 2014 | 14 pages 13 pages | Restoration Advisory Board Meeting Minutes for 2014 |   |   |
  | RAB Meeting minutes - 2015 | RAB Meeting # 57 Minutes
RAB Meeting # 58 Minutes RAB Meeting # 59 Minutes |   | June 10, 2015 September 16, 2015 December 9, 2015 | 24 pages 25 pages 15 pages | Restoration Advisory Board Meeting Minutes for 2015 |   |   |
01.01 Pre-Remedial Investigation Correspondence - Basewide | ||||||||
3 | 333 | 333.pdf | 01.01.00.0001 | 2/22/1986 | 1 | Transmittal Letter: Initial Assessment Study (IAS) | B.R. Carter/NAS Willow Grove | Francis Mulhern/EPA III |
2 | 275 | 275.pdf | 01.01.00.0002 | 11/14/1989 | 19 | Letter: EPA review of TRe Initial Assessment Study (Rodgers and Halpren, February 1996; and Plan of Action for Site Inspection (EA Engineering, February 1988) | James Harper/EPA III | NAS Willow Grove |
2 | 276 | 276.pdf | 01.01.00.0003 | 12/20/1989 | 2 | Letter: Request for extension to prepare additional information needed for TRe Hazard Ranking System (HRS) | Tom Sheckels/NORTRDIV | James Harper/EPA III |
2 | 277 | 277.pdf | 01.01.00.0004 | 2/28/1990 | 4 | Letter: responding to EPA's request for additional HRS information; and additional HRS information for review | Tom Sheckels/NORTRDIV | NAS Willow Grove |
2 | 278 | 278.pdf | 01.01.00.0005 | 3/8/1990 | 1 | Letter: NAS Willow Grove comments on TRe additional information for TRe Hazard Ranking System (HRS) | M.J. Zook/NAS Willow Grove | NORTRDIV |
2 | 279 | 279.pdf | 01.01.00.0006 | 10/2/1990 | 1 | Letter: EPA III's potential National Priority List Sites for 1991 and 1992 | David Olson/CNO, Navy | NAVFAC, Navy |
2 | 280 | 280.pdf | 01.01.00.0007 | 5/17/1991 | 9 | Letter: HRS scoring checklist indication deficiencies TRat need to be addressed | Henry Sokolowski/EPA III | Stephen KeiTR/Willow Grove |
2 | 281 | 281.pdf | 01.01.00.0008 | 12/4/1991 | 1 | Letter: PPA to Navy regarding compliance wiTR CERCLA | Tom Voltaggio/EPA III | Nancy Stehle/Navy, Washington |
2 | 282 | 282.pdf | 01.01.00.0009 | 1/2/1992 | 3 | Letter: Navy response to EPA III letter dated December 4, 1991 RE: Insufficient data to complete HRS | P.A. Rakowski/ATLANDIV | Tom Voltaggio/EPA III |
2 | 283 | 283.pdf | 01.01.00.0010 | 1/16/1992 | 2 | Letter: NAS Willow Grove compliance wiTR CERCLA section 120; forwarding additional information | Frank Klanchar/NORTRDIV | Henry Sokolowski/EPA III |
2 | 286 | 286.pdf | 01.01.00.0011 | 2/24/1992 | 3 | Letter: Request identification of compounds | Brad Helland/PRC Environmental | Paul Greco/NAS Willow Grove |
2 | 284 | 284.pdf | 01.01.00.0012 | 2/28/1992 | 2 | Letter: Follow-up of January 15 and 16, 1992 Meeting discussing EPA III requirements to complete TRe HRS | Jacqueline Shafer/Navy, Washington | Edwin Erickson/EPA III |
2 | 285 | 285.pdf | 01.01.00.0013 | 7/7/1992 | 1 | Letter: Request for information on NAS Willow Grove | Brad Helland/PRC Environmental | Frank Klanchar/NORTRDIV |
2 | 288 | 288.pdf | 01.01.00.0014 | 12/7/1992 | 1 | Transmittal Letter: Prescore Report for Sites 1,2,3, and 5 | Don Blackert/Halliburton NUS | Frank Klanchar/NORTRDIV |
1 | 139 | 139.pdf | 01.01.00.0015 | 10/5/1994 | 1 | Letter: Discussion of proposed NPL listing and source of contamination of Air Force Reserve (AFR) | Robert Lewandowski/Navy | Tim Wise/Air Force, CEVR |
1 | 142 | 142.pdf | 01.01.00.0016 | 10/18/1994 | 4 | Letter: Air Force response to proposed NPL listing of Willow Grove Air Reserve Station | Richard Moss/Air Force | Administrator/EPA III |
1 | 143 | 143.pdf | 01.01.00.0017 | 9/29/1995 | 1 | E-mail: Notification of NAS Willow Grove officially being listed on NPL | Jim Colter/NORTRDIV | Robert Lewandowski/Navy |
1 | 113 | 113.pdf | 01.01.00.0018 | 8/29/1996 | 3 | Letter: Discussion of groundwater users in TRe vicinity of ARS and NASJRB Willow Grove | Drew Lausch/EPA III | Hal Dusen/Willow Grove - Air Force, Jim Colter/NORTRDIV |
1 | 14 | 14.pdf | 01.01.00.0019 | 9/12/1997 | 1 | Transmittal Letter: Borehole geophysical logs, summaries of TRe heat-pulse-flowmeter measurements, and digital log data for review | Dennis Risser/USGS | Jim Colter/NORTRDIV |
1 | 16 | 16.pdf | 01.01.00.0020 | 2/16/1998 | 1 | Transmittal Letter: Evaluation of Geophysical Logs, Phase I | Dennis Risser/USGS | Jim Colter/NORTRDIV |
1 | 17 | 17.pdf | 01.01.00.0021 | 10/29/1998 | 1 | Transmittal Letter: Borehole geophysical logs, summaries of TRe heat-pulse-flowmeter measurements, and digital log data for review | Dennis Risser/USGS | Jim Colter/NORTRDIV |
1 | 13 | 13.pdf | 01.01.00.0022 | 3/19/2001 | 1 | Transmittal Letter: Draft copy of TRe USGS Open-File Report "Altitude and Configuration of TRe Regional Potentiometric Surface, Willow Grove Naval Air Station/Joint Reserve Base and Vicinity, Horsham Township, Montgomery County, October 7-8, 1999 for review | Ron Sloto/USGS | Jim Colter/NORTRDIV |
2 | 268 | 268.pdf | 01.01.00.0023 | 5/14/2001 | 4 | Transmittal Letter: Draft USGS Water Resources Investigations Report - Hydrogeological Investigation at Site 5 | Ron Sloto/USGS | Jeff Dale/NORTRDIV, Jim Colter/NORTRDIV, Russ Turner/Tetra Tech NUS, Lisa Bradford/EPA III |
2 | 266 | 266.pdf | 01.01.00.0024 | 7/5/2001 | 1 | Transmittal Letter: Draft USGS Water Resources Investigations Report - Evaluation of Borehole Geophysical Logs and Hydraulic Tests conducted in Supply Wells 1 and 2 for review | Ron Sloto/USGS | Jim Colter/NORTRDIV |
  |   | 5090BPMO.pdf | 5090 BPMO NE/RL Ser 09-077 | January 16, 2009 | 1 page | Letter concerns Site Screening Area (SSA) 12 to be referred to Site 12, South Landfill | Robert F. Lewandowski, P.E., BRAC Environmental Coordinator, Dept. of the Navy | Lisa M. Cunningham, Remedial Project Manager, US EPA Region III Charles Clark, Project Officer, PA Dept. of Environmental Protection, SE Regional Office |
01.02 Preliminary Assessment Documents - Basewide | ||||||||
3 | 340 | 340.pdf | 01.02.00.0001 | 2/1/1986 | 170 | Report: Initial Assessment Study of NAS Willow Grove (NEESA 13-101) | NEESA | Navy |
27 |   | WGARS_ROW20080410.pdf |   | April 2008 | 184 | Draft Right-of-Way Follow-On Investigation Report, Willow Grove ARS, POL Site (ST-01) | Tetra Tech, Inc. | U.S. Air Force Reserve Command HQ AFRC/A70A |
CD # 76 |   | Final_Radiological_Mgmt_Plan.pdf |   | March 2014 | 645 pages | Final Basewide Radiological Management Plan | Tetra Tech, Inc. | Dept. of the Navy, Base Realignment & Closure Program Mgmt. Office Northeast, Philadelphia |
CD # 65 |   | 65_DraftHRA_NASJRBWillowGrove11-30-12.pdf 65_HRA_ReferenceDocuments.pdf 65_WGHistoricalPhotographsandMaps.pdf 65_ResponsesToComments__2013_05_10.pdf |   | Nov. 2012 May 10, 2013 | Historical Radiological Assessment: 232 pages Reference Documents: 7,911 pages Photos & Maps: 38 pages Responses to Comments: 20 pages | Draft Historical Radiological Assessment: History of the Use of General Radioactive Mateials 1942 - 2011 HRA Reference Documents Willow Grove Historical Photographs and Maps Responses to Comments regarding the Draft Historical Radiologic Assessment | Willington Lin, P.E., BRAC Environmental Coordinator | Lisa Cunningham, Remedial Project Manager, U.S. EPA, Region III, Philadelphia and Margaret Pollich, Project Officer, Environmental Cleanup Program, PA Dept. of Environmental Protection |
01.03 Site Investigation Documents - Basewide | ||||||||
3 | 306 | 306.pdf | 01.03.00.0001 | 4/1/1989 | 315 | Report: Final Report Environmental Test Boring Investigation at TRe Air National Guard Facility | EA Engineering | Navy |
01.04 Expanded Site Investigation Documents - Basewide | ||||||||
2 | 267 | 267.pdf | 01.04.00.0001 | 3/6/2002 | 74 | Report: Final Interpretation of Borehole Geophysical Logs Aquifer-Isolation Tests, and Water Quality in Supply Wells 1 and 2 | USGS | Navy |
2 | 269 | 269.pdf | 01.04.00.0002 | 3/6/2002 | 45 | Report: Final Hydrogeological Investigation at Site 5 | USGS | Navy |
  |   | TechMemo_Site5Groundwater_OU2.pdf |   | February 2007 | 145 pages | Technical Memorandum of Risk Assessment Evaluation for Site 5 - Fire Training Area Groundwater (OU 2) | Russell E. Turner, Project Mgr. Tetra Tech NUS King of Prussia, PA | Naval Facilities Engineering Command Mid-Atlantic 9742 Maryland Ave. Norfolk, VA 23511-3095 |
CD # 68 |   | 68_Final-HRA-NASJRB-WillowGrove.pdf 68_ReferenceDocuments.pdf 68_WGHistoricalPhotosandMaps.pdf |   | July 2013 | Historical Radiological Assessment: 244 pages Reference Documents: 7,923 pages (137 documents) Photos & Maps: 38 pages | Final Historical Radiological Assessment: History of the Use of General Radioactive Materials 1942 to 2011 Reference Documents Willow Grove Historical Photographs and Maps 6-1-12 | Willington Lin, P.E., BRAC Environmental Coordinator by direction of BRAC PMO | Lisa Cunningham, Remedial Project Mgr. U.S. Environmental Protection Agency, Region III, 1650 Arch St., Philadelphia, PA Margaret Pollich, Project Officer, Environmental Cleanup Program PA Dept. of Environmental Protection, 2 East Main St., Norristown, PA |
CD # 77 |   | TSP-IR-3-SCOPING-SURVEY.pdf | Contract #: N62470-08-D-1001 | Task order WE42 | April 2014 | 23 pages | Draft Task Specific Plan IR (Installation Restoration) Site 3, Ninth Street Landfill Scoping Survey (as recommended in the Historical Radiological Assessment) | Lawson Bailey, Project Mgr., Tetra Tech, Inc. | Lawson Bailey, Project Mgr., Tetra Tech, Inc. |
CD # 78 |   | Site-12-Draft-Scoping-Survey-TSP.pdf | Contract #: N62470-08-D-1001 | Task order WE42 | April 2014 | 22 pages | Draft Task Specific Plan IR (Installation Restoration) Site 12, South Landfill Scoping Survey (as recommended in the Historical Radiological Assessment) | Lawson Bailey, Project Mgr., Tetra Tech, Inc. | Lawson Bailey, Project Mgr., Tetra Tech, Inc. |
01.05 Hazard Ranking System (HRS) Documents - Basewide | ||||||||
3 | 301 | 301.pdf | 01.05.00.0001 | 12/1/1992 | 59 | Report: Prescore Report for Sites 1, 2, 3, and 5, CTO 0011 | Halliburton NUS | Navy |
03.01 Remedial Investigation (RI) Correspondence - Basewide | ||||||||
3 | 299 | 299.pdf | 03.01.00.0001 | 4/1/1987 | 5 | Transmittal of March 10, 1987 Kick off meeting minutes | EA Engineering | Ken Petrone/NORTRDIV |
3 | 328 | 328.pdf | 03.01.00.0002 | 2/26/1988 | 1 | Transmittal Letter: Draft Plan of Action for TRe Site Inspection | Tom Sheckels/NORTRDIV | Karen Wolper/EPA III |
3 | 331 | 331.pdf | 03.01.00.0003 | 4/7/1988 | 3 | Letter: Agency Review Meeting minutes on TRe Site Inspection Workplan | Ken Petrone/NORTRDIV | File |
3 | 339 | 339.pdf | 03.01.00.0004 | 8/29/1990 | 25 | Transmittal Letter and Report: No furTRer Action Documents for Remedial Investigation. | Bobby Clary/Air Force | NORTRDIV |
3 | 325 | 325.pdf | 03.01.00.0005 | 1/27/1992 | 1 | Transmittal Letter: Tabulated Analytical Data, CTO 0011 | Don Blackert/Halliburton NUS | Frank Klanchar/NORTRDIV |
2 | 262 | 262.pdf | 03.01.00.0006 | 3/3/1993 | 2 | Transmittal Letter: Final Remedial Investigation (RI) Report for Sites 1, 2, 3, and 5 | Tom Sheckels/NORTRDIV | TRC |
1 | 85 | 85.pdf | 03.01.00.0007 | 8/3/1994 | 1 | Letter: Request for information on TRe 9TR Street Landfill and, specifically, TRe CommonwealTR Corporate Center; also requesting to inspect TRe 9TR Street Landfill site | Stephen McNelis/Pennoni Associates | Jim Colter/NORTRDIV |
1 | 86 | 86.pdf | 03.01.00.0008 | 8/8/1994 | 2 | Letter: Response to Pennoni Associates letter dated August 3, 1994 RE: request for information on 9TR Street Landfill, Site 3 | Jim Colter/NORTRDIV | Stephen McNelis/Pennoni Associates |
1 | 87 | 87.pdf | 03.01.00.0009 | 8/8/1994 | 2 | Letter: Informing Matrix Realty of response to Pennoni Associates letter dated August 3, 1994 RE: request for information on 9TR Street Landfill, Site 3 | Jim Colter/NORTRDIV | Richard Johnson/Matrix Realty |
1 | 140 | 140.pdf | 03.01.00.0010 | 10/17/1994 | 2 | Letter: Proposal of a TRree-party Federal Facilities Agreement (FFA) between Navy, CommonwealTR of Pennsylvania, EPA | Henry Sokolowski/EPA III | Eric Milner/Willow Grove - Navy |
1 | 141 | 141.pdf | 03.01.00.0011 | 11/1/1994 | 1 | Letter: Response to Henry Sokolowski's (EPA III) letter dated October 17, 1994 RE: TRree-party Federal Facilities Agreement (FFA) | Jim Colter/NORTRDIV | Lorie Baker/EPA III |
1 | 144 | 144.pdf | 03.01.00.0012 | 3/6/1996 | 1 | Letter: Request to handle Site 10 - Fuel Farm under PADEPs Waste Management Regulations in lieu of TRe CERCLA Hazardous Substance Response | Jim Colter/NORTRDIV | Drew Lausch/EPA III |
1 | 146 | 146.pdf | 03.01.00.0013 | 3/14/1996 | 2 | Letter: Response to Jim Colter's (NORTRDIV) letter dated March 6, 1996 RE: Request to handle Site 10 -Fuel Farm under PADEPs Waste Management Regulations in lieu of TRe CERCLA Hazardous Substance Response | Drew Lausch/EPA III | Jim Colter/NORTRDIV |
1 | 147 | 147.pdf | 03.01.00.0014 | 6/19/1996 | 2 | Letter: Site Visit and Public HealTR Assessment | Drew Lausch/EPA III | Tom Hartman/Pennsylvania Department of HealTR |
1 | 152 | 152.pdf | 03.01.00.0015 | 7/2/1996 | 2 | Letter: Trip Report: ATSDR site visit; June 26 - 27, 1996 | Wendy Bridges | N/A |
1 | 151 | 151.pdf | 03.01.00.0016 | 7/18/1996 | 2 | Letter: ATSDR site ranking based on June 1997 visit | Sandra Isaacs/ATSDR | Commanding Officer/NASJRB Willow Grove |
1 | 148 | 148.pdf | 03.01.00.0017 | 8/27/1996 | 3 | Letter: Installation Visit/Meeting August 27 - 28, 1996 | Drew Lausch/EPA III | Hal Dusen/Willow Grove - Air Force |
1 | 149 | 149.pdf | 03.01.00.0018 | 8/28/1996 | 3 | Letter: Installation Visit/Meeting August 27 - 28, 1996 | Drew Lausch/EPA III | Jim Colter/NORTRDIV |
1 | 101 | 101.pdf | 03.01.00.0019 | 8/29/1996 | 3 | Transmittal: Oversight Assignment/Risk Assessment Support; background information and guidance on No FurTRer Action sites | Drew Lausch/EPA III | Emily Olds/Gannett Fleming |
1 | 102 | 102.pdf | 03.01.00.0020 | 8/29/1996 | 2 | Request for information to facilitate evaluation of No FurTRer Action Sites | Drew Lausch/EPA III | David Kennedy/PADEP |
1 | 103 | 103.pdf | 03.01.00.0021 | 9/10/1996 | 1 | Transmittal: Analytical results from Site 6 -Abandoned Rifle Range | Jim Colter/NORTRDIV | Drew Lausch/EPA III |
1 | 104 | 104.pdf | 03.01.00.0022 | 9/16/1996 | 1 | Transmittal: Analytical results from Site 6 -Abandoned Rifle Range | Drew Lausch/EPA III | Emily Olds/Gannett Fleming |
1 | 114 | 114.pdf | 03.01.00.0023 | 10/31/1996 | 5 | Comments: by EPA on TRe Draft Off-site Well Sampling Plan | Drew Lausch/EPA III | Hal Dusen/Willow Grove - Air Force, Jim Edmond/Willow Grove - Navy |
1 | 115 | 115.pdf | 03.01.00.0024 | 11/5/1996 | 2 | Comments: by ATSDR on TRe Draft Sampling Plan | David Fowler/ATSDR | Jim Edmond/Willow Grove |
1 | 116 | 116.pdf | 03.01.00.0025 | 12/20/1996 | 1 | Transmittal: Analytical Results from Residential well sampling | Jim Colter/NORTRDIV | Steve Hirsh/EPA III |
1 | 118 | 118.pdf | 03.01.00.0026 | 12/23/1996 | 1 | Notification of distribution of Residential Well Sampling Results | Russ Turner/BRE | Jim Colter/NORTRDIV |
1 | 77 | 77.pdf | 03.01.00.0027 | 1/6/1997 | 2 | Letter: Change in EPA III Remedial Project Manager (RPM) for Willow Grove | Drew Lausch/EPA III | Hal Dusen/Willow Grove - Air Force, Jim Edmond/Willow Grove - Navy |
1 | 24 | 24.pdf | 03.01.00.0028 | 3/14/1997 | 3 | Meeting Minutes: from March 11, 1997 discussing TRe scope of Delivery Order 74 (Soil Contamination Delineation at TRe Navy Fuel Farm) | Scott Dobson/EA | Attendees |
1 | 78 | 78.pdf | 03.01.00.0029 | 5/6/1997 | 3 | Meeting minutes for May 5, 1997 Phase II RI meeting | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 80 | 80.pdf | 03.01.00.0030 | 5/27/1997 | 8 | Transmittal ; and report of Proposed Monitoring Well Placement at Site 5, CTO 277 | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 60 | 60.pdf | 03.01.00.0031 | 6/20/1997 | 1 | Transmittal Letter: Distribution of Section 4 Figures for TRe Phase II RI Workplan, CTO 277 | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 61 | 61.pdf | 03.01.00.0032 | 7/16/1997 | 1 | Transmittal Letter: Phase II RI Field Notes and Logs, CTO 277 | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 132 | 132.pdf | 03.01.00.0033 | 9/4/1997 | 1 | Transmittal: Draft Phase II RI Addendum Report (Tinius Olsen Vicinity) for review | Russ Turner/BRE | Jim Colter/NORTRDIV |
1 | 131 | 131.pdf | 03.01.00.0034 | 9/11/1997 | 2 | Tinius Olsen comments on Draft Phase II RI Addendum (Tinius Olsen Vicinity); and requests | David Fennimore/EarTR Data | Jim Colter/NORTRDIV |
1 | 130 | 130.pdf | 03.01.00.0035 | 9/17/1997 | 1 | Transmittal: Final Phase II RI Addendum Report -Tinius Olsen Vicinity, CTO 277 | Russ Turner/BRE | Jim Colter/NORTRDIV |
1 | 108 | 108.pdf | 03.01.00.0036 | 9/19/1997 | 2 | Letter: Request for preliminary RI groundwater data for TRe Privet Road Compound | Julie Widman/Montgomery Watson | Jim Colter/NORTRDIV |
1 | 107 | 107.pdf | 03.01.00.0037 | 10/2/1997 | 1 | Transmittal: Privet Road Compound Area preliminary RI groundwater data. | Russ Turner/BRE | Jim Colter/NORTRDIV |
1 | 106 | 106.pdf | 03.01.00.0038 | 10/22/1997 | 6 | Letter: Water analysis of Strawbridge Property adjacent to Air Force Fuel Farm site | Michael McGee/Horsham Township | Jim Edmond/Willow Grove |
1 | 1 | 1.pdf | 03.01.00.0039 | 3/13/1998 | 2 | Transmittal Letter: Site Management Plan, Willow Grove, CTO 278 | Jim Colter/NORTRDIV | Darius Ostrauskas/EPA III |
1 | 64 | 64.pdf | 03.01.00.0040 | 4/20/1998 | 3 | Transmittal Letter: and distribution list - Draft Phase II RI Report and Summary Document, CTO 277 | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 76 | 76.pdf | 03.01.00.0041 | 5/20/1998 | 1 | Letter: Summary of Survey services to be conducted at Site 1 (Privet Road Compound) and Site 5 (Fire Training Area) | Russ Turner/Tetra Tech NUS | Wayne Himes/GTS Technologies |
1 | 65 | 65.pdf | 03.01.00.0042 | 6/4/1998 | 1 | E-mail: Notification: of submission of Draft Phase II Report to Gannett Fleming | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
Transmittal Letter: Notification of distribution of Draft | ||||||||
1 | 66 | 66.pdf | 03.01.00.0043 | 12/22/1998 | 1 | Phase II RI Report and RAB Member application to Virginia Cunningham, CTO 277 | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 105 | 105.pdf | 03.01.00.0044 | 3/5/1999 | 1 | Letter: Notification of change in EPA III Project Manager | Darius Ostrauskas/EPA III | Jim Colter/NORTRDIV |
1 | 84 | 84.pdf | 03.01.00.0045 | 3/10/1999 | 14 | Letter: wiTR EVS presentation, CTO 277 | Tara Beckman/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 83 | 83.pdf | 03.01.00.0046 | 3/12/1999 | 1 | Transmittal: Hydrogeological Discussion Documents from RI results, Site 5 - Fire Training Area | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
Transmittal Letter: wiTR Comments from TRe EPA | ||||||||
3 | 343 | 343.pdf | 03.01.00.0047 | 4/4/1999 | 17 | Toxicologist for Human HealTR and Ecological Risk Assessments in TRe Draft Phase II RI Report for NASJRB Willow Grove | Lori Baker/EPA | Jim Colter/NORTRDIV |
1 | 68 | 68.pdf | 03.01.00.0048 | 4/9/1999 | 22 | Comments: EPA comments on TRe Phase II RI | Lorie Baker/EPA III | Jim Colter/NORTRDIV |
2 | 270 | 270.pdf | 03.01.00.0049 | 4/23/1999 | 1 | Transmittal: Evaluation of Geophysical Logs, Phase II | Dennis Risser/USGS | Jim Colter/NORTRDIV |
1 | 55 | 55.pdf | 03.01.00.0050 | 7/14/1999 | 2 | Letter: Request for identification of substantive chemical- and location- specific requirements of environmental laws TRat are potential applicable or relevant and appropriate requirements (ARARs) for TRe Willow Grove Site, Horsham Township, PA | Jim Colter/NORTRDIV | Lorie Baker/EPA III |
1 | 69 | 69.pdf | 03.01.00.0051 | 9/24/1999 | 3 | Letter: Response to July 14, 1999 request for substantive location- and chemical-specific requirements of Federal environmental laws TRat are Applicable or Relevant and appropriate requirements (ARARs) for Willow Grove | Lorie Baker/EPA III | Jim Colter/NORTRDIV |
1 | 82 | 82.pdf | 03.01.00.0052 | 10/13/1999 | 11 | Response to comments: Status of Navy action items from April 14, 1999 Technical Meeting | Tetra Tech NUS | Navy |
1 | 98 | 98.pdf | 03.01.00.0053 | 3/1/2000 | 1 | Transmittal: HealTR and Safety Plan - 1997 | Russ Turner/Tetra Tech NUS | Pete Schultes (A.C. Schultes) |
1 | 99 | 92.pdf | 03.01.00.0054 | 3/31/2000 | 2 | Letter: Well Pump replacement project; decision to not extend stilling tube passed TRe pump | Russ Turner/Tetra Tech NUS | Pete Schultes (A.C. Schultes) |
1 | 12 | 12.pdf | 03.01.00.0055 | 5/23/2000 | 8 | Memorandum: Project Review Comments for Military Working Dog Facility wiTR Willow Grove Request for Project Site Approval, Schematic Drawing, Site Plan, and Vicinity Map | Jim Colter/NORTRDIV | George Wiese/NORTRDIV |
1 | 81 | 81.pdf | 03.01.00.0056 | 5/24/2000 | 1 | Transmittal: Draft Workplan for Site 5 | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 129 | 129.pdf | 03.01.00.0057 | 11/1/2000 | 3 | EPA Hazardous Site Clean up summary of PCB contaminated soil removal at Site 1 - Privet Road Compound Area. | EPA Region 3 | Jim Colter/NORTRDIV |
3 | 342 | 342.pdf | 03.01.00.0058 | 1/9/2001 | 68 | Letter: and attachments of Navy's Response to USEPA Region III Comments on Draft Phase II Remedial Investigation (RI) Report Dated April 1998; Naval Air Station Joint Reserve Base (NASJRB) Willow Grove, PA | Jim Colter/ NORTRDIV | Lisa Bradford/EPA Region III |
1 | 79 | 79.pdf | 03.01.00.0059 | 3/1/2001 | 2 | Transmittal of Draft Figure of Proposed Site 5 Soil Sample Locations | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 70 | 70.pdf | 03.01.00.0060 | 4/2/2001 | 6 | Response to comments: Tetra Tech NUS (TtNUS) response to comments, Phase II RI Report | Tetra Tech NUS | Navy |
1 | 89 | 89.pdf | 03.01.00.0061 | 5/16/2001 | 2 | Transmittal Letter: PADEP caseworkers file on Kellett Aircraft located east of Willow Grove Air Station; including February 26, 1998 letter RE: investigation of sources of potential migration of contamination at Kellett Aircraft Site | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 154 | 154.pdf | 03.01.00.0062 | 8/20/2001 | 1 | Letter: Transmittal: Draft Public HealTR Assessment for review | Jeff Kellam/ATSDR | Initial Draft Reviewers |
1 | 155 | 155.pdf | 03.01.00.0063 | 9/10/2001 | 6 | Letter: EFANE and NASJRB comments on TRe Draft Public HealTR Assessment | N/A | N/A |
1 | 150 | 150.pdf | 03.01.00.0064 | 9/17/2001 | 2 | Letter: Site Visit and Public HealTR Assessment | Victoria SmiTR/ATSDR | Commanding Officer/NASJRB Willow Grove |
1 | 90 | 90.pdf | 03.01.00.0065 | unknown | 4 | Report of PCE Contamination of Water Well Nos. 1 and 2 investigation | Lt. Cmdr. David C. Keturakis/NR EEU LANT | Navy |
35 |   | CD35.pdf | Contract Task Order 003 | Nov. 2008 | 213 | Feasibility Study for Site 5 - Fire Training Area Groundwater (OU 2) | TETRA TECH NUS, INC. | Naval Facilities Engineering Command Mid-Atlantic |
03.03 Site Management Plans - Basewide | ||||||||
100 |   | WillowGrove_SMPFY2016.pdf |   | February 2017 | 83 pages | Site Management Plan Fiscal Year 2016 Former Naval Air Station Joint Reserve Base (NAS JRB) Willow Grove, Pennsylvania | Willington Lin. P.E. BRAC Environmental Coordinator | U.S. Environmental Protection Agencybr>Region III (3HS11) Philadelphia, PA |
91 |   | WillowGrove_SMPFY2015.pdf |   | October 1, 2015 | 81 pages | Site Management Plan Fiscal Year 2015 Former Naval Air Station Joint Reserve Base (NAS JRB) Willow Grove, Pennsylvania | Willington Lin. P.E. BRAC Environmental Coordinator | U.S. Environmental Protection Agencybr>Region III (3HS11) Philadelphia, PA |
87 |   | WillowGroveSMP-FY2014.pdf |   | December 2014 | 77 pages | Site Management Plan Fiscal Year 2014 Former Naval Air Station Joint Reserve Base (NAS JRB) Willow Grove, Pennsylvania | Willington Lin. P.E. BRAC Environmental Coordinator | U.S. Environmental Protection Agencybr>Region III (3HS11) Philadelphia, PA |
61 |   | SMP_FY2012_24808.pdf | PHIL-24808 | October 2012 | 73 pages | Site Management Plan Fiscal Year 2012 Naval Air Station Joint Reserve Base (NAS JRB) Willow Grove, Pennsylvania | Tetra Tech Andrew Frebowitz, Project Manager | U.S. Environmental Protection Agencybr>Region III (3HS11) Philadelphia, PA |
55 |   | SMP_FY2011_Willow Grove_123011_24263.pdf | PHIL-24611 Project # 02014 | Dec. 30, 2011 | 71 pages | Final Site Management Plan (SMP) for Fiscal Year 2011 (FY 2011) Naval Air Station Joint Reserve Base (NAS JRB) - Willow Grove | Tetra Tech NUS, Inc. Andrew Frebowitz, Project Manager | Brian Helland Base Realignment and Closure Program Management Office, Northeast Philadelphia |
3 | 293 | 293.pdf | 03.03.00.0001 | 2/1/1988 | 190 | Report: Plan of Action for Site Inspection | EA Engineering | Navy |
1 | 157 | 157.pdf | 03.03.00.0002 | 12/1/1996 | 150 | Report: Rough Draft Site Management Plan, CTO 278 (accepted as final document) | Brown & Root Environmental | Navy |
1 | 3 | 3.pdf | 03.03.00.0003 | 12/26/1996 | 1 | Transmittal Letter: Rough Draft Site Management Plan submitted for Navy review | Russ Turner/BRE | Jim Colter/NORTRDIV |
3 | 12 | 312.pdf | 03.03.00.0004 | 1/1/1998 | 216 | Report: Management Action Plan, Willow Grove Air Reserve Station, DO 5023 | Montgomery Watson | Air Force Reserve |
1 | 2 | 2.pdf | 03.03.00.0005 | 3/8/1999 | 1 | Transmittal Letter: Rough Draft Site Management Plan copy submitted to April Flipse (PADEP), CTO 278 | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
4 |   | 18547 SMP Oct 2005.pdf | PHIL-18547 | October 2005 | 146 | Site Management Plan for Naval Air Station Joint Reserve Base (NAS JRB) Willow Grove Pennsylvania | Russ Turner/Tetra Tech NUS | Engineering Field Activity Northeast |
13 | PHIL-21014 | 18547-Final.pdf |   | April 2007 | 59 | Site Management Plan Fiscal Year 2006 Naval Air Station Joint Reserve Base (NAS JRB) Willow Grove Pennsylvania | Russell E. Turner, Project Mgr./Tetra Tech NUS, Inc. | Naval Facilities Enginerring Command Mid-Atlantic |
18 |   | 21153-SMP.pdf |   | Sept 2007 | 55 | Site Management Plan Fiscal Year 2007 | Russell E. Turner, Project Mgr./Tetra Tech NUS, Inc. | Naval Facilities Enginerring Command Mid-Atlantic |
33 |   | CD33.pdf | PHIL-22203 | Sept. 2008 | 60 | Site Management Plan Fiscal Year 2008 | TETRA TECH NUS, INC. Russell E. Turner | Naval Facilities Engineering Command Mid-Atlantic |
48 | PHIL-23699 | 23699.pdf | PHIL-22203 | October 2010 | 68 | Site Management Plan Fiscal Year 2010 | TETRA TECH NUS, INC. Russell E. Turner | Naval Facilities Engineering Command Mid-Atlantic |
73 | PHIL-25164 | Willow GroveSMP-FY2013.pdf | Contract No. N62470-08-D-1001 Contract Task Order WE05 | November 2013 | 77 pages | Site Management Plan Fiscal Year 2013 | Andrew Frebowitz, Project Mgr., Tetra Tech | Naval Facilities Engineering Command Mid-Atlantic |
03.04 Remedial Investigation Work Plans, Progress Reports - Basewide | ||||||||
3 | 294 | 294.pdf | 03.04.00.0001 | 4/1/1988 | 157 | Report: Quality Assurance/Quality Control Project Plan for Installation Restoration Program Studies | EA Engineering | Navy |
3 | 295 | 295.pdf | 03.04.00.0002 | 4/1/1988 | 44 | Report: Corporate Safety and HealTR Plan for Installation Restoration Program Studies | EA Engineering | Navy |
3 | 291 | 291.pdf | 03.04.00.0003 | 12/1/1988 | 465 | Report: Final Analytical Data Report, Soil Vapor Contaminant Assessment, Vol. 1 | EA Engineering | Navy |
3 | 292 | 292.pdf | 03.04.00.0004 | 12/1/1988 | 292 | Report: Final Analytical Data Report, Soil Vapor Contaminant Assessment, Vol. 2 | EA Engineering | Navy |
3 | 290 | 290.pdf | 03.04.00.0005 | 3/1/1989 | 125 | Report: Interim Report Electromagnetic Survey, Soil Vapor Contaminant Assessment, and Revised Field Sampling Plan for Site Inspection Studies | EA Engineering | Navy |
3 | 320 | 320.pdf | 03.04.00.0006 | 9/1/1989 | 49 | Report: Interim Report Site Inspection Studies | EA Engineering | Navy |
1 | 159 | 159.pdf | 03.04.00.0007 | 5/1/1990 | 240 | Report: Final Site Inspection Studies, Vol. 1, Site Inspection | EA Engineering | Navy |
3 | 289 | 289.pdf | 03.04.00.0008 | 5/1/1990 | 101 | Report: Final Site Inspection Studies, Vol. 2, Appendices | EA Engineering | Navy |
3 | 315 | 315.pdf | 03.04.00.0009 | 11/1/1990 | 299 | Report: Master Plan for NAS Willow Grove | N/A | N/A |
3 | 305 | 305.pdf | 03.04.00.0010 | 8/1/1991 | 133 | Report: Plan of Action for Extended Site Inspections | EA Engineering | Navy |
3 | 311 | 311.pdf | 03.04.00.0011 | 8/1/1991 | 87 | Report: HealTR and Safety Plan, CTO 0011 | Halliburton NUS | Navy |
3 | 316 | 316.pdf | 03.04.00.0012 | 11/1/1991 | 88 | Report: Final Interim Report on Investigations at TRe Navy Fuel Farm - November 1990 - July 1991 | EA Engineering | Navy |
3 | 309 | 309.pdf | 03.04.00.0013 | 11/8/1991 | 58 | Report: Survey Report for Wells, Borings, and Test Pits | Boucher & James | Halliburton NUS |
3 | 303 | 303.pdf | 03.04.00.0014 | 1/1/1992 | 110 | Report: Final Extended Site Inspections | EA Engineering | Navy |
3 | 324 | 324.pdf | 03.04.00.0015 | 1/1/1992 | 216 | Report: Sample Analysis Data for Antenna Field Landfill, Fire Training Area, 9TR Street Landfill, and Privet Road, CTO 0011 | Halliburton NUS | Navy |
3 | 302 | 302.pdf | 03.04.00.0016 | 10/1/1992 | 110 | Report: Final Treatment, Consolidation, Sampling, and Analysis of Investigation Derived Wastes (IDW) | EA Engineering | Navy |
3 | 308 | 308.pdf | 03.04.00.0017 | 12/22/1992 | 73 | Report: Waste Handling Activities, CTO 0011 | Don Blackert/Halliburton NUS | Jim Colter/NORTRDIV |
3 | 317 | 317.pdf | 03.04.00.0018 | 9/1/1993 | 64 | Report: Final Report of Interim Site Investigations Navy Fuel Farm | EA Engineering | Navy |
3 | 322 | 322.pdf | 03.04.00.0019 | 11/1/1993 | 170 | Report: Final Workplan for Pilot-scale Testing of Free-Product Recovery and Aquifer Air Sparging at Navy Fuel Farm, CTO 0009 | EA Engineering | Navy |
3 | 318 | 318.pdf | 03.04.00.0020 | 2/24/1994 | 43 | Report: Evaluation of Remedial Alternatives for Soil Piles, Navy Fuel Farm, CTO 0011 | EA Engineering | Navy |
1 | 156 | 156.pdf | 03.04.00.0021 | 4/1/1996 | 107 | Report: HealTR and Safety Plan for Phase II Remedial Investigation, CTO 227 | Brown & Root Environmental | Navy |
3 | 321 | 321.pdf | 03.04.00.0022 | 11/1/1996 | 316 | Report: Final Pilot Study Report - Product Recovery Pilot System, Navy Fuel Farm, CTO 0009 | EA Engineering | Navy |
2 | 271 | 271.pdf | 03.04.00.0023 | 1997 | 55 | Report: Evaluation of Geophysical Logs, Phase I | USGS | Navy |
1 | 158 | 158.pdf | 03.04.00.0024 | 5/1/1997 | 300 | Report: Phase II Remedial Investigation Work Plan, CTO 227 | Brown & Root Environmental | Navy |
1 | 137 | 137.pdf | 03.04.00.0025 | 7/1/1997 | 5 | Transmittal Letter: of Work Plan Addendum for Site Investigation near Tinius Olsen Property, Phase II RI | Jim Colter/NORTRDIV | David Fennimore/EarTR Data |
2 | 272 | 272.pdf | 03.04.00.0026 | 1999 | 18 | Report: Evaluation of Geophysical Logs, Phase II | USGS | Navy |
2 | 274 | 274.pdf | 03.04.00.0027 | 5/27/1999 | 50 | Report: Workplan for Remediation of TRe Privet Road Site | Foster Wheeler | Navy |
1 | 21 | 21.pdf | 03.04.00.0028 | 8/2/2001 | 15 | Report: Letter Report on Soil Sampling Program Results, former Sludge Drying Beds, Building 16 | Robert Severance/Woodward & Curran | Tim Bramhall/NORTRDIV |
1 | 20 | 20.pdf | 03.04.00.0029 | 10/12/2001 | 18 | Report: Draft Letter Sampling and Analysis Plan and Site Safety, HealTR and Emergency Response Plan (SHERP) Addendum, CTO 0074 | KaTRerine Sheedy/EA, Maria Magilton/EA | Jim Colter/NORTRDIV |
5 | 19419 | 19419 Site 1 PID SOIL WP.pdf | 19419 | September 2005 | 146 | Work Plans for Soil Investigation, Summer 2005 VOC Soil to GW Impact, Site 1 - Privet Road Compound Soil (OU1) | Russ Turner/Tetra Tech NUS | Engineering Field Activity Northeast |
5 | 19418 | 19418 Site 5 PID SOIL WP.pdf | 19418 | September 2005 | 160 | Work Plans for Soil Investigation, Summer 2005 VOC Soil to GW Impact, Site 1 - Privet Road Compound Soil (OU1) | Russ Turner/Tetra Tech NUS | Engineering Field Activity Northeast |
6 | 19444 | 19444 Site 1-GW-WP.pdf | 19444 | December 2005 | 183 | Work Plan for Groundwater Investigation Summer 2005 Continued Groundwater Source Investigation Site 1 - Groundwater (OU 3) | Russ Turner/Tetra Tech NUS | Engineering Field Activity Northeast |
7 | 19459 | 19459 FINAL.pdf | 19459 | December 2005 | 250 | Work Plan for Groundwater Investigation Summer 2005 Continued Groundwater Source Investigation Site 3 - Ninth Street Landfill Soil and Groundwater | Russ Turner/Tetra Tech NUS | Engineering Field Activity Northeast |
8 | PHIL19692 | Phil19692.pdf | 19692 | March 2006 | 46 | Soil Investigation for Volatile Organic Compound Soil to Groundwater Impact Site 5 - Fire Training Area | Russell E. Turner/Tetra Tech NUS | Engineering Field Activity Northeast |
8 | PHIL19695 | Phil19695.pdf | 19695 | March 2006 | 34 | Soil Investigation for Volatile Organic Compound Soil to Groundwater Impact Site 1 - Privet Road Compound | Russell E. Turner/Tetra Tech NUS | Engineering Field Activity Northeast |
10 | PHIL19542 | Phil19542.pdf | 19542 | July 2006 | 144 | Technical Memorandum of Risk Assessment Evaluation for Site 2 - Antenna Field Landfill Soil and Groundwater (OU 5 and OU 9) | Russell E. Turner/Tetra Tech NUS | Naval Facilities Engineering Command Mid-Atlantic |
11 | PHIL19543 | Phil19543.pdf | 19543 | July 2006 | 118 | Technical Memorandum of Risk Assessment Evaluation for Site 5 - Fire Training Area Soil (OU4) | Russell E. Turner/Tetra Tech NUS | Naval Facilities Engineering Command Mid-Atlantic |
14 | PHIL20969 | PHIL20969.pdf | PHIL20969 | April 2007 | 987 | Work Plan for Test Pit Investigation Site 3 - Ninth Street Landfill | Russell E. Turner/Tetra Tech NUS | Naval Facilities Engineering Command Mid-Atlantic |
20 |   | 21073-SSA12.pdf |   | Nov 2007 | 211 | Work Plan for Soil Investigation at Site Screening Area 12 Between Site 2 and Site 5 | Russell E. Turner/Tetra Tech NUS | Naval Facilities Engineering Command Mid-Atlantic |
24 |   |
Final21345.pdf Final21345_appendA.pdf Final21345_appendB.pdf Final21345_appendC.pdf |   | March 2008 | Plan: 75p. Append A: 141p. Append B: 325p. Append C: 3p. (maps) | Sampling and Analysis Plan for Interim Groundwater Monitoring Site 3 - Ninth Street Landfill. | Russell Turner, Project Mgr., Tecta Tech NUS, Inc. | Naval Facilities Engineering Command Mid-Atlantic |
CD34 |   | CD34.pdf CD34_Figures_Tables.pdf CD34_appendix_A_B_C.pdf | Contract Task Order 412 | Nov. 2008 | CD34.pdf: 108p. CD34_Figures: 18p. CD34_appendices: 650p. | Sampling and Analysis Plan for Landfill Delineation Site 3 - Ninth Street Landfill | TETRA TECH NUS, INC. Tom Johnston | Naval Facilities Engineering Command Mid-Atlantic |
CD# 66 |   | WG Site 5 FFTA Bioremediation Status Report 120412 - 25037.PDF | Contract Task Order: WE05 | Dec. 4, 2012 | 11 pages | Bioremediation Status Report Site 5 Former Fire Training Area | Andrew Frebowitz, Project Manager, Tetra Tech | Brian Helland, Base Realignment & Closure Program Mgmt. Office, NE, Philadelphia |
CD# 72 |   | Final Status Report for Site 5 - Fire Training Area Groundwater | Contract No. N62470-08-D-1001 Contract Task Order: WE05 | October 2013 | 19 pages | [Final] Status Report for the Bioremediation of Site 5 (Former Fire Training Area) | Andrew Frebowitz, Project Manager, Tetra Tech | Brian Helland, Base Realignment & Closure Program Mgmt. Office, NE, Philadelphia |
CD # 70 Comments |   | Draft-Willow_Grove_Basewide_Rad_MgtPln.pdf Responses to Comments re Draft | Contract # N62470-08-D-1001, Contract Task Order WE42 | August 2013 February 4, 2014 | 549 pages 9 pages | Draft Basewide Radiological Management Plan, Naval Air Station Joint Reserve Base Willow Grove Responses to Comments regarding the Draft Basewide Radiologic Management Plan | Lawson Bailey, Project Mgr.
Tetra Tech, Inc., Pittsburgh, PA Willington Lin, BRAC Environmental Coordinator | Dept. of the Navy, Base Realignment & Closure Program Mgmt. Office Northeast, Phila., PA |
CD # 75 |   | Willow Grove Phase II RI Site 12 021814 - 24951.pdf | Contract # N62470-08-D-1001, Contract Task Order WE05 | February 2014 | 7,244 pages | Phase II Remedial Investigation Report for Site 12 - South Landfill | Andrew Frebowitz, Project Mgr. Tetra Tech, Inc., King of Prussia, PA | Naval Facilities Engineering Command Mid-Atlantic, Norfolk, VA 23511-3095 |
03.07 Remedial Investigation (RI) Reports Basewide | ||||||||
3 | 307 | 307.pdf | 03.07.00.0001 | 2/1/1993 | 520 | Report: Remedial Investigation Report for Sites 1, 2, 3, and 5, Vol. 2, CTO 0011 | Halliburton NUS | Navy |
3 | 347 | 347.pdf | 03.07.00.0002 | 9/1/1997 | 57 | Report: Addendum Remedial Investigation Report for Site investigation Near TRe Tinius Olsen Property | Brown & Root Environmental | Navy NORTRDIV |
1 | 160 | 160.pdf | 03.07.00.0003 | 4/1/1998 | 600 | Report: Draft Phase II Remedial Investigation, Vol. 1 -Text, CTO 277 | Brown & Root Environmental | Navy |
1 | 161 | 161.pdf | 03.07.00.0004 | 4/1/1998 | 700 | Report: Phase II Remedial Investigation, Vol. 2 -Appendices, CTO 277 | Brown & Root Environmental | Navy |
1 | 162 | 162.pdf | 03.07.00.0005 | 4/1/1998 | 30 | Report: Draft Phase II Remedial Investigation Report, Summary Document, CTO 277 | Brown & Root Environmental | Navy |
3 | 350 | 350.pdf | 03.07.00.0006 | 2/22/2002 | 591 | Report: Remedial Investigation Report for Site 5 -Fire Training Area | Tetra Tech NUS | Navy EFANE |
4 | 19419 | 19419 Site 1 PID SOIL WP.pdf |   | Sept. 2005 | 19419 | Work Plans for Soil Investigation, Summer 2005 VOC Soil to GW Impact, Site 1 - Privet Road Compoind Soil (OU1) | Tetra Tech NUS | Navy EFANE |
4 | 19418 | 19418 Site 5 PID SOIL WP.pdf |   | Sept. 2005 | 19419 | Work Plans for Soil Investigation, Summer 2005 VOC Soil to GW Impact, Site 5 - Fire Training Area Soil (OU4) | Tetra Tech NUS | Navy EFANE |
17 |   | PHIL20936.pdf |   | June 2007 | 334 | Remedial Investigation Report Adendum Six for Site 5 - Fire Training Area Soil (OU 4) | Russell E. Turner, Tetra Tech NUS, Inc. | Naval Facilities Engineering Command Mid-Atlantic |
22 |   | 21228.pdf |   | January 2008 | 71 | Site 1 Privet Road Compound Remedial Investigation Addendum 5 Groundwater (OU 3) | Russell E. Turner, Tetra Tech NUS, Inc. | Naval Facilities Engineering Command Mid-Atlantic |
26 |   | CD26.pdf | Contract Task Order 0060, Modification # 002 | April 2008 | 184 | Draft Right-of-Way Investigation Follow-on Report Petroleum, Oil, and Lubricants Site (ST-01) | TETRA TECH, INC. Andrew F. Johnson | U.S. Air Forse Reserve Command HQ AFRC/A70A |
28 |   | CD28.pdf | Contract Task Order No. 412 | August 2008 | 165 | Interim Groundwater Monitoring Report Round 1 Site 3 - Ninth Street Landfill | TETRA TECH, INC. Russell E. Turner | Base Realignment and Closure Program Management Office |
36 |   | CD36.pdf | Contract Task Order No. 412 | Dec. 2008 | 125 | Interim Groundwater Monitoring Report - Round 2 Site 3 - Ninth Street Landfill | TETRA TECH NUS, INC. | Naval Facilities Engineering Command Mid-Atlantic |
37 |   | CD37.pdf | Contract Task Order No. 412 | January 2009 | 24 | Test Pit Investigation Report Site Screening Area (SSA) 4 | TETRA TECH NUS, INC. | Naval Facilities Engineerinf Command Mid-Atlantic |
54 |   | CD54rev.pdf (revised Oct. 2012) CD54.pdf (superceded) | Contract Task Order No. WE05 | October 2011 | 2 vols. | 1,876 pages | Remedial Investigation Report for Site 3 - Ninth Street Landfill (Revised report contains updated Appendix J) | TETRA TECH NUS, INC. | Naval Facilities Engineerinf Command Mid-Atlantic |
  |   | NASJRB20120417.pdf | Project No. 02014 | April 11, 2012 | 44 pages | Final Groundwater Monitoring Report, Site 1 - Privet Road Compound | TETRA TECH NUS, INC. | Base Realignment and Closure Program Management office, Northeast |
filed in report folder with the above document: Final Groundwater Monitoring Report...April 11, 2012 |   | NASJRB20120918.pdf |   | September 18, 2012 | 15 pages | Institutional Control Inspection Report for Site 1 - Privet Road Compound Groundwater (OU-3) | Willington Lin, P.E. BRAC Environmental Coord. | Ms. Lisa Cunningham Remedial Project Mgr. US EPA, Region III Philadelphia |
filed in report folder with the above document: Final Groundwater Monitoring Report...April 11, 2012 |   | AGS-ICIC_LUCsite1__20130927.pdf |   | November 21, 2013 | 52 pages | Institutional Control Inspection Report for Site 1 - Privet Road Compound Groundwater (OU-3) (inspection performed September 27, 2013) | Gregory K. Willis Restoration Branch, National Guard Bureau, Joint Base Andrews, MD 20762-5157 | Ms. Lisa Cunningham Remedial Project Mgr. US EPA, Region III Philadelphia Ms. Margaret Pollich Project Officer PA Dept. of Environmental Protection Norristown, PA |
CD 58 | PHIL-24624 | CD58.pdf | Contract No. N62470-08-D-1001 Contract Task Order WE05 | April 2012 | 191 pages | 11.4 MB | Building 21 Lead Investigation Report | Andrew Frebowitz, Project Mgr. TETRA TECH | Naval Facilities Engineering Command Mid-Atlantic |
03.08 Remedial Investigation ATSDR HealTR Assessments - Basewide | ||||||||
1 | 153 | 153.pdf | 03.08.00.0001 | 10/15/1996 | 29 | Report: Transmittal of ATSDR Site Summary for June 1997 Site visit | Sandra Isaacs/ATSDR | Commanding Officer/NASJRB Willow Grove |
07.01 Remedial Action (RA) Correspondence - Basewide | ||||||||
1 | 34 | 34.pdf | 07.01.00.0001 | 8/22/1997 | 1 | Transmittal Letter: Final Remedial Decision Document for Remedial Action at TRe Navy Fuel Farm, CTO 0074 | Carl Reitenbach/EA | Jim Colter/NORTRDIV |
1 | 54 | 54.pdf | 07.01.00.0002 | 2/25/1998 | 29 | Report:Draft Sampling and Analysis Report for Remedial Action at TRe Navy Fuel Farm for review, CTO 0074 | Carl Reitenbach/EA | Jim Colter/NORTRDIV |
1 | 97 | 97.pdf | 07.01.00.0003 | 10/6/1998 | 2 | Responses to Comments: By TRe Navy on TRe Letter Workplan for Site 1 - Privet Road | Foster Wheeler | Navy |
1 | 96 | 96.pdf | 07.01.00.0004 | 12/9/1998 | 2 | Transmittal: Draft Letter Report Workplan for PCB removal action at Site 1 - Privet Road | Jim Colter/NORTRDIV | Darius Ostrauskas/EPA III |
1 | 95 | 95.pdf | 07.01.00.0005 | 3/10/1999 | 1 | Transmittal: Action Memorandum for Removal of PCB-contaminated soils for review | Jim Colter/NORTRDIV | Ed Kashdan/Gannett Fleming |
1 | 40 | 40.pdf | 07.01.00.0006 | 4/30/1999 | 1 | Transmittal Letter: Draft Final Report on System Performance of TRe Vacuum Enhanced LNAPL and Groundwater Recovery and Treatment System, January 1998 to January 1999, Site 10, Navy Fuel Farm for review, CTO 0074 | Carl Reitenbach/EA | Jim Briggs/NORTRDIV |
1 | 94 | 94.pdf | 07.01.00.0007 | 6/3/1999 | 1 | Transmittal: Final Workplan for PCB Removal Action at Site 1 - Privet Road | Jim Colter/NORTRDIV | Lorie Baker/EPA III |
1 | 4 | 4.pdf | 07.01.00.0008 | 6/30/1999 | 1 | Telephone Conversation Record: between Nancy Kuntzleman (NORTRDIV) and Ed Bonner (COE) RE: Army Corps permitting requirements to dredge TRe stormwater detention pond | Nancy Kuntzleman/NORTRDIV | N/A |
07.04 Remedial Action Work Plans and Progress Reports - Basewide | ||||||||
51 |   | 51.pdf | PHIL-24330 | June 2011 | 23 p. | Proposed Remedial Action Plan for Site 5 Groundwater (OU 2) | Russell E. Turner, P.E., Project Manager | Base Realignment and Closure Program Management Office, Northeast |
63 |   | CD63.pdf | PHIL-24991 | May 2013 | 18 p. | Remedial Design for Installation of Additional Injection Wells at the Source Area Bioremediation for Site 5 Groundwater (OU 2) | Andrew Frebowitz, Project Manager | Naval Facilities Engineering Command Mid-Atlantic |
1 | 50 | 50.pdf | 07.04.00.0001 | 4/18/1997 | 1 | Transmittal Letter: Draft Sampling and Analysis Plan for Remedial Action at TRe Navy Fuel Farm for review, CTO 0074 | Carl Reitenbach/EA | Jim Colter/NORTRDIV |
2 | 216 | 216.pdf | 07.04.00.0002 | 4/20/1997 | 148 | Report: Sampling and Analysis Plan for Remedial Action at TRe Navy Fuel Farm, CTO 0074 | EA Engineering | Navy |
1 | 213 | 213.pdf | 07.04.00.0003 | 4/29/1997 | 156 | Report: Remedial Action Engineering Workplan for Installation of Remedial Action System, CTO 0074 | EA Engineering | Navy |
2 | 217 | 217.pdf | 07.04.00.0004 | 6/11/1998 | 465 | Report: Sampling and Analysis Report for Remedial Action at TRe Navy Fuel Farm, CTO 0074 | EA Engineering | Navy |
1 | 46 | 46.pdf | 07.04.00.0005 | 8/20/1998 | 15 | Report: Final Summary Report of Tower 108 Soil Removal and Disposal, CTO 0074 | Carl Reitenbach/EA | Paul Briegel/NORTRDIV |
1 | 92 | 92.pdf | 07.04.00.0006 | 5/1/1999 | 23 | Report: Action Memorandum; Removal of Soils Contaminated wiTR polychlorinated Biphenyls (PCBs), Site 1 - Privet Road Compound | Navy | NASJRB Willow Grove |
3 | 314 | 314.pdf | 07.04.00.0007 | 9/1/2000 | 90 | Report: Remedial Action Completion Report for F14 Crash Site Remediation, CTO 0018 | Foster Wheeler | Navy |
16 |   | 21133 Final PRAP OU 4.pdf |   | June 2007 | 22 | Proposed Remedial Action Plan for Site 5 Soil (OU 4) | U.S. Dept. of the Navy and U.S. Environmental Protection Agency |   |
25 |   | PRAPSite1.pdf |   | April 2008 | 22 | Proposed Remedial Action Plan for Site 1 Groundwater (OU 3) | Tetra Tech NUS | Naval Facilities Engineering Command Mid-Atlantic |
25 |   | CD25.pdf | Contract Task Order 003 | April 2008 | 22 | Proposed Remedial Action Plan for Site 1 Groundwater (OU 3) | TETRA TECH, INC. | Naval Facilities Engineerinf Command Mid-Atlantic |
52 |   | CD52.pdf | Contract Task Order 412 | July 2011 | 221 | Sampling and Analysis Plan for Site 1 Groundwater Monitoring | TETRA TECH, INC. | Naval Facilities Engineerinf Command Mid-Atlantic |
30 |   | CD30.pdf | Contract Task Order 411 | Sept. 2008 | 809 | Sampling and Analysis Plan for the Bioremediation Pilot Test Site 5 | TETRA TECH NUS, INC. Megan Ritchie | Naval Facilities Engineerinf Command Mid-Atlantic |
32 |   | CD32.pdf | Contract Task Order 003 | Sept. 2008 | 71 | Confirmation Soil Investigation Report Site Screening Area (SSA) 12 | TETRA TECH, INC. | Naval Facilities Engineerinf Command Mid-Atlantic |
39 |   | CD39.pdf | Contract Task Order 003 | July 2009 | 40 | Interim Groundwater Monitoring Report Round 3 Site 3 - Ninth Street Landfill | TETRA TECH, INC. | Naval Facilities Engineerinf Command Mid-Atlantic |
40 |   | CD40.pdf | Contract Task Order 411 | August 2009 | 54 | Interim Groundwater Monitoring Report Round 3 Site 3 - Ninth Street Landfill | TETRA TECH, INC. | Naval Facilities Engineerinf Command Mid-Atlantic |
41 |   | CD41.pdf | Contract Task Order WE05 | July 2009 | 65 | Site Management Plan Fiscal Year 2009 | TETRA TECH, INC. | Naval Facilities Engineerinf Command Mid-Atlantic |
42 |   | CD42.pdf | Contract Task Order WE05 | Nov. 2009 | 180 | Work Plan for CERFA (Community Environmental Response Facilitation Act) Category 3 Site Investigations | TETRA TECH NUS, INC. Russell E. Turner | Naval Facilities Engineerinf Command Mid-Atlantic |
43 |   | CD43.pdf | Contract Task Order WE05 | Dec. 2009 | 312 | Sampling and Analysis Plan Phase 1 Remedial Investigation Site 12 - South Landfill | TETRA TECH NUS, INC. Russell E. Turner | Naval Facilities Engineerinf Command Mid-Atlantic |
CD 79 |   | Site 5 FFTA LUC 04242014.pdf |   | April 24, 2014 | 6 pages (including one blueprint 36" x 24 1/4") | Survey & Description of the Site 5 Fire Fighting Training Area (FFTA) (OU-2) Land Use Controls (LUC) at former Naval Air Station Joint Reserve Base (NASJRB) Willow Grove, PA | Richard F. Kline, Land Surveyor Howell Kline Surveying, LLC 1250 Wrights Lane, West Chester, PA 19380 | Willington Lin, P.E., BRAC Environmental Coordinator |
CD 80 |   | Site1DraftTSP.pdf |   | May 2014 | 21 pages | Draft Task Specific Plan IR Site 1, Privet Road Compound Scoping Survey (Radiological Scoping Survey as recommended in the Historical Radiological Assessment) | Tetra Tech, Inc., Pittsburgh, PA | Dept. of the Navy, BRAC Program Mgmt. Office Northeast, Philadelphia, PA |
CD 81 |   | Bldg4DraftScopingSurveyTSP.pdf |   | May 2014 | 17 pages | Draft Task Specific Plan Building 4 Footprint Scoping Survey (Radiological Scoping Survey as recommended in the Historical Radiological Assessment) | Lawson Bailey, Project Mgr., Tetra Tech, Inc., Pittsburgh, PA | Dept. of the Navy BRAC Program Mgmt. Office Northeast, Philadelphia, PA |
CD 82 |   | Bldg23DraftTSP.pdf |   | May 2014 | 21 pages | Draft Task Specific Plan Building 23 Footprint Scoping Survey (Radiological Scoping Survey as recommended in the Historical Radiological Assessment) | Tetra Tech, Inc., Pittsburgh, PA | Dept. of the Navy, BRAC Program Mgmt. Office Northeast, Philadelphia, PA |
CD 83 |   | CD83_TSP_BUILDING_18.pdf |   | May 2014 | 21 pages | Task Specific Plan Building 18 Footprint Scoping Survey (Radiological Scoping Survey as recommended in the Historical Radiological Assessment) | Tetra Tech, Inc., Pittsburgh, PA | Dept. of the Navy, BRAC Program Mgmt. Office Northeast, Philadelphia, PA |
CD 84 |   | CD84_Bldg_77_Draft_TSP.pdf |   | May 2014 | 21 pages | Draft Task Specific Plan Building 77 Footprint Scoping Survey (Radiological Scoping Survey as recommended in the Historical Radiological Assessment) | Tetra Tech, Inc., Pittsburgh, PA | Dept. of the Navy, BRAC Program Mgmt. Office Northeast, Philadelphia, PA |
CD#91 | PHIL-25656 | WillowGrove_Site5_OM&M_Plan_050615.pdf |   | May 2015 | 96 pages | In-Situ Bioremediation Operation, Maintenance & Monitoring Plan for Site 5 - Fire Training Area Groundwater (OU 2) | Andrew Frebowitz, Project Mgr. Tetra Tech | Naval Facilities Engineering Command Mid-Atlantic 9742 Maryland Avenue Norfolk, VA 23511-3095 |
CD# 92 |   | CTO_WE35_Bldg21Final_RACR_TO.pdf | Contract # N62470-08-D-1007, Task Order @ WE35 | April 2013 | 448 of pages includes color maps & photographs | Remedial Action Completion Report. Soil Removal at Building 21. Naval Air Station Joint Reserve Base. Willow Grove. Horsham, Pennsylvania | Shaw Environmental and Infrastructure, Inc. 500 East Main St., Suite 1630 Norfolk, VA 23510 | Naval Facilities Engineering Command Mid-Atlantic BRAC Program Management Office East 4911 South Broad St. Philadelphia, PA 19112 |
CD# 98 | PHIL-26385 | Site5_SAP_In-SituBioremediation.pdf |   | July 2016 | 421 pages | In-Situ Bioremediation Operation, Long Term Monitoring Plan (LTM) for Site 5 - Fire Training Area Groundwater (OU 2) | Andrew Frebowitz, Project Mgr. Tetra Tech | Brian Helland Base Realignment and Closure Program Management Office, Northeast Philadelphia |
07.08 Remedial Action Documents - Basewide | ||||||||
CD#97B |   | Tech Memo Perfluorinated Compounds 3/19/2015-5/31/2015.pdf |   | June 29, 2016 | 39 pages | Technical Memorandum Perfluorinated Compounds Soil and Groundwater Investigation Shenandoah Woods Housing Complex, Naval Air Warfare Center, Warminster, PA 19 March 2015 through 31 May 2015 | Resolution Consultants, 510 Carnegie Center, Princeton, NJ 08540 | U.S. Environmental Protection Agency, Region 3 1650 Arch St. Philadelphia, PA 19103 PA Dept. of Environmental Protection 2 East Main St. Norristown, PA 19401 |
CD#97A |   | Tech Memo Perfluorinated Compounds 6/4/2015-7/1/2015.pdf |   | June 29, 2016 | 42 of pages | Technical Memorandum Perfluorinated Compounds Groundwater Investigation Shenandoah Woods Housing Complex Naval Air Warfare Center, Warminster, PA 4 June 2015 through 1 July 2015. | Resolution Consultants, 510 Carnegie Center, Princeton, NJ 08540 | U.S. Environmental Protection Agency, Region 3 1650 Arch St. Philadelphia, PA 19103 PA Dept. of Environmental Protection 2 East Main St. Norristown, PA 19401 |
CD#96 |   | WE28_SAP_QAPP_TierI_FINAL.pdf | Contract # N62470-11-D-8013 CTO WE28 | April 25, 2016 | 388 pages | Sampling and Analysis Plan Perfluorinated Compound Investigation Activities Final Version: 1 | Resolution Consultants 1500 Wells Fargo Bldg. 440 Monticello Ave. Norfolk, VA 23510 | Naval Facilities Engineering Command, Mid-Atlantic |
CD 95 |   | Evaluation of Potential Sources of Perfluorinated Compounds at the Former Naval Air Station Joint Reserve Base Willow Grove, Pennsylvania. FINAL. Cover Letter Response to Comments on the Draft Evaluation of Potential Sources of Perfluorinated Compounds | Contract # N62470-11-D-8013, Contract Task Order WE28 | March 2016 | 529 pages | Evaluation of Potential Sources of Perfluorinated Compounds at the Former Naval Air Station Joint Reserve Base, Willow Grove, Pennsylvania. (FINAL report.) | Base Realignment and Closure Program Management Office East, 4911 S. Broad St., Philadelphia, PA 19112 | Resolution Consultants, 510 Carnegie Center, Princeton, NJ 08540 |
  |   | TimeCriticalRemovalAction-Willow GrovePFC_092915.pdf | Ser BPMOE/16-003 | October 5, 2015 | 12 pages | CERCLA Time-Critical Action Memorandum for Naval Air Station Joint Reserve Base (NASJRB) Willow Grove pertaining to mitigation of potential public exposure to perfluorinated compounds in drinking water at & surrounding NAS JRB Willow Grove. | Lisa Cunningham, Remedial Project Mgr., U.S. Environmental Protection Agency, Region III, Philadelphia, PA 19103-2029 Colin Wade, Project Officer, PA Dept. of Environmental Protection, Norristown, PA 19401-4915 | Willington Lin, BRAC Environmental Coord., U.S. Dept. of the Navy, Base Realignment & Closure, Program Mgmt. Office East, Philadelphia, PA 19112-1303 |
62 |   | NASWG_FFA.PDF | Administrative Docket number: CERC-03-2005-0038FF | 5/24/2005 | 76 pages | Federal Facility Agreement under the Comprehensive Environmental Response, Compensation & Liability Act (CERCLA), as amended by the Superfund Amendments & Reauthorization Act of 1986. | agreement among the following parties: U.S. Environmental Protection Agendy, Region III Penna. Dept. of Environmental Protection U.S. Dept. of the Navy |   |
1 | 212 | 212.pdf | 07.08.00.0001 | 8/20/1997 | 35 | Report: Remedial Decision Document for Remedial Action at TRe Navy Fuel Farm, CTO 0074 | EA Engineering | Navy |
1 | 214 | 214.pdf | 07.08.00.0002 | 6/14/1999 | 146 | Report: Final Report on System Performance of TRe Vacuum Enhanced LNAPL and Groundwater Recovery and Treatment System - January 1998 to January 1999, Site 10 - Navy Fuel Farm, CTO 0074 | EA Engineering | Navy |
2 | 215 | 215.pdf | 07.08.00.0003 | 6/21/2000 | 470 | Report: Final Report on System Performance of TRe Vacuum Enhanced LNAPL and Groundwater Recovery and Treatment System - January 1999 to December 1999, Site 10 - Navy Fuel Farm, CTO 0074 | EA Engineering | Navy |
2 | 218 | 218.pdf | 07.08.00.0004 | 6/27/2001 | 348 | Report: System Performance Report Vacuum Enhanced LNAPL and Groundwater Recovery and Treatment System - January 2000 to December 2000, Site 10 - Navy Fuel Farm, CTO 0074 | EA Engineering | Navy |
12 | 18619ROD | 18619ROD.pdf |   | September 2006 | 30 | Record of Decision Site 1 Soil Operable Unit 1 (OU1) | Tetra Tech NUS, Inc. Russell E. Turner, Project Mgr. | Curtis Frye, BRAC, Program Mgmt. Ofc., Northeast |
46 |   | CD46.pdf | 23496 | February 2010 | 52 | Record of Decision Site 2 - Antenna Field Landfill Operable Unit 5, Soil and Operable Unit 9, Groundwater | Tetra Tech NUS, Inc. Russell E. Turner, Project Mgr. | U.S. Navy & U.S. Environmental Protection Agency |
47 |   | CD47.pdf | PHIL-22429 | August 2010 | 52 | Remedial Design for Land Use Controls Site 1 - Privet Road Compound Groundwater Operable Unit 3 (OU 3) | Tetra Tech NUS, Inc. Russell E. Turner, Project Mgr. | Naval Facilities Engineering Command Mid-Atlantic |
  |   | PN02014LR20110908.pdf This letter report is filed at the back of the looseleaf notebook for Remedial Design for Land Use Controls Site 1 - Privet Road Compound Groundwater Operable Unit 3 (OU 3)(above) | PHIL-24455 | Sept. 8, 2011 | 12 | Site 1 Land Use Controls - 2011 Annual Inspection Report | Tetra Tech NUS, Inc. Andrew Frebowitz, Project Mgr. | Jeff Dale, Base Realignment and Closure Program Mgmt. Ofc., Northeast |
none |   | PHIL23979.pdf | PHIL-23979 | November 9, 2010 | 9 | 2010 Letter Report documenting status of compliance with land use controls - Site 1 Groundwater | Tetra Tech NUS, Inc. Russell E. Turner, Project Mgr. | Jeff Dale, Base Realignment and Closure Program Management Office, Northeast |
CD# 67 |   | Willow Grove Site 5 LUC RD 052913 - 25012.pdf Land Use Control Inspection Report for Site 5 - Former Fire Fighting Training Area (Groundwater) | Contract Task Order: WE05 |
May 29, 2013 July 23, 2015 | 19 pages 3 pages | (Final) Land Use Control Remedial Design for Site 5 Former Fire Training Area Annual Land Use Control Inspection Report for Site 5 - Former Fire Fighting Training Area (Groundwater) Annual report filed at back of binder | Andrew Frebowitz, Project Manager, Tetra Tech Brian Helland, Navy Remedial Project Manager & Willington Lin, BRAC Environmental Coordinator | Naval Facilities Engineering Command Mid-Atlantic, Norfold, VA Lisa Cunningham, US Enfironmental Protection Agency, Region III, Philadelphia & Colin Wade, PA Dept. of Environmental Protection, Norristown, PA |
none |   | 16-276_LUC Inspection Report for Site 5.pdf | 5090 Ser BPMOE/16-276 | July 7,2016 | 3 pages | Land Use Controls (LUCs) Inspection Checklist Sie 5 - Former Fire Training Area (Groundwater) Former NAS JRB Willow Grove | Tetra Tech NUS, Inc. Andrew Frebowitz, Project Mgr. | Ms. Lisa Cunningham Remedial Project Manager U.S. Environmental Protection Ageny Region III (3HS11) |
08.01 Site Closeout (BRAC) Correspondence - Basewide | ||||||||
1 | 6 | 6.pdf | 08.01.00.0001 | 2/23/1994 | 2 | Memorandum: Trip Report - Siting of a BRAC project for TRe Marines near TRe existing Marine Reserve Compound; Sampling of area | Jim Colter/NORTRDIV | N/A |
1 | 23 | 23.pdf | 08.01.00.0002 | 8/19/1998 | 1 | Letter: Revised schedule for submittal of TRe Operation and Maintenance Manual | Stephen Tyahla/EA | Dave Rule/NORTRDIV |
1 | 91 | 91.pdf | 08.01.00.0003 | 12/5/2000 | 1 | Transmittal: Final Contractor's Close-out Report for PCB Removal Action at Site 1 - Privet Road Compound | Jim Colter/NORTRDIV | Lisa Bradford/EPA III |
08.04 Site Closeout Contractor Work Plans and Progress Reports - Basewide | ||||||||
2 | 273 | 273.pdf | 08.04.00.0001 | 11/15/1999 | 141 | Report: Final Contractor's Close-out Report for Removal of PCB-contaminated Soil - Pivet Road Site w/transmittal | Foster Wheeler | Navy |
09.01 State Coordination Correspondence - Basewide | ||||||||
3 | 326 | 326.pdf | 09.01.00.0001 | 2/21/1986 | 1 | Transmittal Letter: Initial Assessment Study (IAS) | B.R. Carter/NAS Willow Grove | Wayne Lynn/PADER |
3 | 329 | 329.pdf | 09.01.00.0002 | 2/26/1988 | 1 | Transmittal Letter: Draft Plan of Action for TRe Site Inspection | Tom Sheckels/NORTRDIV | Wayne Lynn/PADER |
3 | 327 | 327.pdf | 09.01.00.0003 | 4/11/1988 | 2 | Letter: PADER comments on TRe Draft Plan of Action for Site Inspection | Marilyn Shup/PADER | Tom Sheckels/NORTRDIV |
3 | 333 | 333.pdf | 09.01.00.0004 | 5/8/1990 | 1 | Transmittal Letter: Interim Report, Site Inspection Studies at TRe Navy Fuel Farm | G.W. Wiese/NORTRDIV | CynTRia Steel/PADER |
3 | 334 | 334.pdf | 09.01.00.0005 | 6/22/1990 | 1 | Telephone Record: between Richard Dudjinski (PADER) and Jim Shafer (NORTRDIV) RE: PADER comments of TRe Final Site Inspection Report | Jim Shafer/NORTRDIV | N/A |
1 | 100 | 100.pdf | 09.01.00.0006 | 6/20/1991 | 24 | Transmittal letter and Report -Decision Document after Site Inspection for No-FurTRer Action Sites 4, 6, 8, and 9 | Tom Sheckels/NORTRDIV | Bruce Bitler/PADER |
1 | 8 | 8.pdf | 09.01.00.0007 | 5/25/1994 | 1 | Telephone Conversation Record: between Jim Colter (NORTRDIV) and Marcy Goldberg (PADER) RE: Air Force Engine Inspection Project and Navy's recommended plan of action regarding potentially contaminated soils | Jim Colter/NORTRDIV | N/A |
1 | 145 | 145.pdf | 09.01.00.0008 | 3/6/1996 | 1 | LetterRequest to handle Site 10 - Fuel Farm under PADEPs Waste Management Regulations in lieu of TRe CERCLA Hazardous Substance Response | Jim Colter/NORTRDIV | David Kennedy/PADEP |
1 | 117 | 117.pdf | 09.01.00.0009 | 12/20/1996 | 1 | Transmittal: Analytical Results from Residential well sampling | Jim Colter/NORTRDIV | David Kennedy/PADEP |
1 | 27 | 27.pdf | 09.01.00.0010 | 5/20/1997 | 1 | Transmittal Letter: Draft Remedial Decision Document for Installation Restoration Site 10 - Navy Fuel Farm for review | Jim Colter/NORTRDIV | Christy Hughes/PADEP |
1 | 33 | 33.pdf | 09.01.00.0011 | 7/31/1997 | 2 | Letter: Comments by PADEP on TRe Remedial Decision Document for Installation Restoration Site 10 dated May 21, 1997 | Christy Hughes/PADEP | Jim Colter/NORTRDIV |
1 | 25 | 25.pdf | 09.01.00.0012 | 8/22/1997 | 1 | Transmittal Letter: Final Remedial Decision Document for Installation Restoration Site 10 - Navy Fuel Farm | Jim Colter/NORTRDIV | Christy Hughes/PADEP |
1 | 42 | 42.pdf | 09.01.00.0013 | 6/23/1999 | 2 | Transmittal Letter: and distribution list for Final Report of System Performance of TRe Vacuum Enhanced LNAPL and Groundwater Recovery and Treatment System, January 1998 to January 1999, Site 10, Navy Fuel Farm | Jim Colter/NORTRDIV | Pam Reigh/PADEP |
1 | 56 | 56.pdf | 09.01.00.0014 | 7/14/1999 | 2 | Letter: Request for identification of substantive chemical- and location- specific requirements of CommonwealTR environmental laws TRat are potential applicable or relevant and appropriate requirements (ARARs) for TRe Willow Grove Site, Horsham Township, PA | Jim Colter/NORTRDIV | Pam Reigh/PADEP |
13.01 Community Relations Correspondence - Basewide | ||||||||
2 | 233 | 233.pdf | 13.01.00.0001 | 1/24/1989 | 1 | Transmittal Letter: December 15, 1988 TRC Meeting Minutes | Tom Sheckels/NORTRDIV | TRC |
2 | 235 | 235.pdf | 13.01.00.0002 | 3/20/1989 | 1 | Transmittal Letter: March 10, 1989 TRC Meeting Minutes | Tom Sheckels/NORTRDIV | TRC |
2 | 237 | 237.pdf | 13.01.00.0003 | 6/21/1989 | 1 | Transmittal Letter: May 25, 1989 TRC Meeting Minutes | Tom Sheckels/NORTRDIV | TRC |
2 | 239 | 239.pdf | 13.01.00.0004 | 9/1/1989 | 1 | Transmittal Letter: August 10, 1989 TRC Meeting Minutes | Tom Sheckels/NORTRDIV | TRC |
2 | 241 | 241.pdf | 13.01.00.0005 | 12/1/1989 | 1 | Transmittal Letter: October 12, 1989 TRC Meeting Minutes | Tom Sheckels/NORTRDIV | TRC |
2 | 243 | 243.pdf | 13.01.00.0006 | 3/7/1990 | 1 | Transmittal Letter: January 18, 1990 TRC Meeting Minutes | Tom Sheckels/NORTRDIV | TRC |
2 | 245 | 245.pdf | 13.01.00.0007 | 6/19/1990 | 1 | Transmittal Letter: May 18, 1990 TRC Meeting Minutes | Tom Sheckels/NORTRDIV | TRC |
2 | 246 | 246.pdf | 13.01.00.0008 | 8/8/1990 | 1 | Letter: Cancellation of August 16, 1990 TRC Meeting | Adrienne Townsel/NORTRDIV | TRC |
2 | 247 | 247.pdf | 13.01.00.0009 | 12/6/1990 | 1 | Letter: Reschedule January 10, 1991 TRC Meeting to January 8, 1991 | Adrienne Townsel/NORTRDIV | TRC |
2 | 255 | 255.pdf | 13.01.00.0010 | 1/16/1991 | 1 | Transmittal Letter: January 16, 1991 TRC Meeting Minutes | Frank Klanchar/NORTRDIV | TRC |
2 | 249 | 249.pdf | 13.01.00.0011 | 3/27/1991 | 1 | Transmittal Letter: January 8, 1991 TRC Meeting Minutes | Tom Sheckels/NORTRDIV | TRC |
Transmittal Letter: and distribution list for TRe | ||||||||
3 | 335 | 335.pdf | 13.01.00.0012 | 5/30/1991 | 2 | Extended Site Inspections and Remedial Investigations | Tom Sheckels/NORTRDIV | TRC |
2 | 251 | 251.pdf | 13.01.00.0013 | 6/17/1991 | 1 | Transmittal Letter: May 16, 1991 TRC Meeting Minutes | Tom Sheckels/NORTRDIV | TRC |
2 | 253 | 253.pdf | 13.01.00.0014 | 8/27/1991 | 1 | Transmittal Letter: July 25, 1991 TRC Meeting Minutes | Frank Klanchar/NORTRDIV | TRC |
Transmittal Letter: and distribution list and schedule | ||||||||
3 | 336 | 336.pdf | 13.01.00.0015 | 9/17/1991 | 3 | for Final Plan of Action for TRe Extended Site Inspections and Remedial Investigations | Frank Klanchar/NORTRDIV | TRC |
2 | 256 | 256.pdf | 13.01.00.0016 | 11/6/1991 | 1 | Letter: Reschedule November 14, 1991 TRC Meeting to January 16, 1992 | Frank Klanchar/NORTRDIV | TRC |
3 | 338 | 338.pdf | 13.01.00.0017 | 1/9/1992 | 2 | Transmittal Letter: Final Interim Report at TRe Navy Fuel Farm, November 1990 - July 1991 | Frank Klanchar/NORTRDIV | TRC |
3 | 337 | 337.pdf | 13.01.00.0018 | 1/24/1992 | 2 | Transmittal Letter: and distribution list for Final Draft Extended Site Inspections (ESI) | Frank Klanchar/NORTRDIV | TRC |
2 | 257 | 257.pdf | 13.01.00.0019 | 4/16/1992 | 1 | Letter: Reschedule April 13, 1992 TRC Meeting to June 18, 1992 | Frank Klanchar/NORTRDIV | TRC |
2 | 258 | 258.pdf | 13.01.00.0020 | 7/9/1992 | 2 | Notice: TRC Meeting notification; July 30, 1992 | Frank Klanchar/NORTRDIV | TRC |
2 | 260 | 260.pdf | 13.01.00.0021 | 10/8/1992 | 1 | Transmittal Letter: July 30, 1992 TRC Meeting Minutes | Frank Klanchar/NORTRDIV | TRC |
2 | 261 | 261.pdf | 13.01.00.0022 | 11/12/1992 | 1 | Letter: Cancellation of November 19, 1992 TRC Meeting | Frank Klanchar/NORTRDIV | TRC |
2 | 263 | 263.pdf | 13.01.00.0023 | 3/16/1993 | 1 | Letter: Reschedule March 30, 1993 TRC Meeting to April 1, 1993 | Tom Sheckels/NORTRDIV | TRC |
2 | 265 | 265.pdf | 13.01.00.0024 | 5/4/1993 | 1 | Transmittal Letter: April 1, 1993 TRC Meeting Minutes | Tom Sheckels/NORTRDIV | TRC |
1 | 88 | 88.pdf | 13.01.00.0025 | 8/11/1994 | 2 | Trip Report: Site Visit to Willow Grove regarding proposed sale of private property adjacent to NAS Willow Grove. | Jim Colter/NORTRDIV | Navy |
1 | 165 | 165.pdf | 13.01.00.0026 | 10/2/1996 | 2 | Notice: RAB Meeting notification; October 2, 1996 | N/A | N/A |
1 | 164 | 164.pdf | 13.01.00.0027 | 11/1/1996 | 1 | Transmittal Letter: October 2, 1996 RAB Meeting Minutes | Russ Turner/BRE | Jim Colter/NORTRDIV |
1 | 167 | 167.pdf | 13.01.00.0028 | 12/20/1996 | 3 | Transmittal Letter: of Meeting Notice (attached); letter from Jim Edmond (Willow Grove) submitting Glossary of Terms to RAB Members | Russ Turner/BRE | Jim Colter/NORTRDIV |
1 | 123 | 123.pdf | 13.01.00.0029 | 1/30/1997 | 1 | Notification of next RAB meeting and tour of air station | Paul Greco/Willow Grove | RAB |
1 | 170 | 170.pdf | 13.01.00.0030 | 4/9/1997 | 1 | Notice: RAB Meeting notification; April 9, 1997 | N/A | N/A |
1 | 172 | 172.pdf | 13.01.00.0031 | 4/23/1997 | 1 | Transmittal: April 9, 1997 RAB Meeting Minutes | Russ Turner/BRE | Jim Colter/NORTRDIV |
1 | 28 | 28.pdf | 13.01.00.0032 | 5/20/1997 | 2 | Transmittal Letter: and distribution list for Draft Remedial Decision Document for Installation Restoration Site 10 - Navy Fuel Farm for review | Jim Colter/NORTRDIV | RAB |
1 | 47 | 47.pdf | 13.01.00.0033 | 5/20/1997 | 2 | Transmittal Letter: and distribution list Draft Sampling and Analysis Report for Site 10 at TRe Navy Fuel Farm for review | Jim Colter/NORTRDIV | RAB |
1 | 135 | 135.pdf | 13.01.00.0034 | 7/30/1997 | 2 | Tinius Olsen manufacturing facility requests for information on any releases/spills of MTBE at Willow Grove | David Fennimore/EarTR Data | Jim Colter/NORTRDIV |
1 | 32 | 32.pdf | 13.01.00.0035 | 8/15/1997 | 19 | Letter: Responses to comments from Alix Rauschman (former RAB Member) and Eric Lindhult (RAB Member) (attached) to TRe Draft Remedial Design Document for TRe Navy Fuel Farm, CTO 0074 | Carl Reitenbach/EA | Jim Colter/NORTRDIV |
1 | 136 | 136.pdf | 13.01.00.0036 | 8/15/1997 | 1 | Letter: Response to EarTR Data request dated July 30, 1997 RE: Information on releases/spills of MTBE at Willow Grove | Jim Colter/NORTRDIV | David Fennimore/EarTR Data |
1 | 26 | 26.pdf | 13.01.00.0037 | 8/22/1997 | 2 | Transmittal Letter: Final Remedial Decision Document for Installation Restoration Site 10 - Navy Fuel Farm | Jim Colter/NORTRDIV | RAB |
1 | 48 | 48.pdf | 13.01.00.0038 | 8/22/1997 | 2 | Transmittal Letter: and distribution list Final Sampling and Analysis Report for Site 10 at TRe Navy Fuel Farm | Jim Colter/NORTRDIV | RAB |
1 | 133 | 133.pdf | 13.01.00.0039 | 9/10/1997 | 2 | Transmittal: and distribution list of Final document reporting TRe results of TRe site investigation near TRe Tinius Olsen facility | Jim Colter/NORTRDIV | RAB |
1 | 174 | 174.pdf | 13.01.00.0040 | 10/2/1997 | 1 | Transmittal Letter: September 10, 1997 RAB Meeting Minutes | Mark Leemaster/NASJRB Willow Grove | RAB |
1 | 175 | 175.pdf | 13.01.00.0041 | 1/14/1998 | 1 | Notice: RAB Meeting notification; January 14, 1998 | Russ Turner/Tetra Tech NUS | RAB |
1 | 177 | 177.pdf | 13.01.00.0042 | 2/6/1998 | 1 | Transmittal Letter: January 14, 1998 RAB Meeting Minutes | Russ Turner/BRE | RAB |
1 | 37 | 37.pdf | 13.01.00.0043 | 2/25/1998 | 2 | Transmittal Letter : and distribution list for Draft Sampling and Analysis Report for Remedial Action at TRe Navy Fuel Farm for review | Jim Colter/NORTRDIV | RAB |
1 | 178 | 178.pdf | 13.01.00.0044 | 3/4/1998 | 2 | Notice: RAB Meeting notification; March 4, 1998 | Russ Turner/Tetra Tech NUS | RAB |
1 | 58 | 58.pdf | 13.01.00.0045 | 4/20/1998 | 3 | Transmittal Letter: and distribution lists for TRe Draft Phase II Remedial Investigation (RI) for Sites 1, 2, 3, and 5 for review | Jim Colter/NORTRDIV | RAB |
1 | 124 | 124.pdf | 13.01.00.0046 | 5/5/1998 | 1 | Cancellation of May 13, 1998 TRC Meeting and schedule for next RAB meeting | Jim Edmond/Willow Grove | RAB |
1 | 39 | 39.pdf | 13.01.00.0047 | 6/11/1998 | 2 | Transmittal Letter: and distribution list for Final Sampling and Analysis Report for Remedial Action at TRe Navy Fuel Farm | Jim Colter/NORTRDIV | RAB |
1 | 180 | 180.pdf | 13.01.00.0048 | 9/16/1998 | 2 | Notice: RAB Meeting notification; September 16, 1998 | Russ Turner/Tetra Tech NUS | RAB |
1 | 182 | 182.pdf | 13.01.00.0049 | 10/1/1998 | 1 | Transmittal Letter: September 16, 1998 RAB Meeting Minutes | Russ Turner/Tetra Tech NUS | RAB |
3 | 346 | 346.pdf | 13.01.00.0050 | 10/11/1998 | 1 | Letter: Comments to Draft Phase II RI Report for NASJRB Willow Grove | Eric Linhult. P.E./local resident (RAB member) | Jim Colter/NORTRDIV |
3 | 345 | 345.pdf | 13.01.00.0051 | 10/15/1998 | 1 | Letter: Comment - Phase II RI Report for NASJRB Willow Grove | Kaye Maxwell-Martin/General Instrument Corporation (RAB member) | Jim Colter/NORTRDIV |
1 | 183 | 183.pdf | 13.01.00.0052 | 3/17/1999 | 2 | Notice: RAB Meeting notification; April 7, 1999 | Jim Colter/NORTRDIV | RAB |
1 | 185 | 185.pdf | 13.01.00.0053 | 4/30/1999 | 1 | Transmittal Letter: April 7, 1999 RAB Meeting Minutes | Russ Turner/Tetra Tech NUS | RAB |
1 | 186 | 186.pdf | 13.01.00.0054 | 6/30/1999 | 2 | Notice: RAB Meeting notification; July 14, 1999 | Russ Turner/Tetra Tech NUS | RAB |
1 | 188 | 188.pdf | 13.01.00.0055 | 7/29/1999 | 1 | Transmittal: July 14, 1999 RAB Meeting Minutes | Russ Turner/Tetra Tech NUS | RAB |
1 | 189 | 189.pdf | 13.01.00.0056 | 10/8/1999 | 1 | Letter: RAB Meeting rescheduled from October 13, 1999 to December 8, 1999 | Gilbert Viera/NASJRB Willow Grove, Liz Gemmill/RAB Co-chairperson | RAB |
1 | 190 | 190.pdf | 13.01.00.0057 | 11/17/1999 | 2 | RAB Meeting notification; December 8, 1999 | Russ Turner/Tetra Tech NUS | N/A |
1 | 192 | 192.pdf | 13.01.00.0058 | 1/6/2000 | 2 | Transmittal Letter: December 8, 1999 RAB Meeting Minutes | Russ Turner/Tetra Tech NUS | RAB |
1 | 193 | 193.pdf | 13.01.00.0059 | 2/23/2000 | 2 | Notice: RAB Meeting notification; March 15, 2000 | Russ Turner/Tetra Tech NUS | RAB |
1 | 195 | 195.pdf | 13.01.00.0060 | 4/17/2000 | 2 | Transmittal Letter: March 15, 2000 RAB Meeting Minutes | Russ Turner/Tetra Tech NUS | RAB |
1 | 196 | 196.pdf | 13.01.00.0061 | 5/19/2000 | 2 | Notice: RAB Meeting notification; June 7, 2000 | Russ Turner/Tetra Tech NUS | RAB |
1 | 198 | 198.pdf | 13.01.00.0062 | 7/7/2000 | 2 | Transmittal Letter: June 7, 2000 RAB Meeting Minutes | Russ Turner/Tetra Tech NUS | RAB |
1 | 199 | 199.pdf | 13.01.00.0063 | 8/30/2000 | 2 | Notice: RAB Meeting notification; September 13, 2000 | Russ Turner/Tetra Tech NUS | RAB |
1 | 201 | 201.pdf | 13.01.00.0064 | 10/19/2000 | 2 | Transmittal Letter: September 13, 2000 RAB Meeting Minutes | Russ Turner/Tetra Tech NUS | RAB |
1 | 202 | 202.pdf | 13.01.00.0065 | 11/20/2000 | 2 | Notice: RAB Meeting notification; December 6, 2000 | Russ Turner/Tetra Tech NUS | RAB |
1 | 204 | 204.pdf | 13.01.00.0066 | 1/4/2001 | 2 | Transmittal Letter: December 6, 2000 RAB Meeting Minutes | Russ Turner/Tetra Tech NUS | RAB |
1 | 205 | 205.pdf | 13.01.00.0067 | 2/23/2001 | 2 | Notice: RAB Meeting notification; March 7, 2001 | Russ Turner/Tetra Tech NUS | RAB |
1 | 207 | 207.pdf | 13.01.00.0068 | 4/30/2001 | 2 | Transmittal Letter: March 7, 2001 RAB Meeting Minutes | Russ Turner/Tetra Tech NUS | RAB |
1 | 208 | 208.pdf | 13.01.00.0069 | 5/20/2001 | 2 | Notice: RAB Meeting notification; June 6, 2001 | Russ Turner/Tetra Tech NUS | RAB |
1 | 210 | 210.pdf | 13.01.00.0070 | 7/3/2001 | 2 | Transmittal Letter: June 6, 2001 RAB Meeting Minutes | Russ Turner/Tetra Tech NUS | RAB |
1 | 211 | 211.pdf | 13.01.00.0071 | 10/30/2001 | 1 | Letter: of cancellation of November 7, 2001 RAB Meeting | W.R. Schoen/NASJRB Willow Grove | RAB |
3 | 344 | 344.pdf | 13.01.00.0072 | undated | 3 | Letter: Document Review - Phase II RI Report for NASJRB Willow Grove | Jack Dunleavy/local resident (RAB member) | Jim Colter/NORTRDIV |
1 | 169 | 169.pdf | 13.01.00.0073 | unknown | 7 | BRE responses to comments from Alix Rauschman (RAB) and Eric Lindhult (RAB) on TRe Phase II RI/FS Work Plan | Brown & Root Environmental | N/A |
3 | 348 | 348.pdf | 13.01.00.0074 | 3/27/2002 | 32 | Letter: and attachments of RAB meeting stenographers transcript | Russ Turner - Tetra Tech NUS | Jim Colter/NORTRDIV |
3 | 349 | 349.pdf | 13.01.00.0075 | 4/2/2002 | 4 | Meeting Minutes: RAB meeting Minutes | Russ Turner - Tetra Tech NUS | Jim Colter/NORTRDIV |
13.03 Community Relations Technical Review Committee (TRC) Meeting Minutes - Basewide | ||||||||
2 | 232 | 232.pdf | 13.03.00.0001 | 12/15/1988 | 6 | Meeting Minutes: from December 15, 1988 Technical Review Committee (TRC) Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 234 | 234.pdf | 13.03.00.0002 | 3/13/1989 | 6 | Meeting Minutes: (draft) from March 10, 1989 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 236 | 236.pdf | 13.03.00.0003 | 5/25/1989 | 4 | Meeting Minutes: from May 25, 1989 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 238 | 238.pdf | 13.03.00.0004 | 8/10/1989 | 4 | Meeting Minutes: from August 10, 1989 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 240 | 240.pdf | 13.03.00.0005 | 10/12/1989 | 57 | Meeting Minutes: from October 12, 1989 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 242 | 242.pdf | 13.03.00.0006 | 1/18/1990 | 5 | Meeting Minutes: from January 18, 1990 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 244 | 244.pdf | 13.03.00.0007 | 5/18/1990 | 6 | Meeting Minutes: from May 18, 1990 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 248 | 248.pdf | 13.03.00.0008 | 1/8/1991 | 3 | Meeting Minutes: from January 8, 1991 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 254 | 254.pdf | 13.03.00.0009 | 1/16/1991 | 9 | Meeting Minutes: from January 16, 1991 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 250 | 250.pdf | 13.03.00.0010 | 5/16/1991 | 13 | Meeting Minutes: from May 16, 1991 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 252 | 252.pdf | 13.03.00.0011 | 7/25/1991 | 10 | Meeting Minutes: from July 25, 1991 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 259 | 259.pdf | 13.03.00.0012 | 7/30/1992 | 7 | Meeting Minutes: from July 30, 1992 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
2 | 264 | 264.pdf | 13.03.00.0013 | 4/1/1993 | 7 | Meeting Minutes: from April 1, 1993 TRC Meeting | Jim Colter/NORTRDIV | Meeting Attendees |
3 | 319 | 319.pdf | 13.03.00.0014 | 9/24/1994 | 13 | Approval of Plan for Final Disposition of Soil Piles at TRe Navy Fuel Farm | NORTRDIV | TRC |
13.04 Community Relations Plan - Basewide | ||||||||
1 | 163 | 163.pdf | 13.04.00.0001 | 12/1/1997 | 80 | Report: Community Relations Plan, CTO 277 | Brown & Root Environmental | Navy |
13.05 Community Relations Public Meeting Minutes - Basewide | ||||||||
1 | 166 | 166.pdf | 13.05.00.0001 | 10/2/1996 | 21 | Meeting Minutes: from October 2, 1996 RAB Meeting | N/A | N/A |
1 | 168 | 168.pdf | 13.05.00.0002 | 1/15/1997 | 24 | Meeting Minutes from January 15, 1997 RAB Meeting | N/A | N/A |
1 | 171 | 171.pdf | 13.05.00.0003 | 4/9/1997 | 11 | Meeting Minutes: from April 9, 1997 RAB Meeting | N/A | N/A |
1 | 173 | 173.pdf | 13.05.00.0004 | 9/10/1997 | 29 | Meeting Minutes: from September 10, 1997 RAB Meeting | N/A | N/A |
2 | 219 | 219.pdf | 13.05.00.0005 | 9/25/1997 | 50 | Transcript of RAB Meeting; September 10, 1997 w/ transmittal | Russ Turner/BRE | Jim Colter/NORTRDIV |
1 | 176 | 176.pdf | 13.05.00.0006 | 1/14/1998 | 38 | Meeting Minutes: from TRe January 14, 1998 RAB Meeting | N/A | N/A |
2 | 220 | 220.pdf | 13.05.00.0007 | 2/6/1998 | 91 | Transcript of RAB Meeting; January, 14, 1998 w/ transmittal | Russ Turner/BRE | Jim Colter/NORTRDIV |
1 | 179 | 179.pdf | 13.05.00.0008 | 3/4/1998 | 13 | Meeting Minutes: from March 4, 1998 RAB Meeting | N/A | N/A |
2 | 221 | 221.pdf | 13.05.00.0009 | 4/15/1998 | 70 | Transcript of RAB Meeting; March 4, 1998 w/ transmittal | Russ Turner/BRE | Jim Colter/NORTRDIV |
1 | 181 | 181.pdf | 13.05.00.0010 | 9/16/1998 | 23 | Meeting Minutes: from September 16, 1998 RAB Meeting | N/A | N/A |
2 | 222 | 222.pdf | 13.05.00.0011 | 12/24/1998 | 62 | Transcript of RAB Meeting; December 9, 1998 w/ transmittal | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 184 | 184.pdf | 13.05.00.0012 | 4/7/1999 | 29 | Meeting Minutes: from TRe April 7, 1999 RAB Meeting | Russ Turner/Tetra Tech NUS | RAB |
2 | 223 | 223.pdf | 13.05.00.0013 | 4/20/1999 | 89 | Transcript of RAB Meeting; April 7, 1999 w/ transmittal | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 187 | 187.pdf | 13.05.00.0014 | 7/14/1999 | 5 | Meeting Minutes from TRe July 14, 1999 RAB Meeting | Russ Turner/Tetra Tech NUS | RAB |
2 | 224 | 224.pdf | 13.05.00.0015 | 7/22/1999 | 60 | Transcript of RAB Meeting; July 14, 1999 w/ transmittal | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 191 | 191.pdf | 13.05.00.0016 | 12/8/1999 | 19 | Meeting Minutes: from December 8, 1999 RAB Meeting | Russ Turner/Tetra Tech NUS | RAB |
2 | 225 | 225.pdf | 13.05.00.0017 | 1/7/2000 | 84 | Transcript of RAB Meeting; December 8, 1999 w/ transmittal | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 194 | 194.pdf | 13.05.00.0018 | 3/15/2000 | 6 | Meeting Minutes from March 15, 2000 RAB Meeting | Russ Turner/Tetra Tech NUS | RAB |
2 | 226 | 226.pdf | 13.05.00.0019 | 4/3/2000 | 67 | Transcript of RAB Meeting; March 15, 2000 w/ transmittal | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 197 | 197.pdf | 13.05.00.0020 | 6/7/2000 | 21 | Meeting Minutes: from June 7, 2000 RAB Meeting | Russ Turner/Tetra Tech NUS | RAB |
2 | 227 | 227.pdf | 13.05.00.0021 | 7/3/2000 | 113 | Transcript of RAB Meeting; June 7, 2000 w/ transmittal | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
2 | 228 | 228.pdf | 13.05.00.0022 | 10/6/2000 | 47 | Transcript of RAB Meeting; September 13, 2000 w/ transmittal | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 200 | 200.pdf | 13.05.00.0023 | 10/17/2000 | 5 | Meeting Minutes: from September 13, 2000 RAB Meeting | Russ Turner/Tetra Tech NUS | RAB |
1 | 203 | 203.pdf | 13.05.00.0024 | 12/6/2000 | 4 | Meeting Minutes: from December 6, 2000 RAB Meeting | Russ Turner/Tetra Tech NUS | RAB |
2 | 229 | 229.pdf | 13.05.00.0025 | 12/22/2000 | 31 | Transcript of RAB Meeting; December 6, 2000 w/ transmittal | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 206 | 206.pdf | 13.05.00.0026 | 3/7/2001 | 34 | Meeting Minutes: from March 7, 2001 RAB Meeting | Russ Turner/Tetra Tech NUS | RAB |
2 | 230 | 230.pdf | 13.05.00.0027 | 3/26/2001 | 64 | Transcript of RAB Meeting; March 7, 2001 w/ transmittal | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
1 | 209 | 209.pdf | 13.05.00.0028 | 6/6/2001 | 15 | Meeting Minutes: from June 6, 2001 RAB Meeting | Russ Turner/Tetra Tech NUS | N/A |
2 | 231 | 231.pdf | 13.05.00.0029 | 6/25/2001 | 55 | Transcript of RAB Meeting; June 6, 2001 wiTR transmittal | Russ Turner/Tetra Tech NUS | Jim Colter/NORTRDIV |
13.06 Community Relations Fact Sheets - Basewide | ||||||||
1 | 120 | 120.pdf | 13.06.00.0001 | 2/27/1995 | 3 | Draft Restoration Advisory Board (RAB) Fact Sheet (fax) | Jack Dunleavy/NORTRDIV | Jim Colter/NORTRDIV |
1 | 125 | 125.pdf | 13.06.00.0002 | 7/23/1996 | 6 | Fact Sheet: Undated (fax) | Navy | N/A |
1 | 126 | 126.pdf | 13.06.00.0003 | 8/1/1996 | 8 | Fact Sheet: No. 2, August 1996 | Navy | N/A |
1 | 127 | 127.pdf | 13.06.00.0004 | 12/1/1997 | 5 | Fact Sheet: No. 3, December 1997 | Navy | N/A |
1 | 128 | 128.pdf | 13.06.00.0005 | 9/1/2000 | 8 | Fact Sheet: No. 4, September 2000 | Navy | N/A |
13.08 Press Releases/Public Notices/News Clippings - Basewide | ||||||||
1 | 138 | 138.pdf | 13.08.00.0001 | 8/22/1994 | 2 | News Release: Announcing EPA proposal of NASJRB Willow Grove for National Priorities List (fax) | EPA Region III | N/A |
1 | 121 | 121.pdf | 13.08.00.0002 | 7/21/1995 | 1 | Public Notice: Invitation to join RAB (fax) | Paul Greco/Willow Grove | Jack Dunleavy/NORTRDIV |
1 | 122 | 122.pdf | 13.08.00.0003 | 9/7/1996 | 2 | Notice of Formation Meeting of TRe Restoration Advisory Board (RAB) (fax) | Dan McCaffrey/Horsham Township Chamber of Commerce | Jim Colter/NORTRDIV |
Public Notice: Action Memorandum for | ||||||||
1 | 93 | 93.pdf | 13.08.00.0004 | 10/7/1998 | 1 | recommended removal action at Site 1 - Privet Road Compound | Navy | N/A |
  |   | PHIL-24605_20120117.pdf | PHIL-24605 Project # 02014 | Dec. 23, 2011 | 10 pages | Final Interim Remedial Action Completion Report (IRACR) Site 1 - Privet Road Compound Naval Air Station Joint Reserve Base (NAS JRB) - Willow Grove | Andrew Frebowitz Project Manager Tetra Tech NUS, Inc. | Lisa Cunningham (3HS11) U.S. Environmental Protection Agency Philadelphia |
16.01 Natural Resource Trustees Correspondence - Basewide | ||||||||
1 | 71 | 71.pdf | 16.01.00.0001 | 9/25/1998 | 2 | Comments: NOAA comments on TRe Phase II RI | Simeon Hahn/NOAA | Barbara Okorn/EPA III |
17.01 Final Report Documents | ||||||||
9 |   | Final NAS Willow Grove 06-22-06 revised 05-24-2007.pdf |   | 6/13/2006 | 125 pages | Final Environmental Condition of Property Report for the Naval Air Station Joint Reserve Base Willow Grove, Pennsylvania (note: this document contains revised pages at the end, correcting errors in maps originally issued in Appendix C) | Dept. of the Navy/BRAC | For Public Review |
  |   | Distribution of Final CERFA Report Willow Grove |   | June 7, 2007 | 2 pages | Distribution of Final CERFA Report for Naval Air Station Joint Reserve Base Willow Grove, PA | Robert Lewandowski, P.E. BRAC PMO Northeast | Lisa Cunningham, Remedial Project Manager, U.S. EPA Region 3, Philadelphia, PA |
15 |   | FinalCERFA Report Willow Grove.pdf |   | April 2007 | 1,773 pages | CERFA Identification of Uncontaminated Property at the Naval Air Station Joint Reserve Base Willow Grove, Pennsylvania | Steven P. Giannino, P.E. TETRA TECH NUS, Inc. | BRAC PMO Northeast |
note: The above file containing the full report "Final CERFA Identification of Uncontaminated Property at the Naval Air Station Joint Reserve Base Willow Grove, Pennsylvania" may be too large for downloading or emailing. To remedy this problem, Horsham Township Library has divided the report into seven parts listed below. These sections should be small enough for most Internet service providers to download. | ||||||||
CD15_part1 CD15_part2 CD15_part3 CD15_part4 CD15_part5 CD15_part6 CD15_part7 |   | FinalCERFA Report Willow Grove - Part 1: Title - Statutory Authority FinalCERFA Report Willow Grove - Part 2: Appendix A Government File Review Documentation FinalCERFA Report Willow Grove - Part 3: Appendix B Property Records FinalCERFA Report Willow Grove - Part 4: Appendix C Aerial Photographs FinalCERFA Report Willow Grove - Part 5: Appendix D Visual Site Inspection FinalCERFA Report Willow Grove - Part 6: Appendix E Photographs of Adjacent Property FinalCERFA Report Willow Grove - Part 7: Appendix F Interviews & Appendix G Sampling Data & Appendix H Regulator Comments |
  | April 2007 | Part1: 36 pages Part 2: 803 pages Part 3: 29 pages Part 4: 45 pages Part 5: 796 pages Part 6: 50 pages Part 7: 9 pages |
CERFA Identification of Uncontaminated Property | Steven P. Giannino, P.E. TETRA TECH NUS, Inc. | BRAC PMO Northeast |
19 |   | 21273Final.pdf |   | Sept 2007 | 35 | Record of Decision Site 5 Soil Operable Unit 4 (OU 4) | Russell E. Turner, Tetra Tech NUS, Inc. | Environmental Protection Agency Region 3 |
CD #60 | PHIL-24964 Project # 02014 | Final_WG_Site_5_ROD_093012.pdf Non-Significant Post Record of Decision Change for Site 5 (revised figure 2-5) | Contract # N62470-08-D-1001 Contract Task Order (CTO) No. WE05 | Sept. 2012 | 61 pages | Record of Decision Site 5 Groundwater Operable Unit 2 (OU2) for Site 5 - Former Fire Training Area | Andrew Frebowitz, Project Manager Tetra Tech, Inc. | Brian Helland Base Realignment and Closure Program Management Office, Northeast 4911 South Broad St. Philadelphia, PA 19112-1303 |
  | PHIL-24598 | PHIL-24598.pdf |   | Dec. 16, 2011 | 4 pages | Report of Results Site 5 - Fire Training Area Groundwater sampling for perfluorooctanoic acid (PFOA), perfluorooctane sulfate (PFOS), and 1.4-dioxane in selected Site 5 monitoring wells | Andrew Frebowitz, Project Mgr. TETRA TECH NUS, Inc. | Brian Helland Base Realignment & Closure Program Management Office, NE 4911 S. Broad St. Philadelphia, PA 19112-1303 |
21 |   | 20080109.pdf |   | 10/25/2007 | 38 | Record of Consensus Agreement No Action Decision Rifle Range No. 1 Site 6 | Russell E. Turner, Tetra Tech NUS, Inc. | Environmental Protection Agency Region 3 and Navy BRAC Environmental Coordinator |
22 |   | PHIL-21434.pdf |   | January 2008 | 79 | Focused Feasibility Study for Site 1 - Privet Road Compound Groundwater (OU 3) | Russell E. Turner, Tetra Tech NUS, Inc. | Naval Facilities Engineering Command Mid-Atlantic |
29 |   | CD29.pdf | Contract Task Order 003 | Sept. 2008 | 47 | Record of Decision Site 1 Groundwater Operable Unit 3 (OU 3) | TETRA TECH, INC. | Naval Facilities Engineering Command Mid-Atlantic |
31 |   | CD31.pdf | Contract Task Order 412 | Sept. 2008 | 56 | Record of Consensus Agreement No Action Decision for Site 7 - Abandoned Rifle Range No. 2 |   | Naval Facilities Engineerinf Command Mid-Atlantic |
38 |   | CD38.pdf | Contract Task Order 412 | Jan. 2009 | 45 | Record of Consensus Agreement No Action Decision Site 4 - North End Landfill | TETRA TECH, INC. | Naval Facilities Engineerinf Command Mid-Atlantic |
44 | PHIL-22992 | CD44.pdf | Contract Task Order No. 003 | June 2009 | 180 | Remedial Investigation Report Addendum for Site 2 - Antenna Field Landfill | TETRA TECH NUS, INC. Russell E. Turner | Naval Facilities Engineering Command Mid-Atlantic |
50 | PHIL-24094 | CD50.pdf | Contract Task Order WE05 | January 28, 2011 | 767 pages | Phase I Remedial Investigation Data Report for Site 12 - South Landfill | TETRA TECH NUS, INC. Russell E. Turner, Project Mgr. | Base Realignment and Closure Program Management Office, Northeast |
CD # 69 |   | NAWC-Warminster-Well-Decommissioning-Report_July 2012.pdf |   | July 2, 2012 | 30 pages | Naval Air Warfare Center Warminster Summary Report for Well Decommissioning Activities, May 2012 | Jennifer Good, P.G. H & S Environmental, Inc.Westborough, MA 01581 | Jeffrey Dale, Remedial Project Mgr., BRAC Program Mgmt. Office Northeast, Phila., PA |
CD # 71 |   | Willow-Grove-5-Yr-Report-Final-092513-25129.pdf | PHIL-25381 Project # 02014 Contract # N62470-08-D-1001, Contract Task Order # WE05 | September 2013 | 132 pages | Final Five-Year Review for Former NAS JRB Willow Grove. This is the first five-year review for the former NAS JRB Willow Grove Superfund Site to determine whether the remedy for Operable Unit 3 Site 1 Groundwater remains protective of human health & the environment. | Andrew Frebowitz, Project Manager Tetra Tech, Inc., King of Prussia, PA | Naval Facilities Engineering Command, BRAC Program Magmt. Office East, Phila., PA |
CD# 85 | I.D. #PHIL-25817 | Willow-Grove-Final-Site-5-RACR-093014.pdf | Contract N62470-08-D-1001 Contract Task Order WE05 | September 2014 | 147 pages | FINAL Remedial Action Completion Report Site 5 -- Fire Training Area Groundwater (OU 2) This RACR is a key site closeout document to help streamline site closeout and deletion process under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The purpose of this RACR is to document that the construction of the groundwater bioremediation component of the remedy selected for Site 5 groundwater (OU 2) in the Final Record of Decision (ROD) has been completed and Land Use Controls have been implemented. | Andrew Frebowitz, Project Mgr. Tetra Tech, Inc. King of Prussia, PA 19406-2954 | Naval Facilities Engineering Command Mid-Atlantic 9742 Maryland Ave., Norfolk, VA 23511-3095 |
The following 17 files included in two loose-leaf notebooks comprise the Final Task Specific Plans for 14 buildings and 3 land sites: | ||||||||
CD#86 | I.D. # AIK-14-0220 | FinalTSPBldg4.pdf FinalTSPBldg18.pdf FinalTSPBldg20.pdf FinalTSPBldg22.pdf FinalTSPBldg23.pdf FinalTSPBldg29.pdf FinalTSPBldg77.pdf FinalTSPBldg80.pdf FinalTSPBldg118.pdf FinalTSPBldg140.pdf FinalTSPBldg175.pdf FinalTSPBldg180.pdf FinalTSPBldg601.pdf FinalTSPBldg680.pdf FinalTSPSite1.pdf FinalTSPSite3.pdf FinalTSPSite12.pdf |
Contract # N62470-08-D-001 Task Order: WE42 | October 2014 | FINAL Task Specific Plans, Volume 1: FINAL Task Specific Plan Building 4 Footprint Scoping Survey (17 pages) FINAL Task Specific Plan Building 18 Footprint Scoping Survey (21 p.) FINAL Task Specific Plan Building 20 Footprint Scoping Survey (35 p.) FINAL Task Specific Plan Building 22 Footprint Scoping Survey (36 p.) FINAL Task Specific Plan Building 23 Footprint Scoping Survey (21 p.) FINAL Task Specific Plan Building 29 Footprint Scoping Survey (36 p.) FINAL Task Specific Plan Building 77 Footprint Scoping Survey (21 p.) FINAL Task Specific Plan Building 80 Footprint Scoping Survey (45 p.) FINAL Task Specific Plan Building 118 Footprint Scoping Survey (35 p.) FINAL Task Specific Plan Building 140 Footprint Scoping Survey (34 p.) FINAL Task Specific Plans, Volume 2: FINAL Task Specific Plan Building 175 Footprint Scoping Survey (36 p.) FINAL Task Specific Plan Building 180 Footprint Scoping Survey (39 p.) FINAL Task Specific Plan Building 601 Footprint Scoping Survey (26 p.) FINAL Task Specific Plan Building 680 Footprint Scoping Survey (40 p.) FINAL Task Specific Plan IR Site 1, Privet Road Compound Scoping Survey (21 p.) FINAL Task Specific Plan IR Site 3, Ninth Street Landfill Scoping Survey (23 p.) FINAL Task Specific Plan IR Site 12, South Landfill Scoping Survey (22 p.) |
Tetra Tech, Inc. 661 Anderson Dr., Suite 5 Pittsburgh, PA | Dept. of the Navy Base Realignment & Closure Program Mgmt. Office NE Philadelphia, PA | |
CD#89 | PHIL-26008 | FinalStatusBioremediationSite5.pdf |   | April 2015 | 18 pages filed at back of notebook containing Final Remedial Action Completion Report Site 5 - Fire Training Area Groundwater (OU 2), Sept. 2014 | Final Status Report for the Bioremediation at Site 5 - Fire Training Area, Former Naval Air Station Joint Reserve Base - Willow Grove | Andrew Frebowitz, Project Mgr. Tetra Tech, Inc. | Brian Helland Base Realignment and Closure Program Mgmt. Office, Northeast 4911 South Broad St. Philadelphia, PA 19112-1303 |
CD#90 | PHIL-25763 | WillowGrove_OPS_Eval_Rpt_050715.pdf |   | May 2015 | 1,617 pages Report: 42 pages, Lab Reports: pages 43 - 1,617 | Operating Properly and Successfully Evaluation Report Site 5 Fire Training Area Groundwater (OU2) | Andrew Frebowitz, Project Mgr. Tecta Tech | Naval Facilities Engineering Command Mid-Atlantic 9742 Maryland Avenue Norfolk, VA 23511-3095 |
  | ||||
---|---|---|---|---|
The Horsham Township Library website
is now hosted at horshamlibrary.org. |
||||
  |